Sustained Performance in Radiation Protection at Vogtle Clark Bourne Plant Health Physicist – Vogtle (USA)

Slides:



Advertisements
Similar presentations
Human Performance: Observation Principles of Excellence
Advertisements

EMS Checklist (ISO model)
Where are we now? D.Napier / W.Crawford Dropped Object Progress.
OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
Braidwood Station Alternate Post Peroxide Cleanup Methodology.
Testing of Dura-Solution at Comanche Peak n The following test results were performed and recorded by the Comanche Peak Radiation Protection Department.
Scope Management Solutions “Best In Class” Technical Support - Small Best Practices Presentation “Materials Management Safety Excellence”
Contractor Safety Training] Contractor Safety Training What's New – What's Hot.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
1 10 CFR Part 26 Subpart I Managing Fatigue Kamishan Martin Human Factors Engineering June 23, 2010 HPRCT conference.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
1 INTRUSION ALARM TECHNOLOGY LOCAL VS. MONITORING.
Ettalong Public School Parent Information Session
Radiation Protection Technology High Radiation Area Access and Control Radiological Safety and Response RPT-243-PE-7.
Risk Assessment – An Essential Standard
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
ALARA Activities at Ohi NPP Ohi Nuclear Power Plant Kansai Electric Power Co., Inc.
Green Building Demonstration Project Adam Saling City of San Diego.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
AN OVERVIEW OF THE By: John Hunsicker (Chairman).
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
1 TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Lowe’s Certification and Accreditation.  Systems Boundaries and Functions  Vulnerabilities, Threats, and Threat Sources  Annual Loss Expectancy  Identification.
InCORS INDIANA’S STATEWIDE GNSS-GPS REAL TIME NETWORK Presented by Derek Fuller, PLS Land & Aerial Survey Office.
EPRI Radiation Management Program: Review of Radiation Field Reduction Strategies ISOE Asian Technical Center ALARA Symposium September 8th, 2009 Dennis.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
New Nuclear Build and Evolving Radiation Protection Challenges Dr. Ted Lazo Deputy Head for Radiation Protection Division of Radiation Protection and Radioactive.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Scott Cameron Manager Radiation Protection 2008 International ALARA Symposium ALARA Performance at OPG.
Information System on Occupational Exposure The ISOE Occupational Exposure Database Brian Ahier (OECD Nuclear Energy Agency, ISOE Joint Secretariat) Caroline.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
Improvement of TEPCO’s ALARA Process Shiro TAKAHIRA Tokyo Electric Power Company Radiation Protection Group ISOE-ATC Symposium October 12, 2006, Yuzawa,
Procedure Writing ALARA Radiological Safety and Response RPT-243-PE-2.
Partnering for the Future WIEG Meeting September 16, 2010.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Good Manufacturing Practices – A Regulatory Perspective Presented By: Ashok Kumar Dua Plant Head – Unichem Laboratories (Sikkim )
Matthew Moury Associate Under Secretary for Environment, Health, Safety and Security Office of Environment, Health, Safety and Security EFCOG Executive.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
Presented by: Bob Hite, Radiation Protection Manager Cook Nuclear Plant American Electric Power September 24-25, 2012 Asian ISOE ALARA Symposium Tokyo,
1 ALARA at the Borssele nuclear power plant. 2 ALARA at the Borssele P Borssele  NPP Borssele  In the delta in the Southwest of the Netherlands  KWU.
4´th ISOE European Workshop on Occupational Exposure Management at NPP´s March 2004 – Lyon France “ALARA” versus reactor safety concern - A practical.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Ultrasonic Fuel Cleaning at STP William T. Bullard- CHP STP Health Physics Dominion Engineering, Inc. NATC International ALARA Symposium Orlando, FL January.
1 Braidwood Low Inventory Shutdown Experience Harry Bush ALARA Section Braidwood Nuclear Station 2009 ISOE ALARA Symposium & EPRI Radiation Protection.
Presented to: KEPRI & KHNP Presented by: Dr. Robert Litman RCS Action Levels and Recent Changes to the EPRI Guidelines.
Commonality Initiatives in US Nuclear Power Plants to Improve Radiation Protection Culture & Efficiency W. David Wood Director, Environmental & RP American.
EC/IAEA/ISOE Workshop Portoroz Slovenia April 2002 Electronic Personal Dosimetry Presented by Andy Weeks.
2014 Contractor Safety Training What's New – What's Hot
Current Plant Performance
ALARA Activities at Ohi NPP
The Success of the ALARA Principle – the View of an Inspector
ISOE Asian Technical Center ALARA Symposium September 8th, 2009
Research and Test Reactor Decommissioning Inspections
Cindy Connelly, Sr. Evaluator
Provide Job Coverage for Radiography RP03.09
Sustained Performance
Radiation protection challenges at EDF
Brian Ahier (OECD Nuclear Energy Agency, ISOE Joint Secretariat)
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Sustained Performance in Radiation Protection at Vogtle Clark Bourne Plant Health Physicist – Vogtle (USA)

How did we get where we are? Often times, it felt like… B r u t e F o r c e ! I need more dose! Indira says, “No more dose for you, Buddy!”

Key Factors for Sustained Performance 1) Ownership & Accountability 2) Source Term Management 3) Technology

Key Factors for Sustained Performance Management Commitment to be a top quartile performer Non-outage exposure –Consistently trending down “Every 0.1 mrem counts!” Planning/Scheduling Work Execution through Lessons Learned Work Force Engagement –Focus on Excellence Challenging/Aggressive Goal Setting Constant vigilance on “What Could Go Wrong?” –Use of daily MELT –Use of Operational Risk Awareness process 1) Ownership & Accountability

mrem Routine RWP Exposure Trends Non-outage exposure

Key Factors for Sustained Performance Outage exposure – Outage Scheduling Incorporates Lessons Learned into schedule –HP takes the lead to include contingencies from industry Operating Experience and solicit support from appropriate groups »e.g., core barrel lifts, CRDM volumetric inspections, pzr weld overlays, radiography »Sensitivity and awareness that these events can happen to us! Planners sensitive to plant conditions that impact dose – Contractor Incentives $$$ Dose is 20% of their performance score 1) Ownership & Accountability (cont’d)

Key Factors for Sustained Performance Outage exposure (cont’d) –Mock-up training / Dry Runs for risk significant evolutions SG primary manways/diaphragms Nozzle dams HP surveys –SG channel heads –Under reactor head and reactor cavity SG vacuum bag change-outs Shielding installation Core barrel lifts Tri-nuke filter loading RCS filter change-outs Rx head EXCEL scaffolding CETNAs PZR SWOL 1) Ownership & Accountability (cont’d)

Key Factors for Sustained Performance Implemented EPRI Constant elevated pH program (7. 2) Zinc addition on both units – AOA concerns on Unit 1 resulted in suspension of zinc for Cycle 13 –Approval to add Zn for full cycle received for both units Shutdown Chemistry Controls – Repeatable performance each outage due to consistency and commitment to the process – Constant vigilance to “stay the course” – Use of macroporous resin in shutdown mixed bed demin Ultrasonic Fuel Cleaning – 8 campaigns, 4 per unit Use of tri-nuke filtration in Rx cavity and SFP Use of 0.1 um filtration on RCS filter 2) Source Term Reduction

Key Factors for Sustained Performance Shielding –Permanent shielding support frames for SG handhole platforms –Permanent reactor head shielding –Radwaste Processing Facility design –Design Changes to add several more permanent support frames in containment –Storage of temporary lead shielding in containment –Shielding is on Plant’s Major Issues List –Temporary Shielding usage improvements Purchase of Radishield, head stand shielding for CRDM volumetric inspection, PZR SWOL applications 2) Source Term Reduction (cont’d)

Key Factors for Sustained Performance Examples of Integration of technology to support plant operations: –Identification of leakage inside bioshield at power via HP Robot –Midloop sight glass and reactor cavity level monitored in the control room and OCC via HP cameras –Core Barrel lifts directed through Central Monitoring Station 15 area monitoring teledosimeters used to monitor lift 10 camera views SNC Task Manager in Central – direct communications with lift director in containment 3) Technology

Key Factors for Sustained Performance Use of remote monitoring for high radiological risk tasks –Normal operations Areas where Radiax antenna is available, have remote telemetry to Central Monitoring Station –Radwaste liner/filter surveys –Spent filter placement into liner –Resin sluice monitoring –Area monitoring for zinc injection trending outside containment Localized setup available for other areas (video, audio and telemetry) 3) Technology (cont’d)

Key Factors for Sustained Performance Use of remote monitoring for high radiological risk tasks –Outages All personnel in containment wear teledose Dose management effectiveness for high rad job coverage is quadrupled Permanent design change to wire camera, audio, and telemetry from inside containment all the way to Central Monitoring Station Added to system incrementally over past decade Other groups use the tools 3) Technology (cont’d)

Key Factors for Sustained Performance Use of video/DVD/still pictures to record jobs for training and event reconstruction Acceptance of technology by HP techs and radworkers is the key to RMT success –RMT has changed the persona of the HP tech Use of robotics –HP has a robot for inspections inside bioshield at power –Upper reactor head and under head inspections 3) Technology (cont’d)

Key Factors for Sustained Performance Electronic Survey Mapping system –Radiological Survey Mapping System (RadIS) –Developed by SNC, Vogtle first to implement in 2000 –Over 100,000 surveys electronically generated/approved and submitted to document control (completely paperless) –iPIX photos available on maps showing 360º view of room –Link between Radis and telemetry software allows area monitoring data to be displayed directly on survey maps 3) Technology (cont’d)

Annual Site Exposure and Cycle Average (Rem/Unit) * - 2 outage year