Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.

Slides:



Advertisements
Similar presentations
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Advertisements

Hoshizaki America has built a legacy of quality design, reliability and customer commitment. In our Commercial Series refrigeration line, youll see solutions.
Grain Handler U.S.A..
HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Watts Scale Control Technology. Fort Bend, Independent School District Overcomes Destruction of Equipment from Scale Armstrong Elementary Formerly Quail.
ACTIVE LEARNING PROCESS Prepared By : BHATT HARSHIT 13BEECM026 SOLANKI KAUSHAL 13BEECM033 Guided By : Prof. J M Panchal Branch: Electronics & Communication.
The Challenge How to eliminate the inherent inaccuracy of tote tanks?
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Above Ground Storage Tanks &
29 CFR 1910 Subpart H Hazardous Materials Presenter Roberto Dickinson OSHA Training Institute Instructor.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
PORTABLE TEMPORARY PIG LAUNCHER thomas cornthwaite
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
In the Cement Industry. Circle of Refractory Maintenance.
TraceTek Flashers. 2 Two simple units for visual leak detection In some applications it makes sense to eliminate wiring and expensive control room equipment.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
OSHA Office of Training & Education
Candor Construction Group & Alternative Energy Associates Presents Geothermal Heating & Cooling
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
High Efficiency Commercial Gas HCG Series. 2 American HCG Series The HCG Series High Efficiency Commercial Gas Water Heaters embody all that’s great about.
A Revolutionary New Panelized Construction System Steel frame panels for each project are built in CHS’s manufacturing facility and delivered to job-site.
Sand media filtration is one of the oldest filter processes in the world. Water Tool Modular Filters have made extensive improvements to what is presently.
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
The new Super Multi from TCUK
Norco Tank T/A Meeting  Review current contracting strategy & options for improved strategy  Review details of 2008 & projections for 2009 forward.
The Safe Transfer of Pressurized Gas. Collect the Necessary Tools and Equipment Safety Glasses for EVERYONE SCUBA Tank filled to 3000 psi Fill Station.
Safe Operation of Storage Tanks: Decommissioning and Repair
Remanufactured Engines An Economical Solution. Lift Truck Operating Applications l Light Duty - clean environment, short runs, improved level surfaces.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
TRENTON Casing Filler Presentation
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Cat Electric Power Compact Diesel – Next Generation Product Launch
Precast Concrete Panel Group 6 Alex Cooper Yadir Avila Erjan Kadrakunov.
March 30, 2016 Murrysville Oil & Gas Ordinance Education Series Developer Perspective Huntley & Huntley Petroleum & Natural Gas Exploration Established.
PLAN PRESENTATION ABSTRACT. INTRODUCTION This system has been devised and developed by T.D.Williamson Inc. to enable pipeline operators to carry out maintenance,
Strategic fit Customer segmentation Jotachar JF750 will service both the Offshore & HPI concepts:
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
Boiler Safety Valve Regulations
Automotive Heating And Air Conditioning
Desert Cooler.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Service channels between Tracker and PP1
Leakage control in transmission pipelines
COMPONENTS OF SOLAR WATER HEATER
NORTH TRUNK SEWER REPLACEMENT PROJECT
WATER MAIN REHABILITATION
Capabilities Presented by: (Sales Rep)
MVP vs PUC Custom Chassis Ferrara MVP – Extruded Cab & Body Pierce PUC
Pre-Engineered Water Surface Water Treatment Plants
How to Change a Car Battery
Overfill Prevention Technology and Maintenance
Home You can view all Flo Fab rep order that been sold so you can easily get end user feedback Call factory for password.
Well Repair Installation of Well Liners
Soil Vapor Monitoring Bill Greer IPECA
Soil Vapor Monitoring Bill Greer GTEC
Piping and Instrumentation for Process Industries
Boiler Safety Valve Regulations
SCITEQ End closure series
ABC Company ABC Chemical Complex Engineering Specification
Presentation transcript:

Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage

With a smaller site footprint and easier setup/tear down, Big Pond Tank saves you time and manpower, reducing your costs and allowing you to get your site up and running quickly. Additional savings will be realized in permitting, road impact (93% fewer trucks), heating, management and labor. The following capacities are available: 24,000 bbl with a 125’ diameter footprint plus a 30’ work area 35,000 bbl with a 150’ diameter footprint plus a 30’ work area 48,000 bbl with a 175’ diameter footprint plus a 30’ work area *All work areas are outside the tank. Manufactured to Your Specifications

Comparison Conventional Fracs DEQ permitting required in some areas Groundwater study required in some areas Intensive cost of site preparation for below- ground pit Berm liner cost and/or reclamation of below- ground pit truck passes required to move 500-bbl frac tanks to each pad location Expensive heating and management costs of frac tanks Inspection, repair and corrosion monitoring necessary Approximately 40,000 ft 2 required for frac tank water storage Big Pond Tank DEQ permitting not required in most areas Groundwater study not required Less expensive site preparation No reclamation necessary Easy, quick installation and teardown No more than 5 trucks to mobilize all components of one 35,000-bbl tank Unless temperatures stay below 20˚F, no heating required Simple manifold system; less prone to leak Careful liner installation and inspection should ensure a 99% leak-free tank ~30% less surface area required for this type of storage in lieu of frac tanks Conventional Frac Tank vs Big Pond Tank

Timely & Efficient Experienced crew of 6 people can install a 35,000-bbl tank, including liner, in less than 14 hours Site prep: a level, compacted sub-base is required under the tank footprint along with a 30-foot work perimeter Support equipment required for a normal install: tele- handlers (JLG), articulated man lifts, scissor lifts, skid steer Installation & Teardown

Specifications & Options Standard tanks are built to the following specifications: 24,000, 35,000, and 48,000 bbl. capacities available 15 to 19 modular panels—12’ tall weighing from 5,500 to 6,600 lb. before paint/insulation Engineered, overlapping connection plates 3”×3” connection lugs with pins 2” foam insulation on exterior of panels; other options available Unique, easy-to-use liner connection clamps Specially designed BPT MobAssist TM for ease of handling panels. Lifting devices designed to fit a 10,000-lb JLG lift or equivalent Four 4” fill pipes One 8” external manifold with butterfly valve and suction manifold Two entry/exit ladders Eight temporary panel support bars Blast/paint, customer color choice Options: External Manifold  Delete standard 8” manifold  Add 10” manifold  Add 12” manifold  Custom design according to customer spec Fill / Recirculation Lines  Delete standard 4” fill lines  Add 6” fill lines  Add 8” fill lines  custom design according to customer specs Ladder  OSHA-approved ingress/regress ladder Lifting Device  Additional lifting device(s) available

Lifting a segment into place with BPT MobAssist TM (Gen I).

Assembling the tank with liner ready for installation. Pad already in place.

Tank in background being fitted with final panel; tank in foreground being filled with fresh water from vacuum trailers visible just over top of wall.