Trican’s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010.

Slides:



Advertisements
Similar presentations
Well Design PE 413 Surface Equipments and Placement Techniques
Advertisements

Well Design PE 413 Introduction and API Standards of Casing
Chapter 3 COMPLETION.
CHAPTER 6 – WELL COMPLETION & STIMULATION
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
Under-balanced well bore cleanout and production evaluation technology.
Horizontal & Multi-Fractured Wells
Chapter 3 Casing design.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
2012 Williston Basin Petroleum Conference
Coalbed Methane Extraction in the Sydney Basin Gas and Coal Outburst Seminar November 20, 2002.
HydroPull™ June 2010 All rights reserved. 2 HydroPull ™ Water Hammer Valve Self-piloted flow cycling valve generates water hammer pulses that vibrate.
Terra Slicing Technology Overview.
SPE High-Pressure Jet Kerf Drilling Shows Significant Potential To Increase ROP 2005 SPE ATCE Dallas, Texas October 9-12, 2005 By John H. Cohen—Maurer.
The Game Plan NADOA North Dakota Seminar April 11, 2012.
Propellant Completions
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
Hydraulic Fracturing Best Management Practices Environmentally Friendly Drilling Program John Michael Fernandez Matthew Gunter.
A Noble Drilling Corporation Subsidiary TT April 19, 2001 Coiled-Tubing High Pressure Jet Drilling System Dr. William C. Maurer.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Selective Fracturing of a Series of Perforations in a Horizontal Well Using a Resettable Straddle System SPE Josh Thompson Weatherford International.
Inflatable DST Equipment An Overview Presentation.
Removing 36 hours from a workover Optimising rig time using LWIV & eRED technology Presented by: Andy Skinner Date: 9 th March 2011 Slide 1.
INFLATABLE DST EQUIPMENT
RIG PROCESSES  Drilling, Coring, Directional Drilling & Survey.  Tripping, Wash & Ream, Fishing.  E- Logging.  Casing & Cementing.  Perforating &Testing.
PETE 411 Well Drilling Lesson 29 Cementing.
Shale Drilling and Completions
Lesson 30 Cementing - cont’d
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Williston Basin Petroleum Conference Advances in Technology Panel Efficient Fracture Stimulation Rick Ross – Whiting Petroleum Corporation 1.
TT Artificial Lift Utilizing CT as a Hollow Sucker Rod Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC.
Completing & Producing A Well
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Who Can Plug an Abandoned Well. Overview Introduce the common methods used to construct wells. Discuss the different types of wells Discuss what types.
Casing Design.
Under-balanced well bore cleanout and production evaluation technology.
Calgary Petroleum Club – February 19, 2013 “Production Performance Unique Type Curve for Horizontal, Multi-Stage Frac'd Gas Wells: WHY, HOW and WHEN!”
April 12, 2012 Shale Gas Extraction.
© 2012 Chevron U.S.A. Inc. All rights reserved. Sustainable Development of Natural Gas from Shale Gregory Hild Chevron U.S. Marcellus Operations APEC Workshop.
Modern Slickline Perforating Applications in the North Sea
Dynamic Shock Modeling Darren Barlow Regional Technical Manager Perforating.
1 ● Well Completions (casing protocols) ● Acidizing ● Fracture treatments.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Hydraulic Fracturing (Fracking)
Oil and Gas Production 1 PRO 250 PowerPoint presentation created by Dr. Shauna Kocman used in CMC PRO250 with her permission under Creative Commons License.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 1321 Oil-Field Hydraulics Chapter 1 Completion and Workover.
Cost Effective Offset Well Frac-hit Protection Solution
2016 Williston Basin Petroleum Conference, Bismarck, N.D.
Oil-Field Hydraulics Chapter 2 Production Equipment
CASING.
Using an Inflatable Element
Cementing How it is Done
2017 capl conference what will be unconventional next
Recent Advances in Oil and Gas Production Engineering
Well Design - PE 413 Surface Equipments and Placement Techniques
Overview of Production Engineering K12PG42. Topic Covered  Well Completion and Its Types  Perforation Types ( including Gun Types)  Workover Job 
StimGun™ and StimTube™ Tool Successes in West Texas
Shell Exploration & Production
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
eelReel enables pipeline cleaning to distances > ft.
WELL COMPLETION AND STIMULATION BY BHARAT KUMAR HARANI ASSISTANT PROFESSOR DAWOOD UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI.
Coal Bed Methane Cementing Best Practices
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Presentation transcript:

Trican’s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010

Review of Existing Methods for Horizontal Fracturing Plug and Perforate (non continuous operation) Open hole packers with ball operated sliding sleeves Pre-perforated wellbore with CT conveyed fracturing BHA Mongoose system

Trican’s Approach Trican’s Burst Port System (BPS) was developed as an alternative method for multi stage stimulation of horizontal wells. The system was developed to give customers a simple, cost effective solution to existing technologies.

Reduce overall completion cost! Trican’s Approach Why develop another method? A strong market demand existed to: Eliminate expensive and time consuming drill outs of frac ports - Eliminate time spent sand jetting perforations Eliminate issues associated with pre-perforated wellbores Increase the amount of fracturing treatments possible in a wellbore Find alternatives to Mongoose license limitations Reduce overall completion cost!

BPS Development Concept was conceived when Trican was brainstorming approaches to place multiple fractures in a horizontal leg. Improvements in horizontal coil tubing fracturing techniques and tools made CT fracturing at these depths possible Concept was brought to the table again as a means to eliminate perforating when working in countries that have stringent explosive requirements Shallow horizontal completions in the Western Canadian Sedimentary Basin increased dramatically in the past two years These shallow completions demanded a simple, low cost alternative to existing multiple stimulation techniques

Typical BPS Collar Configuration Frac Ports / Collar: 10 - 15 Burst pressures: 26 – 80 MPa

BPS Installation Process BPS collars are installed by Trican’s Technical Specialists between casing joints as part of the completion string Production casing run to surface or hung off of a liner hanger Completion cemented in place (open hole packers are a more costly alternative) Rig moves off location

BPS Stimulation Process Scraper run with service rig or CT unit CT unit runs into the toe of the well with selective stimulation BHA BHA is placed across the first BPS collar to be treated Stimulation is pumped down 83mm (3.25”) coil tubing Flush coil tubing and pull to next zone & repeat steps 3-5

BPS Stimulation BHA Release Tool Bow Spring Centralizer Packer Cups Slot Sub Mechanical CCL

Benefits of BPS Installation: BPS collars slide into tight, deviated wellbores where completions with open hole packers cannot Fast installation process Cementing casing is inexpensive compared to openhole packers Liner hangers or monobore completions are possible

Benefits of BPS cont’d Stimulation: - Sand off? No problem! Clean up coil by reverse circulating No open perforations above BHA, so clean up is easy Pull to the next BPS collar and continue treating Can install “back up” collars if sand offs are anticipated Customers can be aggressive with sand ramps and experiment with fracturing treatments because sand offs are easy to clean up Can install as many frac ports as you want Fast treatments, 200 tons, 20 zones, less than 24 hours on location

Benefits of BPS cont’d Other Factors: - Down hole memory gauges provide important treatment data Wellbore is left full drift, making future workovers and cleanouts easier Extra collars can be installed for future stimulation Collars can be skipped of they are deemed to be out of zone Ports can be easily abandoned individually if a frac breaks out of zone

First Installation July 1, 2009 Southern Saskatchewan Open Hole with swellable packers Viking formation 114.4mm, 17.26kg/m casing TVD: 688m TMD: 1306m 10 BPS collars installed Stimulation: 1600m of 73mm CT 9 BPS collars treated (Packer leak) Sand placed 9 tonne (50/140) 13 tonne (12/20) 110 tonne (16/30) However, open hole completion with packers was easily attainable, but there were still critics that believed the product would not work if cemented in place. For the system to move forward successfully, the product needed to work while cemented in place.

First Cemented Install Sept 17, 2009 Installation: Fort Saskatchewan, Alberta Viking formation 114.4mm, 17.26kg/m casing TVD: 860m TMD: 1527m 14 BPS collars installed Stimulation: -1916m of 82.6mm CT 14 BPS collars treated Sand placed 6.5 tonne (20/40) 123 tonne (12/20)

Typical Cemented BPS Frac

BPS Statistics Since July 1, 2009 - Installed and stimulated over 80 wells - Installed over 1300 BPS collars - Cemented & Open Hole Systems with Swellable Packers - Formations: Viking, Cardium, Bakken, Colorado, Glauconite, Fish Scales, Montney

Notable BPS Installs - Most zones in a single wellbore 31 frac ports installed & all were frac’d 160 tonne sand 30-60m (100-200 feet) interval spacing - Deepest Install TVD: 2,200m (7220 feet) TMD: 4,450m (14600 feet)

Summary Another method for horizontal well stimulation has been developed BPS is cost effective method for multiple stimulations in a single wellbore The job data collected over the last year proves that BPS is a sustainable multizonal completion technique

What do you think?