APM/PERMAFORM Pipe Lining by the Centrifugally Cast Concrete Pipe Lining Process (Centri-Pipe)

Slides:



Advertisements
Similar presentations
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Advertisements

NeoPoxy 50-Year Design Life Structures Using Traditional Materials
Bruce Wagener, PE Eric Leagjeld, PE
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Environmental Infrastructure Section 219 and 592 Authorities
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Duane Hill, District Engineer
Where does all that rain go? Stormwater Management in London.
1 PRESENTATION FLOWABLE FILL Presented By: Mac McArthur, P.E. Construction Engineering Services Bureau Mike Lynch Materials Bureau Highways and Engineering.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Getting Caltrans to Approve Your Plans Basic Drainage Policies and Requirements Roy H. King, MS,PE California Department of Transportation Division of.
New Orleans’ Levee Failures Chalston Layacan Elizabeth Lenker Jamie Mellies.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
NeoPoxy 50-Year Design Life Structures Using Traditional Materials An engineering design guide for economical long-life rehabilitation construction and.
Alison Meehan, CFM Virginia Dep’t of Conservation and Recreation.
SUMMARY OF GALLATIN RIVER OUTSTANDING RESOURCE WATER (ORW) DESIGNATION Presented to: Water Pollution Control Advisory Council August 31, 2006 Presented.
Gwinnett County’s Post Development Stormwater Management Program
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Steve Lefler - Principal Engineer Duke Energy
2015 MASS Re-Issue Changes-Division 50. MASS’s many hats Capital Projects Private Development Private Systems Outside communities Agency Use - ADEC PM&E.
Coatings & Lining for Underground Infrastructure.
Florida Gas Transmission Section #2 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Tampa By-Pass Canal to East of Lake Magdalene Hillsborough.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer.
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Controlling Constructive and Destructive Forces
Georgia’s Weather & Climate  SS8G1: The student will describe Georgia with regard to physical features and location a.) Evaluate the impact of climate.
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Hurricanes. Katrina approaching New Orleans August 2005.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
DISASTER IN DAYTON. Words concerned Reservoir (n.): man-made lake where water is stored Loaf (n.): bread baked as on piece Dam (n.): wall built to keep.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Boulder Rock Drive Crossing Rehabilitation Project - Structure F-2  Major Roadway Crossing Culvert Replacement November 17, 2015.
WaterSilos The Ultimate Storage Solution
C.I.Agent Solutions ® is THE LEADER in Secondary Containment for the Utility Industry.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Sanitary Engineering Lecture 13
WATERSHEDS AND POLLUTION. What is a Watershed? A watershed is simply: an area of land where runoff collects and then is a water supply to a large lake.
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Middlebelt Transport and Storage Tunnel (MTST) Project
Town of Brighton, Department of Public Works
Corrugated Metal Pipe (CMP)
Manchester’s CSO Program: A Look Behind and a Look Ahead
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
107th & 110th Avenue North Public Utilities Renewal Projects
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
RESIDENTIAL PLUMBING SYSTEMS (WATER SUPPLY)
WATER MAIN REHABILITATION
Electrical Gas Plumbing Heating & Cooling
Where does all that rain go?
4th Annual Construction Law Summit
Parkland/Brookdale Interceptor Replacement
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Print Reading.
City of Spruce Grove Capital Region Partners Presentation 2019
Presentation transcript:

APM/PERMAFORM Pipe Lining by the Centrifugally Cast Concrete Pipe Lining Process (Centri-Pipe)

How Many Times Have You Seen This

Where is the Bottom of the Pipe?

HISTORY Action Products Marketing Corporation (AP/M) began rehabilitating manholes in 1985 with its patented PERMAFORM system for the replacement of manholes without digging and without interrupting flows. AP/M recognizes that not all manholes needed complete replacement. So, we developed a cast in place sealing and reinforcing system using the high strength, centrifugally cast PERMACAST specialty mortars. This same system was adapted for use in storm and sanitary sewer pipe from 30 inches to 120 inches in diameter.

Small Equipment Footprint

Traffic Control Done Right!

Report Graphics Sample

 This report has proven that a 1 inch liner utilizing the Permaform PL-8000 will perform satisfactorily to support soil and hydrostatic pressure based on the depth, type and diameter of the pipe, soil type and level of the ground water as given above. Report Summary

Third Party Testing  LA Redner Test  Adhesion (ASTM D-4541)  Greenbook 112 day test

 AP/M personnel were invaluable in the creation of a new ASTM Standard Practice.  ASTMs’ F 36 Committee, Technology and Underground Utilities, recently developed and released, Standard Practice for Installing a Protective Cementitious Liner System in Sanitary Sewer Manholes, F  This practice includes the use of the centrifugally cast concrete lining system. AP/M Success with Manhole Rehab Leads to New ASTM Standard Practice

 ASTMs’ F 36 Committee, Technology and Underground Utilities, recently developed, Standard Practice for Applying a Centrifugally Cast Concrete Pipe Liner inside Storm Pipes, WK New ASTM Standard Practice

MNDOT  MNDOT- featured in Stormwater magazine  “Our district is faced with thousands of deteriorated centerline roadway pipes,” says Ruth Betcher, P.E., hydraulics engineer for the Minnesota Department of Transportation’s (MNDOT) District 6, “and replacing all that pipe is cost prohibitive—and also, citizens don’t welcome detours!”

How Many Times Have You Seen This

Where is the Bottom of the Pipe?

Flowable Fill

First Lining Pass

Finished Product

MNDOT BeforeAfter

Sanitary Sewer Rehabilitation

West Lake, Ohio  Article- UCT magazine  The City of Westlake, Ohio, got an interesting ‘wake up call’ in 2006, when a sanitary sewer interceptor line in nearby City of Lorain failed dramatically. “It forced the evacuation of several dozen homes for months,” says Westlake Director of Engineering Robert P. Kelly, PE, “and we realized we'd better take a closer look at our system.”

West Lake, Ohio BeforeAfter

Clay County Florida- SR16  Article Published in Stormwater magazine  When Tropical Storm Faye blew across Florida in 2008, stormwater rushed through one of the corrugated steel culvert pipes under State Road 16 in Clay County and began to suck the surrounding soil into the pipe.  "It created a void along the side of the road about 10 feet deep and 20 feet across. You could have put a couple of minivans in this hole," says Spencer Townsend, project manager for the Clay and Nassau counties local sites for Transfield Services North America.

Clay County, Florida BeforeAfter

Atlantic Beach  Article- Stormwater Solutions July/August 2011  Atlantic Beach is a coastal community of 13,000 people in Duval County, Florida. As the name implies, it has a beach and the nearby ocean affects every aspect of life, including the infrastructure. Atlantic Beach’s biggest subdivision, built in the early 1960s, didn’t really take that into account.

Atlantic Beach, FL BeforeAfter

Sabine River Authority  Article- Stormwater magazine July/August 2011  The Sabine River Authority (SRA) was created in 1949 to equitably distribute the waters of the Sabine River and its tributaries. As part of this distribution, “We provide surface water to eleven industrial customers, such as Conoco and Louisiana Pigment, for cooling and processing,” says SRA Facility Manager Mike Carr.

Sabine River Authority BeforeAfter

WARNER ROBBINS, GEORGIA April 2011 CENTRIPIPE CULVERT LINING UTILITY ASSET MANAGEMENT REYNOLDS, GA

Concrete Pipe Rehabilitation

Cast in Place Structural Product

Centrifugally Cast Concrete Pipe Cleaned/Cast Wall RehabSpecialized Equipment

AP/M PERMAFORM  AP/M Permaform   Questions?