Marianna Vaiman, V&R Energy

Slides:



Advertisements
Similar presentations
WISP RFI for Applications response summary
Advertisements

Use of Node-Breaker Model in POM Suite/ROSE Software
Using Synchrophasors for Preventing Cascading Outages
January TSS J. Gronquist, S. Kincic
ISO New England Smart Grid Investment Grant Update David Bertagnolli – NASPI Working Group Meeting October 12-13,
Cut Costs and Increase Productivity in your IT Organization with Effective Computer and Network Monitoring. Copyright © T3 Software Builders, Inc 2004.
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
and Trend for Smart Grid
Synchrophasors: Improving Reliability & Situational Awareness
PacifiCorp-CAISO EIM Initiative Overview
1 1 Office of Science Lawrence Berkeley National Laboratory Distribution µ PMU Applications Joe Eto Emma Stewart
Team Dec13_11: Cole Hoven Jared Pixley Derek Reiser Rick Sutton Adviser/Client: Prof. Manimaran Govindarasu Graduate Assistant: Aditya Ashok PowerCyber.
Introduction to Phasor Measurements Units (PMUs)
North American Synchrophasor Project Initiative NASPI Work Group Meeting Oct , 2011 Joseph H. Schaefer Florida Power & Light.
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
Smart Grid Projects Andrew Bui.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Academic Advisor: Prof. Ronen Brafman Team Members: Ran Isenberg Mirit Markovich Noa Aharon Alon Furman.
Chapter 9: Moving to Design
Phase Angle Alarming in ROSE for Steady-State Stability Analysis Marianna Vaiman V&R Energy JSIS Meeting Salt Lake City, UT March 5, Copyright ©
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
Advanced Phasor Measurement Units for the Real-Time Monitoring
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
Synchrophasor: Implementation,Testing & Operational Experience
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Power Application Software UPDEA - Workshop. What are Power Application Tools? Name as many of the Power Application Tools as you can Power Application.
SMS Update NERC Synchronized Measurement Subcommittee (SMS) Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22,
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Visualizing Peer-to-Peer Networks Final Presentation By Team SPEW.
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
BOĞAZİÇİ UNIVERSITY DEPARTMENT OF MANAGEMENT INFORMATION SYSTEMS MATLAB AS A DATA MINING ENVIRONMENT.
ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
Imagination at work. Paddy McNabb Senior Engineer January 2016 Grid Stability Applications Wide Area Monitoring System.
Retele de senzori EEMon Electrical Energy Monitoring System.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Accounting systems design & evaluation 9434SB 18 March 2002.
1 Dr.Wang Yingtao Engineer Power System Department CEPRI,China Nov 2006 R&D OF REAL TIME DYNAMIC MONITORING SYSTEM IN CHIHA.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
MISO – Synchrophasor GPA Users Forum Sept 7th, 2011.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
Maximizing Use of Synchrophasor Technology for Everyday Tasks
Intelligent Systems Development
What’s new at GPA?.
SCE Utility Update JSIS Meeting March, 2015.
CCET Discovery Across Texas Data Quality Plan - Overview
Data Mining, Distributed Computing and Event Detection at BPA
Peak online TSAT Implementation Update
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
A Distributed Two-Level PMU-Only Linear State Estimator
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
NASPI PMU Data Application Classification
Ruisheng Diao, Renke Huang, Pavel Etingov, Henry Huang PNNL
PacifiCorp-CAISO-NVE EIM Initiative Overview
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
Ruisheng Diao, Renke Huang, Pavel Etingov, Henry Huang PNNL
NASPI PMU Data Application Classification
Hongming Zhang EMS Applications Manager, PEAK RC
Data Mining, Distributed Computing and Event Detection at BPA
Presentation transcript:

Marianna Vaiman, V&R Energy V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy marvaiman@vrenergy.com JSIS Meeting March 3, 2015 Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Project Team Project Participants - BPA, CAISO, IPC, Peak, SCE, SDGE Real-time monitoring and control based on the Region Of Stability Existence (ROSE) platform: ROSE defines the range of phasor measurements or other system parameters for which the system may securely operate in terms of the accepted N-k security criteria Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

GOMCA Project Objectives Demonstration of V&R Energy’s Liner State Estimator (LSE) on realistic WECC network, including: Observability analysis; Bad synchrophasor data detection and conditioning; Validation of cases created by LSE and their applicability to voltage stability analysis; Based on the methods and algorithms that V&R demonstrated during NASPI Voltage Stability Workshop. Measurement-based analysis: Measurement-based voltage stability analysis; Automatic determination of corrective remedial actions; Situational awareness wall to visualize in an easy effective way synchrophasor data, and results of voltage stability analysis; ROSE integration with EMS/PDC systems of the project participants; Technology transfer to project participants, training workshop. Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Scope of Work 1. Prototype LSE study and Peak-ROSE at Idaho Power: Prototype LSE study includes: Observability study; Methodology for identifying additional PMU locations; Bad data analysis and detection using LSE; LSE cases for IPC. Idaho Power will use WSM cases from Peak for Peak-ROSE. 2. Peak-ROSE (“hybrid” ROSE) enhancements 3. LSE and ROSE integration at SCE and SDGE: Interfacing ROSE with GE’s XA21; Enhancing methodology for identifying additional PMU locations, if needed. 4. LSE at CAISO and Peak 5. Measurement-based voltage stability analysis, remedial actions, and visualization, based on the cases created by LSE 6. Technology transfer Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Project Participant Expectations SCE – ROSE integration with GE’s XA21 and PDC to run both “hybrid” and PMU-based ROSE. SDG&E – ROSE integration with GE’s XA21 and PDC to run both “hybrid” and PMU-based ROSE. IPC – ROSE integration with EMS and PDC (will receive cases from Peak) to run “hybrid” and PMU-based ROSE. BPA – project observer/advisor. CAISO – supporting Peak in ROSE implementation and use of Linear State Estimator; integration of PMU-based ROSE. Peak – ROSE enhancements, and synchrophasor-based analysis. Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Linear State Estimator Working with each participant: To perform observability study MODEL WILL BE NEEDED Involves reading the SE data, topology processing if node-breaker model Validation of the results of LSE for participant’s network/PMU installation; Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Linear State Estimator (cont.) Incorporating algorithms for bad data detection and conditioning into LSE; Test the quality of the algorithms/data; Analyze the applicability of the cases created by LSE for voltage stability analysis; Do changes to LSE process, if needed, to create cases suitable for voltage stability analysis. Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

“Hybrid” Peak-ROSE Enhancements Peak prepared a list of enhancements To be discussed with V&R Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

“Hybrid” ROSE Integration The same computational functionalities as in Peak-ROSE Integration/customization is needed because State Estimator data and additional files needed for VSA analysis (contingencies, sources/sinks, monitored elements) come in different formats at different entities: Working with participants to develop integration with their EMS; Understanding the data; Integrating ROSE. Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Measurement-Based Analysis and Visualization Voltage stability analysis Automated corrective actions: Automatically determine corrective actions Work with participants: To implement remedial actions for their system; Validate the results of automated computations. Building situational awareness wall: Displaying the results of the analyses via easy-to-understand GUI; Customization for each participant. Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

ROSE Implementations Model - based ROSE: “Hybrid”- based ROSE: State Estimator data is required at the rate available at the entity using the application, usually 3 to 5 minutes. “Hybrid”- based ROSE: Phasor and State Estimator data sets are required: Phasor data at the rate available at the entity using the application, usually 30 samples/second. State Estimator data at the rate available at the entity using the application, usually 3 to 5 minutes. Implemented at Peak Measurement - based ROSE: Phasor data is required the rate available at the entity using the application, usually 30 samples/second. Will be demonstrated using the DOE project Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

ROSE Software State Estimator is a part of the ROSE software. Can use V&R’s SE or export from an EMS vendor Model-based and measurement-based & hybrid State Estimator Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

“Hybrid”- ROSE Architecture Two analysis modes: Real-Time and Off-Line Inputs are: State Estimator (SE) data, synchrophasor data, and additional files to perform voltage stability analysis (VSA) Real-Time Mode Answer the following: Provide a brief project description. What are the project objectives? What is the major planned deliverable? Describe any issues/problems/challenges. ------------------------------------------------------------------------------------------------ The questions below are food for thought. You are not limited to answering just these questions, nor do you have to answer them all. Respond with information, as appropriate for your project. Are the stakeholders in agreements that the project is moving toward the intended objectives/accomplishments as planned? What technical approach is being used to do the research? How would you define success for this project? What technology gap in the Roadmap will this project close? Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

“Hybrid” ROSE Implementation at Peak Synchronization with EMS and automatic reading of SE files (WSM Export) every 5 minutes; Using synchrophasor data in C37.118; Server-client application; Running as a service 24/7. EMS Node-breaker model ROSE Alarming/Archiving/ Visualization via Web Client PDC AC contingency analysis with real-time RAS; Computes interface limits; Performs PV-curve/QV-curve analysis. Customized output; alarming; archiving; Output is in the format that is easily integrated with other applications. Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Measurement – Based ROSE Architecture One main input is synchrophasor data Additionally, we will need a power flow case to obtain model parameters, locations of PMUs, and additional files to perform voltage stability analysis (VSA) Answer the following: Provide a brief project description. What are the project objectives? What is the major planned deliverable? Describe any issues/problems/challenges. ------------------------------------------------------------------------------------------------ The questions below are food for thought. You are not limited to answering just these questions, nor do you have to answer them all. Respond with information, as appropriate for your project. Are the stakeholders in agreements that the project is moving toward the intended objectives/accomplishments as planned? What technical approach is being used to do the research? How would you define success for this project? What technology gap in the Roadmap will this project close? Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Measurement – Based ROSE Based on cases created by Linear State Estimator Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.

Uses of LSE The algorithms for new LSE were developed by V&R Energy: Demonstration/validation for a realistic power system network will be performed during the current DOE project. LSE is based on PMU measurements of voltage and current: Orthogonal component of voltage and current vectors is considered as the state variable Advantages of LSE: Speed of state estimation due to using a direct non-iterative solution; Improving quality of PMU data. May replace conventional State Estimator (SE) when SE looses its output. Copyright © 1997-2015 V&R Energy Systems Research, Inc. All rights reserved.