A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.

Slides:



Advertisements
Similar presentations
Soil Erosion.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
1 Effluent Guidelines for Construction Greg Davis USEPA
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
OSHA Office of Training and Education1 Excavations – Subpart P.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Interest Approach Where have you seen erosion?
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
Hydrologic Studies Unit Land and Water Management.
S. Fork Nooksack River, WA. Reasons for Land Clearing Agriculture Lumber Mining Urban Development.
Erosion is the process by which the land surface is worn away by the action of wind, water, ice, or gravity - it is the process where soil particles are.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Proposed Novato Creek Bank Stabilization Guidelines Questa Engineering Corp.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
PREPARING THE LANDSCAPE SITE Ms. Gripshover Landscaping Unit 14.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Basic Principles of Agricultural/Horticultural Science
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
© 2015 EarthCon Consultants, Inc. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior.
13 Surface Water 13.1 Streams and Rivers
Soil conservation practices Contents Soil conservation practices Soil conservation practices Crop rotation Crop rotation Wind break Wind break Cover.
Surface Water Supplies Joe Zulovich Extension Agricultural Engineer Commercial Agriculture Program.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Northern Connecticut River Fluvial Geomorphology Assessment – Appendix 5.
How does soil erosion and quality effect your life?
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
1 Structural Control Practices ©2002 Dr. Bradley C Paul.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
OSHA Office of Training and Education
Excavation & Trench Safety
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
Human Impacts Part 2- Watersheds. What’s a Watershed? An area of land that drains into a common body of water.
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Bridges Reach analysis Fundamental tool for design
EFFECTIVE EROSION AND SEDIMENTATION CONTROLS FOR IN-CHANNEL PROJECTS
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Erosion • outline a cause of soil erosion in  NSW due to: – an agricultural process – urbanisation and identify a management strategy that prevents or.
The Gila River Restoration at Apache Grove
Soil Conservation.
Section 1: Surface Water Movement
EPA Public Meeting Dallas, Texas May 10, 2005
Module # 17 Overview of Geomorphic Channel Design Practice
Kastanis- Existing Conditions
Module # 16 Restoring Functions to Streams Through Design
In-Stream Structures & Grade Control
Presentation transcript:

A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable reaches proximate to the area to be treated. The extent of structural treatments beyond toe protection will be evaluated on a case by case basis. Generally, vegetative or bioengineering treatments (Soil Bioengineering) shall be used to stabilize low risk areas (agricultural, wooded, or other natural settings where there is little threat to adjacent structures or improvements. In high risk areas where there is significant threat of damage to physical improvements (homes, buildings, utilities, roadways, etc.) or to important cultural or environmental features, structural protection will be more appropriate. B. A site assessment shall be performed to determine if the causes of instability are local (e.g. poor soils, high water table in banks, alignment, obstructions deflecting flows into bank, etc.) or systemic in nature (e.g. aggradation due to increased sediment from the watershed, increased runoff due to urban development in the watershed, degradation due to channel modifications, etc.). The assessment need only be of the extent and detail necessary to provide a basis for design of the treatments and reasonable confidence that the treatments will perform adequately for the design life of the measure. C. In low risk areas treatments shall be evaluated under bankfull or ten-year return period (10 percent probability) flow conditions, whichever is less. High risk areas may require evaluations under less frequent flow events (up to a 100 year return period) depending on the value of the protected area. More frequent storm events should also be evaluated where these result in higher flow velocities. D. Changes in channel alignment shall not be made without an assessment of both upstream and downstream fluvial geomorphology that evaluates the affects of the proposed alignment. The current and future discharge-sediment regime shall be based on an assessment of the watershed above the proposed channel alignment. E. Bank protection treatment shall not be installed in channel systems undergoing rapid and extensive changes in bottom grade and/or alignment unless the treatments are designed to control or accommodate the changes. Bank treatment shall be constructed to a depth at or below the anticipated lowest depth of streambed scour. F. Toe erosion shall be stabilized by treatments that redirect the stream flow away from the toe or by structural treatments that armor the toe. Additional design guidance is found in the National Engineering Handbook Part 654, Stream Restoration Design. Where toe protection alone is inadequate to stabilize the bank, the upper bank shall be shaped to a stable slope and vegetated, or shall be stabilized with structural or soil-bioengineering treatments. Measures to redirect flow shall not reduce the flood carrying capacity of the stream nor cause adverse erosion or sedimentation elsewhere in the stream system. All treatments shall be stable under design flow conditions. G. Where flooding is a concern, the effects of protective treatments shall not increase flow levels above those that existed prior to installation. When vegetative treatments are planned, flow levels shall be evaluated under mature growth conditions. H. Installation Requirements 1. All trees, brush, stumps, and other objectionable materials that would interfere with the construction or proper functioning of the channel shall be removed. 2. Where possible, trees will be left standing, brush and stumps will not be removed and channels will be excavated from one side, leaving vegetation on the opposite side. 3. Construction plans will specifically detail the location and handling of spoils. 4. Seeding, fertilizing and mulching shall conform to the Standard for Permanent Vegetative Cover for Soil Stabilization. 5. Vegetation shall be established on all disturbed areas immediately after construction, weather permitting. If weather conditions are such as to cause a delay in the establishment of vegetation the area shall be mulched in accordance with the Standard for Stabilization with Mulch Only.

A. Designs for stream restoration try to mimic natural conditions present in stable reaches proximate to the area to be treated. The extent of structural treatments beyond toe protection will be evaluated on a case by case basis. Generally, vegetative or bioengineering treatments (Soil Bioengineering) shall be used to stabilize low risk areas (agricultural, wooded, or other natural settings where there is little threat to adjacent structures or improvements. In high risk areas where there is significant threat of damage to physical improvements (homes, buildings, utilities, roadways, etc.) or to important cultural or environmental features, structural protection will be more appropriate. B. In low risk areas treatments shall be evaluated under bankfull or ten-year return period (10 percent probability) flow conditions, whichever is less. High risk areas may require evaluations under less frequent flow events (up to a 100 year return period) depending on the value of the protected area. More frequent storm events should also be evaluated where these result in higher flow velocities.

A note and detail have been added that addresses hay bales around dewatering bags.

Not 100% correct……….but pretty close.

Agricultural Handbook No. 667, Stability Design of Grass- Lined Open Channels, may also be used to design grass lined diversions based on “Tractive Stress” method. What is the difference between a Diversion and a Swale ?

Two additional Flexible Channel Liner Classifications have been added, Type “I” and Type “J”.

No Changes to this Standard have been made.

 “Super” silt fence - A metal fence with 6 inch or smaller mesh openings and at least 2 feet high may be utilized, fastened to the fence posts, to provide reinforcement and support to the geotextile fabric. Posts may be spaced less than 8 feet on center and may be constructed of heavier wood or metal as needed to withstand heavier sediment loading. This practice is appropriate where space for other practices is limited and heavy sediment loading is expected. “Super” silt fence is not to be used in place of properly designed diversions (pg. 15-1) which may be needed to control surface runoff rates and velocities.

Questions on any topic discussed ?