RESEARCH PROGRAMS Culvert Liners High Value Research Sue Sillick Montana Department of Transportation July 2011.

Slides:



Advertisements
Similar presentations
Municipal Solid Waste Defined in 40 CFR Part 258.2
Advertisements

 How does improving the performance of projects, people and programs support research to results? ◦ Ensures the right people are involved, start to finish.
The Best Solution for CIPP American Made, American Support Introducing America’s First UV Cured Fiberglass CIPP.
Secondary Containment: From A Contractors Point of View.
Pipes Single Wall Pipes Double Wall Pipes
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
North Central State Consortium – October 8, 2014
Bruce Wagener, PE Eric Leagjeld, PE
Above Ground Storage Tanks &
Supplemental Specification 802: Constructing and Inspecting Pipe Culverts, Sewers, Drains and Drainage Structures Ted Strickland, Governor Jolene Molitoris,
Requirements on a CIPP-System. Requirement on a CIPP-System.
Integrated Analysis of Transportation Network with Pipeline System Vulnerabilities Berrin Tansel 1, Xia Jin 1, Kollol Shams 1, Bahareh Inanloo 1, Albert.
2013 Lexus LX570 Armoring process. ETA: 2 weeks This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
Get Ready: Changes Impacting the Water Heater Marketplace George M. Chapman Senior Program Manager Consortium for Energy Efficiency © 2015 Consortium for.
Plastics in Packaging Scott H. Boyle Brian D’Amico Janine Horn
Transportation System Issues and Challenges
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
Compressed Air Piping Systems by Asahi/America
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
Alan Spell| Missouri Economic Research and Information Center| Missouri Department of Economic Development Measuring Your Region’s Transportation Strengths.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
EnE 301: ENVIRONMENTAL ENGINEERING
Stick This in Your Pipe. Information Found at the Following Website
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Cost Effective Drainage Structures Henry J. “Hank” Gottschalk, III Technical Resources Engineer Virginia Concrete Conference March 2010.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
Poly Flo Piping System “The Double Wall Advantage” PolyFlo Double Containment Double Wall Integrity with Single Minded Purpose!
A Better Foundation Alternative DESIGNING METAL FOUNDATIONS Shaner Industries |
RESEARCH PROGRAMS Best Practices Related to Research Problem Identification, Scoping, and Programming: A State DOT Research Manager’s View Sue Sillick.
Boilers Present By: Jason Gillier 4M-H. OBJECTIVE: To provide the audience with a brief, but concise overview of what boilers are and there components.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Culvert Maintenance CULVERT MAINTENANCE.
High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds Presented by: Neil Nowak, PE Phone:
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Basic Structural Considerations Bridge Inspection Course.
Department of Transportation U.S. DOT National Highway Traffic Safety Administration Research & Development/Studies SGS-1-2.
Arlington Park Arlington Park is an improperly maintained and operated sewage treatment lagoon. There are approximately 30+ families using this lagoon.
Pressure Sensor Findings and Thoughts on Future Work Miguel Piedrahita BDML 5/13/04.
P ART A - S TANDARDS A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.
200 kT Water Cherenkov Detector Vessel Liner 50% Conceptual Design Review.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
The copyright to this material belongs to the Korea Occupational Safety and Health Agency. Unauthorized use and distribution are prohibited. If an individual.
Safer Work Zones Through ITS Interim Traffic Management System Florida Department of Transportation Tahira Faquir.
TRENCHLESS TECHNOLOGY GUIDED BY PRESENTED BY Ms. PRAJEESHA.M.P DEEPAK.C Lecturer. Semester 7,Civil Department of Civil Engineering. Roll No:58.
Air Conditioning New Jersey and Pennsylvania
ME444 ENGINEERING PIPING SYSTEM DESIGN
REHABILITATION OF WATER NETWORK
27-28 April 2015 Eng. Mubarak Yusuf Al-Kawari Presented by:
Project “Improving the systems for navigation
Design and Construction of Composite Lined Landfills
DeSavino & Son’s – “Innovations in Polymer Commercial Cabinetry”.
Exhaust Heat Recovery Systems
Culvert Maintenance Similar to bridges Structurally different
Extending the life of essential sub surface assets
Installation Global System
관상동맥(Coronary artery )
WATER MAIN REHABILITATION
Real Solutions Product Introduction
RCC UNIT-12 Prestressed Concrete
Water Main Rehabilitation Cured-In-Place-Pipe Technology
Hanwei GRE Pipe Comparison to Steel Pipe
Environmental Geotechnics
Well Repair Installation of Well Liners
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Heat Exchangers Heat Exchangers.
Small Structure Rehabilitation Design
2019 Capital Program Title of Presentation
Presentation transcript:

RESEARCH PROGRAMS Culvert Liners High Value Research Sue Sillick Montana Department of Transportation July 2011

RESEARCH PROGRAMS Purpose of Project Install two types of culvert liners to restore function and structural integrity to corrugated steel pipe (CSP) Cure-in-Place (CIPP) High Density Polyethylene (HDPE)

RESEARCH PROGRAMS Purpose of Project Why culvert liners vs. replacing the culverts? Improve worker and public safety during construction Minimize construction impact on the public and the environment Eliminate construction traffic delays and congestion Eliminate construction landfill waste Increase culvert performance and life Decrease maintenance costs

RESEARCH PROGRAMS Culvert Outlet Culvert Condition Prior to Construction Culvert Inlet

RESEARCH PROGRAMS Resin impregnated, three-layer polyester Cure-in-Place Pipe (CIPP) liner being inserted into existing culvert using compressed air Cure-in-Place Culvert Liner Installation

RESEARCH PROGRAMS CIPP liner under cure using low-pressure steam Cure-in-Place Culvert Liner Installation

RESEARCH PROGRAMS Completed CIPP liner inlet Cure-in-Place Culvert Liner Installation Completed CIPP liner outlet

RESEARCH PROGRAMS Example of work zone during the CIPP installation Cure-in-Place Culvert Liner Installation

RESEARCH PROGRAMS Seam welding the HDPE pipe for insertion into the existing culvert HDPE Culvert Liner Installation

RESEARCH PROGRAMS Inserting the finished HDPE pipe into the culvert HDPE Culvert Liner Installation

RESEARCH PROGRAMS HDPE pipe fully inserted and ready for grouting phase HDPE Culvert Liner Installation

RESEARCH PROGRAMS Completed HDPE liner outlet with grouted bulkhead HDPE Culvert Liner Installation

RESEARCH PROGRAMS Example of work zone in HDPE pipe installation HDPE Culvert Liner Installation

RESEARCH PROGRAMS Condition at Three Years HDPE CIPP

RESEARCH PROGRAMS Culvert Liner Evaluation Semi-Annual evaluations are being conducted for an initial 5-year period, including: Internal culvert deflection Lining integrity Leakage Flow Discoloration Other visual distress

RESEARCH PROGRAMS Questions? Contact Sue Sillick Project website: ss_culvert.shtml