Alternative Energy Wind and Bicycle Power Choluteca, Honduras Group Members: Robbie Schram, Justin Letts, Ben Weekes May 23, 2013.

Slides:



Advertisements
Similar presentations
Robo-Lab Team 5 Derek Evers, James Bettes, Keith Pearson, Amanda Brown, and Bryce Bell.
Advertisements

Special Events Car Project By Russell W. Green Poway, CA January 15, 2011.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Pipe Cutting System The evolution of Patented products Designed in Finland pipe cutting.
Sophomore Design Class Automated Highway Simulation Group 2: Jeremy Sletten Patrick Murphy Michael Olson Randa Ibrahim.
Choluteca, Honduras March  Kristen Frooman  Son Ngo  Miriam Simon  Amanda Peterson **Every member helped with planning, implementation, and.
Copyright Carnegie Mellon Robotics Academy all rights reserved Electromechanical Relays.
FIRE FIGHTING ROBOT ELECTRO-MECHANICAL SYSTEMS TERM PROJECT 1
4/19/2012 1The Ohio State University - Engineering 692 Choluteca, Honduras Group Members: Brandon King, Nirupa Manohar, Elizabeth Schweizer, Stephanie.
What size is your carbon footprint? Making more electricity from your model wind turbine Is that possible? Would you like to produce more electricity from.
Overview The top seal mechanism consists of a foil unwinding and feeding mechanism and a cutting and welding mechanism. It is designed to cut out and weld.
How to Construct a Robot Part 7: Wiring and Controller Installation Copyright © Texas Education Agency, All rights reserved. 1.
CLIENT: SPECIALIZED TRAINING FOR ADULT REHABILITATION, INC. (S.T.A.R.T.) CONTACT: KATHY BAUMAN, EXECUTIVE DIRECTOR TEAM MEMBERS: BEN BLAIR LINDEN EASON.
February 25, 2010 ARMS 1098-C 1 ODOS.  Team Leader Ed Brown – Junior, EET  Team Members Nathan Myers – Sophomore, EET Ben Ross – Junior, CE Lisa Li.
The goals of Micromouse: to build an autonomous “mouse” Mouse should be able to navigate and solve any given maze Mouse should be no bigger than 25.
OFF THE GRID Property Irrigation System Alex Chepeska Alex Chepeska.
Team P12472 Phil Glasser – Lead Engineer, Electrical Engineer William Tierney – Mechanical Engineer Bryan Abbott – Mechanical Engineer Mike Scionti– Mechanical.
Abstract In 2008 President Geoffrey introduced the Live green program which called for environmentally conscious living. In light of this initiative, it.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Embedded Programming and Robotics Lesson 6 Mechanical Assembly 1.
Charging System Fundamentals
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
IEEE’s Hands on Practical Electronics (HOPE) Lesson 1: Introduction.
Next Slide Introduction to the Drill Press Created by Mr. Heck.
Solar PV Design Implementation O& M March 31- April 11, 2008 Marshall Islands 2. Solar Home Systems (SHS) 2. Solar Home Systems (SHS) Herb Wade PPA Consultant.
Wind Energy Shaw STEM Lab
The goal of this project is to provide inexpensive electricity to citizens of third world countries who have limited access to electricity. The scope of.
Vex 1.0 © 2005 Carnegie Mellon Robotics Academy Inc. Electromechanical Relays.
Wind Energy Station Directions. Simple Wind Generator 1.Connect the LED to the motor in the pvc stand (using the red and black wires). 2.Place the motor.
Hair Straightener Redesign
Introduction The 2012 senior engineering students were given the task of creating a wall to assist Coppell High School’s special education students. The.
Micro Controlled Cabin Lights Ron Acker EKU Dept. of Technology, CEN/CET.
Styro EF 152 Windmill Project Jake Philpott Kaara Anderson Kevin
The USB Charging Station (TUCS) Basheer and Connor’s Make Project.
2006 NAHBA CONFERENCE NEW SIGN TECHNONOGY 2006 NAHBA CONFERENCE NEW SIGN TECHNONOGY.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
General Instructions for “KidWind Light” wind tunnel.
MSD II Week 5 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Functional Requirements Generate an AC current Supply an output of 500 to 1000 Watts Supply power to the Coover Hall grid Turn off in high wind speeds.
PRE s ENT TO TRANSFER CASE WORK…….. ALL TO THE GEAR BOX……. -MAINTAINANCE….. -CHANGING OIL GEAR BOX…. -CHECKING OIL GEAR BOX……
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Internal Combustion Engine Senior Design Group Presenters: Daniel Carpio Bert Salazar Marc Worrell Rick Chavez-Oropeza David Perales Ernesto Villasenor.
‘Iole o Mãnoa Mouse of Mãnoa. Team Members Jeff Fines Designer, Fabricator, Programmer & Thomas Matsushima Designer, Fabricator, Programmer.
Tyler Andrew Patrick Mike. Team Members  Andrew Wills: Biomedical Engineering  Patrick Slavick: Electrical Engineering  Tyler Kiste: Industrial Engineering.
The WindMaster Lee Creviston Ben Peters Mark Rizzitiello Lindsey West.
Wind Turbine Project Plan (Dec08-04) ‏ Lindsay Short Nick Ries Luke Donney Dario Vazquez Chris Loots Advisor: Dr. Ajjarapu Client: Dr. Aliprantis.
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Environment and teaching kits Andrzej Kotlicki Physics and Astronomy.
LEDs in Rolling Stock Jim Hinds RICHMOND CONTROLS.
A New Way to Multi-task Get your exercise in while you work! A Bike-Powered Athena Workstation Group D Piotr Fidkowski Sebastian Figari Sara John.
Electricity Unit Overview Wednesday, April 1, 2015.
Dynamo Engine By Thomas Landi, Peter Son, Evan Tony.
Better Water Maker Mission Statement The customer will be able to access cleaner water with minimal human effort ensuring safer drinking water to third.
Auto turn off battery charger Auto turn off battery charger.
CH 6.5 Electric Power Tools.
Development of T3Maps adapter boards
FINAL PRESENTATION Western Michigan University Advisors:
Sustainable Hybrid Generator
Kit and Rule Changes for 2012 – 1/10
21/09/2018 Electricity.
James Sigler, Mohammed Allahyani, Khalid Alghamdi, Yu Sun
P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
Kit and Rule Changes for 2012 – 1/10
Windmill Generator Project
Bicycle Power – Alternative Energy and Fitness Solution
FINAL PRESENTATION Kennesaw State University
Replacing TrueAir Thermostat with Ecobee SI
Presentation transcript:

Alternative Energy Wind and Bicycle Power Choluteca, Honduras Group Members: Robbie Schram, Justin Letts, Ben Weekes May 23, 2013

Table of Contents Wind Generator Overview Project Goals Bicycle Generator Overview Project Goals Implementation in Country Project Summaries Recommendations for Future Acknowledgements

Wind Generator

Overview Why? Supply green sustainable energy to the vocational school Supply electricity to storage container Charge tools Power fluorescent lights Serve as a learning opportunity for students Produce systems independently Capabilities of “green” technology Avoid expensive power grid in Honduras

Overview Last year’s team built a mostly working system Completely wired to storage box BUT the blades did not spin quick enough to reach 12V Tried a gearing system out of motorcycle parts to fix Not enough time to perfect Once back in Columbus, new gearing system and motor sent Some internal parts broke Gearing system “persnickety” Wind blade broke

Scope of Work Purchase new motor Design and construct new wind blades Be able to connect blades to motor Fully operational Wind Generator

Bicycle Generator

Overview Why? Multi-Purpose Generator: Exercise Educate school patrons and people at clinic of maintenance/health and fitness Alternative Energy Human Powered Environmentally Friendly Charges phone batteries Bicycles are easily accessible Replicable and Portable

Overview 2012 initially built fully functional system Alternator 1 – Burned out Alternator 2 – Malfunctioned Connection between bicycle wheel and alternator did not work as intended Drum-driven system

Scope of Work Improve connection between bicycle and alternator Deliver two working bicycle systems Both using new alternators acquired and tested during class time Belt driven system Build prototype in Columbus to test alternators Safely secure electrical components Design and construct project with extreme user in mind

Implementation in Country

Work Schedule Wind: Tear down old windmill: 1 day Install new motor and blades: 1 day Trouble shooting: 2 days Testing/Calculations/Instructions: 1 day Bike: Modify and wire old bike stand: 1 day Fabricate and wire second bike stand: 1 day Trouble shooting: ½ day Testing/Calculations/Instructions: ½ day

Monday May 6, 2013 Toured vocational school Inspected old windmill motor and electrical components Inspected second bike stand Took down old motor and motor plate Drilled new holes to mount bracket for new motor

Tuesday May 7 th, 2013 Mounted new motor to wind armature Assembled new blades to fly wheel and fit to motor Raised pole, but it did not turn to face wind

The new motor is quite heavier than old Needed to push with pole to face wind Countermeasure idea: to balance armature by adding weight to tale, regrease pole

Wednesday May 8 th, 2013 Modified old bike stand to accommodate new alternator and belt design Wired bike stand and alternator and wrote directions for use Showed students at school how it worked and tested with clock radio from one of the offices of the vocational school

Thursday May 9 th, 2013 Balanced wind armature with scrap metal rails from the school Regreased pole Raised pole again, but windmill did not turn to face wind and only produced 9V even in highest winds Countermeasure proposal: bigger tail, cut out sections of fly wheel to reduce drag as well as weight on shaft of motor

Friday May 10 th, 2013 Fabricated second bike stand Needed to accommodate for different wheel and belt size and different model of alternator Wired second bike stand and tested again with clock radio Began cutting out large sections of fly wheel

Monday May 13 th, 2013 Finished cutting out flywheel Clamped on longer tail cut from sheet metal found at vocational school There was a break-in at the school and the 220V extension chord was taken so we couldn’t weld the tail Raised pole to test new fly wheel and tail Turned to face wind easily and produced a top voltage of 17.5V

Tuesday May 14 th, 2013 When arrived at school, windmill was turning to face wind just fine without extra tail Decided to add tail anyway to ensure windmill will turn in even light winds Instead, made tail smaller and rebalanced the armature Painted tail and raised pole for last time

Wednesday May 15 th, 2013 Spent day rewiring and soldering circuit board for windmill Found diode was fried and searched for replacements in Choluteca and had staff member search for one while he was in Tegucigalpa for the day, but could find no suitable diode While testing second bike setup, ran into problems with the belt wobbling and coming off Added pond liner to wheel to prevent wobbling Bike Channel

Wind Summary With modifications to fly wheel and tail, the wind generator works perfect mechanically While in Columbus, did not anticipate the need of a replacement diode Could not find an adequate diode in Choluteca or in Tegucigalpa Ordered a diode online and sent to next mission group going to Choluteca (Leaving today, May 23 rd ) Once installed, wind generator will be able to power electronics in the storage container at the vocational school

Wind Cost Analysis WindPriceLocation Pre-TripPVCFree ($200)Speer Mechanical Pre-TripAluminum Plate$19Stargate Metals Pre-TripPulley$21.80eBay Pre-TripMotor$198eBay Pre-TripHardware$16.51Lowe's Pre-TripRope$9.97Lowe's Post-TripDiodes$49.34Solaire's/Coleman Air HondurasLocktite$6.23Lowe's Pre-TripPaint$11.98ACE Total Cost: With Free PVC$ Including Price of PVC$532.83

Bike Summary Finished project with two working bicycle stands Adequately charge battery and power electronics as effectively as plugging them into the wall Larry decided to send one of the bike generators to a family in Siete de Mayo to observe how the Hondurans use and take care of it Second bike is currently at the vocational school, but we are unsure of future location

Bike Cost Analysis BikePriceLocation Pre-TripAlternators$ All City Auto Wrecking Inc./Woody's Auto Salvage Pre-TripThreaded Rod/Hardware$20.51Lowe's Pre-TripWoodFree/ScrapOSU Lab Pre-Trip1st BikeFreeRoger Dzwonczyk Pre-TripRechargeable Battery$19.95Batteries Plus Pre-TripInverter$32.01Harbor Freight Pre-TripToolboxes$12.76Lowe's HondurasDecking screws, hookup wire, hardware$83.28Lowe's Honduras2nd Bike$35 Casa de Empenos la Union HondurasBattery$25WGM HondurasBike and general$10.90WGM Total Cost:$441.84

Recommendations Wind: Research new blade material Send wind speed sensor to vocational school Wire up new diode Exchange current wind battery for old solar panel battery Bike: Move one of the bike stands to the clinic Design and construct stand for front wheel of bikes When buying bikes for futures stands using same design, ensure rear wheel channel is wide

Acknowledgements We would like to thank first and foremost Dr. Roger Dzwonczyk and Miriam Cater, without whose wisdom and expertise we could not have completed our projects so successfully Special thanks to: Larry and Angie Overhault Vocational School Staff Dr. John Merryl Patrick Bosch Professor Jeffrey Huston World Gospel Mission