Feb-2005 Barrier Isolator for Micronisation Equipments F.P.S Food and Pharma Systems S.r.l. Como - Italy.

Slides:



Advertisements
Similar presentations
ProStart Chapter 2 Year One
Advertisements

Hawk Chef Catering Lab Organization & Management
13:7 Using Sterile Techniques
Applying Floor Finish To Protect Floor Surfaces, and to Maintain Clean, Safe, Attractive Floors.
Design innovation stainless performance Introducing.
Multi-Clean Patient Room Procedures Introduction The cleaning procedures for Patient Rooms are broken into 2 groups. 1.Occupied - Daily The room is occupied.
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Crock Pot 101 Betty Greer, PhD, RD Professor Nutrition Specialist.
Chapter 13, Section 4. Safety First: Preparing Trash for Recycling Wear heavy, latex utility gloves. Do not reach into the trash to pull out an object.
Cutting Through the Static UPP Non-Conductive Pipework System.
NOISE CONTROLS FOR PLANTS AND MILLS. SOURCE PATH RECEIVER.
Multi-Clean Restroom Cleaning Procedures Introduction Restroom Cleaning may involve private, patient restrooms and general public restrooms.. Note: Special.
Cleaning, cooking, chilling and cross contamination
STOCKPILE MAINTENANCE PROCEDURES
Semi – Rigid Isolator Units Charles River Laboratories Consulting & Staffing Services.
Standardized Test Practice EXAMPLE 3 Darlene is making a quilt that has alternating stripes of regular quilting fabric and sateen fabric. She spends $76.
Decontamination of Samples and Evidence. Sample and Evidence Collection All samples and evidence are collected following best work practices for sampling.
KANON LIQUID HANDLING Suite 4, Brookside House Business Centre, Spring Road, Ibstock, Leics. LE67 6LR Tel : Fax :
`` ``. We sell all products that is used for outdoor Leisure. We sell products such as balls, T-shirts, shorts etc. We have special offers and lots more….
Given Connections Solution
Techno Homes Chemicals Solutions for Tomorrow's Technology.
Zhuhai SIMEIKE Machinery & Equipment Co. ,LTD www. simeike. net www
Infection Control. WHAT IS INFECTION CONTROL? Infection Control is the practice of preventing infection Infection Control is the practice of preventing.
INTRODUCING A FOOD MANAGEMENT SYSTEM FOR HOSPITALS (HACCP)
DIFFERING VIEWS OF INTEGRATED PEST MANAGEMENT (IPM): FOOD PROCESSING INDUSTRY’S VIEW BY JERRY W. HEAPS, BCE & RS THE PILLSBURY COMPANY MINNEAPOLIS, MN.
6.6 Solving Radical Equations. Principle of power: If a = b then a n = b n for any n Question: Is it also true that if a n = b n then a = b? Explain in.
How To Clean Sewer Pipe Phone:
Removing an Indwelling Catheter ACC RNSG 1341 online.
Students will identify ways to prevent cross contamination. Students will explain the difference between cleaning and sanitizing. Students will identify.
Plant Pressing Natural History Museum Tom Ridge Environmental Center.
Manufacturing in Plastics Thermoplastic Processes.
T. Freemantle Ltd SPECIALISTS IN SLEEVING EXPERTS IN CARTONING FOOD - HOUSEHOLD GOODS - COSMETICS - HEALTHCARE - PHARMACEUTICAL The UK Market Leader Serving.
T. Freemantle Ltd SPECIALISTS IN SLEEVING EXPERTS IN CARTONING FOOD - HOUSEHOLD GOODS - COSMETICS - HEALTHCARE - PHARMACEUTICAL The UK Market Leader Serving.
1.01 T Food Sanitation. Kitchen Equipment 21.01TFood Sanitation Kitchen equipment should be: Clean Properly working.
Lab Management Information. Before Starting a Lab:  1. Wash hands with hot, soapy water for 20 seconds. Rewash whenever necessary.  2. Long hair must.
SANITATION & HYGIENE with ®.  The handwashing sink is to be used for handwashing ONLY.  Never use this sink for other purposes. Handwashing Sink.
Lab Management Information. Before Starting a Lab:  1. Wash hands with hot, soapy water for 20 seconds. Rewash whenever necessary.  2. Long hair must.
Module 10-1 (a) Manual Gun Cleaning Processes n Manual equipment cleaning generates large quantity of wastes if not done properly. n Solvent is exposed.
What can parents do? You do NOT need to know anything special, but you DO need to read the requirements for the events in which your child will compete.
Side Job Duties Be prepared to write the information on the handout provided.
IsoXL BSL3/BSL4 SYSTEM FOR LARGER ANIMALS By Corporate Marketing Department -Tecniplast, Buguggiate -
Hawk Chef Catering Lab Organization & Management.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
Table of Contents. Lessons 1. Standard Precautions GoGo 2. Gowns GoGo 3. Masks and Eyewear GoGo 4. Non-Sterile Gloves GoGo.
Engineering controls for exposure to APIs - before and after Level 4 Ingrid Vande Velde - Information provided subject to the 'Conditions for Sharing Materials.
1.01 T Food Sanitation. Kitchen Equipment 21.01TFood Sanitation Kitchen equipment should be: Clean Working properly Tight handles.
Solving the Challenges of Containing an Existing Compression Process using Hard-wall and Flexible Containment (A Work in Progress!)
Make it Fair Dominic has made up a simple game.
Value Added Tax Supplies of Goods
SANITATION & HYGIENE with
1. INTRODUCTION OF COMPANY
SANITATION AND HYGIENE
Developing Film To develop your exposed film, you need to transfer the film from the film cassette into the light-proof processing tank. This needs to.
SANITATION & HYGIENE with
Pharma Knowledge Centre Pharma Knowledge Centre (PKC) “My Learning Life” is engaged to bridge the real time knowledge gap between Academia and Industry.
Pharma Knowledge Center Pharma Knowledge Center (PKC) "My Learning Life" is locked in to connect the constant information hole amongst Academia and Industry.
BACK SOLUTION:
World Class Smart Security System - Maui, Hawaii
Convenient cleaning robot
SANITATION & HYGIENE with
Urban Agriculture Expectations and Procedures
Your Testing and Compliance Partner
ILC Dover Powder Transfer
 Define: The stirring heating plate or heated stirring heating plate has been developed to heat and mix fluids contained in laboratory receptacles such.
Service Items Platinum Gold Silver
Unit 1 Don’t touch the machines, please! K01.
The cleaning procedures for Patient Rooms are broken into 2 groups.
Restroom Cleaning Procedures
ประกาศกระทรวงอุตสาหกรรม ฉบับที่ 5292 (พ.ศ. 2562)
Presentation transcript:

Feb-2005 Barrier Isolator for Micronisation Equipments F.P.S Food and Pharma Systems S.r.l. Como - Italy

Feb-2005 Barrier Isolator – Main View Outside Main View - Outside Barrier Isolator for Micronisation Equipments

Feb-2005 Barrier Isolator – Main View Outside

Feb-2005 Barrier Isolator – Main View Outside

Feb-2005 Barrier Isolator – Main View Outside

Feb-2005 Barrier Isolator – Main View Outside

Feb-2005 Barrier Isolator – Main View Outside

Feb-2005 Barrier Isolator – Main View Outside

Feb-2005 Barrier Isolator - Main View Inside with PilotMill-3 Main view – Inside with PilotMill-3 Barrier Isolator for Micronisation Equipments

Feb-2005 Barrier Isolator - Main View Inside with PilotMill-3

Feb-2005 Barrier Isolator - Main View inside with PilotMill-3

Feb-2005 Barrier Isolator - Main View Inside with PilotMill-3

Feb-2005 Barrier Isolator - Main View Inside with PilotMill-3

Feb-2005 Barrier Isolator - Main View Inside with PilotMill-3

Feb-2005 Barrier Isolator - Main View Inside with PilotMill-3

Feb-2005 Barrier Isolator - Main View Inside with PilotMill-3

Feb-2005 Barrier Isolator – Schematic Working Principle Schematic Working Principle Barrier Isolator for Micronisation Equipments

Feb-2005 Barrier Isolator – Schematic Working Principle Isolator ready to work

Feb-2005 Barrier Isolator – Schematic Working Principle Container with product connection

Feb-2005 Barrier Isolator – Schematic Working Principle Container with product connection

Feb-2005 Barrier Isolator – Schematic Working Principle Container with product connection

Feb-2005 Barrier Isolator – Schematic Working Principle Container with product rotation for proper coupling

Feb-2005 Barrier Isolator – Schematic Working Principle Container ready to open

Feb-2005 Barrier Isolator – Schematic Working Principle RTP opened

Feb-2005 Barrier Isolator – Schematic Working Principle Product transfer

Feb-2005 Barrier Isolator – Schematic Working Principle Product transfer

Feb-2005 Barrier Isolator – Schematic Working Principle Product introduced into the barrier isolator

Feb-2005 Barrier Isolator – Schematic Working Principle RTP closed

Feb-2005 Barrier Isolator – Schematic Working Principle Empty container disconnection

Feb-2005 Barrier Isolator – Schematic Working Principle Product charging into feeder hopper

Feb-2005 Barrier Isolator – Schematic Working Principle Product charging into feeder hopper

Feb-2005 Barrier Isolator – Schematic Working Principle Product charging into feeder hopper

Feb-2005 Barrier Isolator – Schematic Working Principle Product charging into feeder hopper

Feb-2005 Barrier Isolator – Schematic Working Principle Hopper charged

Feb-2005 Barrier Isolator – Schematic Working Principle Equipment ready to start

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation started

Feb-2005 Barrier Isolator – Schematic Working Principle Product fed into the jetmill

Feb-2005 Barrier Isolator – Schematic Working Principle Product fed into the jetmill

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation proceeds

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation proceeds

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation proceeds

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation proceeds

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation proceeds

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation proceeds

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation proceeds

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation proceeds

Feb-2005 Barrier Isolator – Schematic Working Principle Micronisation completed

Feb-2005 Barrier Isolator – Schematic Working Principle Product bag is closed

Feb-2005 Barrier Isolator – Schematic Working Principle Endless liner is connected

Feb-2005 Barrier Isolator – Schematic Working Principle Product bag is prepared for transfer

Feb-2005 Barrier Isolator – Schematic Working Principle Transfer door is opened

Feb-2005 Barrier Isolator – Schematic Working Principle Product bag is transferred

Feb-2005 Barrier Isolator – Schematic Working Principle Product bag is transferred

Feb-2005 Barrier Isolator – Schematic Working Principle Transfer door is closed

Feb-2005 Barrier Isolator – Schematic Working Principle Product bag is moved to the end of endless liner

Feb-2005 Barrier Isolator – Schematic Working Principle Product bag is moved to the end of endless liner

Feb-2005 Barrier Isolator – Schematic Working Principle Endless liner is cut

Feb-2005 Barrier Isolator – Schematic Working Principle Product bag is disconnected from endless liner

Feb-2005 Barrier Isolator – Equipment Cleaning Equipment Cleaning Barrier Isolator for Micronisation Equipments

Feb-2005 Barrier Isolator – Equipment Cleaning Equipment has to be cleaned

Feb-2005 Barrier Isolator – Equipment Cleaning Spray balls are activated

Feb-2005 Barrier Isolator – Equipment Cleaning Spray balls are activated

Feb-2005 Barrier Isolator – Equipment Cleaning Spray balls are activated

Feb-2005 Barrier Isolator – Equipment Cleaning Spray balls are activated

Feb-2005 Barrier Isolator – Equipment Cleaning Spray balls are activated

Feb-2005 Barrier Isolator – Equipment Cleaning Spray balls are activated; local cleaning by means of a washing gun.

Feb-2005 Containment and Micronisation Solutions for the Pharmaceutical Industry F.P.S Food and Pharma Systems S.r.l. Como - Italy Tel – Fax