2012 - Ninth Annual TFMA Freeboard Survey Special Acknowledgement To Charlie Hastings PE, CFM, who initiated the First TFMA Survey in 2004.

Slides:



Advertisements
Similar presentations
Regulations and Processes for Floodway/Non-Encroachment Area Encroachments. What to look for and what to require. Robert Billings, PE, PH, CFM Mecklenburg.
Advertisements

Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
IV. 1 IV. Overview Of State Standards A.SS1-97: Requirement for Flood Study Technical Documentation.
Flood Damage Prevention Ordinance.  Legal means for communities to set standards for regulating floodplain development  Dependent upon type of mapping.
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
Levee Decertification & CRS: How a Catch-22 Can Catch You! ASFPM 2011 National Conference Louisville, KY Wednesday, May 17, 2011 ASFPM 2011 National Conference.
Oklahoma CRS Workgroup and CRS Program Update Oklahoma Floodplain Managers Association 2011 Annual Conference, Norman Oklahoma Jeff Bigby, PE, CFM Floodplain.
Variances and NFIP Requirements. Floodplain Management Regulations  44 CFR Section 60.6(5)  A community shall notify the applicant in writing over the.
Springettsbury Township STORMWATER AND HOW IT AFFECTS YOU February 19, 2013.
NYS Department of Environmental Conservation The National Flood Insurance Program A Program Overview.
FEMA NFIP Community Rating System and Crediting Tsunami Mitigation Mike Mahoney, FEMA Mitigation.
NATIONAL FLOOD INSURANCE PROGRAM Carol Tyau-Beam, P.E., CFM State NFIP Coordinator Department of Land and Natural Resources, Engineering Division Honolulu.
A Simplified Method of Implementing No Rise Analysis in Unnumbered A-Zones Based Upon No Loss of Conveyance Dwayne E. Culp, Ph. D., P.E., CFM Second National.
Understanding Advisory Base Flood Elevations (ABFEs) Understanding Advisory Information and the Implications for Your Home December 2012.
Maine Association of Mortgage Professionals
August 2005 Certified Floodplain Manager Program (CFM ® ) Association of State Floodplain Managers (ASFPM)
CRS in Georgia How Does it Work? Why Participate?
N ATIONAL F LOOD I NSURANCE P ROGRAM (NFIP): T HE B ASICS & U PDATE ON THE C URRENT S TATE OF A FFAIRS Mary-Carson Stiff, JD, CFM Shannon Hulst Jarbeau,
North Carolina Neuse River Basin Plan Final Scoping Meetings April 23, 24, and 25, 2001.
Osceola County Floodplain Program
CHAPTER 3 MAPS AND MAP CHANGES
Floodplain Management Regulations and the Florida Building Code
Flood Mitigation for Structures in the Gulf Coast Region Norma Jean Mattei, Ph. D., P.E. University Of New Orleans Special thanks to: Chris Jones, PE and.
Floodplain Management 101 Texas and Federal Laws and the National Flood Insurance Program.
Creating Depth Grid from a DFIRM FEMA Region VIII Mitigation GIS Team Wednesday, February 13, 2013.
CRS AUDIT A STUDY ON TYBEE ISLAND’S CRS AND OPEN SPACE PROGRAM National Flood Insurance Program Community Rating System August 28, 2014.
Flooding & Drainage Committee May 16,  Participate in the National Flood Insurance Program (NFIP)  Participate in the Community Rating System.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Flood Insurance 101 Bill Massey and Sam Crampton Dewberry South Florida Water Management District Floodplain Management Training May 2005.
Higher Regulatory Standards Series 430. Higher Regulatory Standards 432 Elements Dougherty County (2007 Manual) – Total Points: 2740 – Activity 430.
Advisory Base Flood Elevations: What Your Community Needs to Know Information for Floodplain Managers and Local Officials.
FEMA Region VIII Reducing Losses through Higher Regulatory Standards 2013 Colorado Floods Case Study May 2015 HMTAP HSFEHQ-09-D-1129 / 14-J-0003.
Increased Cost of Compliance The Basics (Last updated July 25, 2006)
An Overview of the Community Rating System (CRS)
North Carolina Emergency Management Floodplain Management Section NC Department of Revenue 2013 Advanced Real Property Seminar Biggert-Waters National.
Hazard Mitigation Assistance Hazard Mitigation means any action taken to reduce or eliminate the long-term risk too human life and property from natural.
The Status of NFIP Reform and Floodplain Mapping Mayors’ Water Summit December 8, 2010.
Risk MAP and Resilience Mari Radford, CFM, Mitigation Planner Alison Kearns, CFM, Community Planner FEMA Region III.
Town of Kill Devil Hills Flood Plain Management & Regulations October 2007.
North Carolina Pasquotank River Basin Plan Final Scoping Meetings May 17 and 18, 2001.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Mike Buckley, PE Former FEMA Executive May 27, 2015 Istanbul, Turkey.
TFMA 2007 Freeboard Survey Special Acknowledgement To Charlie Hastings PE, CFM, who initiated the 2004 Survey and TFMA members that participated.
Polk County Preliminary Digital Flood Insurance Rate Maps City of Windsor Heights Public Meeting Polk County Preliminary Digital Flood Insurance Rate Maps.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
ASFPM Conference – May Shifting Our Focus from Maps to Risk William L. Coulbourne, P.E. Applied Technology Council (ATC)
Objectives At the end of this unit, you should be able to:
Montana and the National Flood Insurance Program Marijo Brady, P.E., CFM FEMA Region VIII
Floodplain Management Ordinance Public Hearing September 22, 2009 Floodplain Management Ordinance Public Hearing September 22, 2009.
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
Polk County Preliminary Digital Flood Insurance Rate Maps City of Clive Public Meeting Polk County Preliminary Digital Flood Insurance Rate Maps November.
City Council Workshop March 27, 2014 Debbie Vascik, CFM Cahoon Consulting.
Unit 12: Course Summary. Objectives At the end of this unit, you should be able to:  Describe key content covered in the course.  Complete the post-course.
Prince George’s County Flood Forum March 23, 2017
What is TFMA? Organization of professionals with a wide range of experience and expertise. Our Purpose, Mission, and Goals: Facilitate sound floodplain.
Floodplain Management Program Benton County
Flood Damage Prevention Code Update
44 CFR PARTS 59 & 60 MINIMUM REQUIREMENTS
Enforcement of Floodplain Management Regulations
Basic NFIP Requirements and Local Government Responsibilities
Glynn County, GA Flood Remapping January 2018
Land Use and Zoning Committee Special Workshop
FLOODPLAIN MANAGEMENT FEMA and the Florida Building Code
Water Quality Management & Planning Conference
Drainage initiative proposed revisions to the code of ordinances
Tulsa's Risk MAP Program Goals
Oklahoma CRS Workgroup and CRS Program Update
Presentation transcript:

Ninth Annual TFMA Freeboard Survey Special Acknowledgement To Charlie Hastings PE, CFM, who initiated the First TFMA Survey in 2004

“Work in Progress”  Roy Sedwick, CFM – TFMA/TCRFC  Mike Segner, CFM – TWDB (SC/NFIP)  John Ivey, PE, CFM – Halff Associates

Higher Standards Question  Can a Texas County adopt higher Standards?  Yes___; No___

Senate Bill 936  Amends the Texas Water Code  Authorizes political subdivisions to adopt more comprehensive floodplain management rules  Authorizes participate in floodplain management and mitigation initiatives such as FEMA’s Community Rating System (CRS) Program  Allows collection of reasonable fees to cover the cost of administering a local floodplain management program  Allows steps, using regional, watershed, and multi- objective approaches, to improve the long-range management and use of flood-prone areas

TFMA’s Freeboard Goals  Reduce the risk of loss of life and property damage from floods  Encourage wise floodplain development  Reduce annual flood claims  Reduce the number of Repetitive Loss and Severe Repetitive Loss properties  Encourage higher floodplain standards  Increase participation in CRS

NFIP Flood Claims in Texas (Thank God Texas is no longer #1)   $5.4 Billion (Texas)  $40.8 Billion Nationally  Texas represents 13.4%  Louisiana, Texas and Florida = 61.6% Billion $ TEXAS LOUISIANA FLORIDA

2012 Freeboard Questionnaire  Zone AE/VE - New construction must be elevated ___ feet above BFE as shown on FIRM (existing conditions).  Zone AE/VE - New construction must be elevated ___ feet above BFE determined by a study based on fully developed watershed (future conditions)

Zone A (no BFE) - Developer must conduct a study to define the BFE. Yes ____; No ____; [Note: Study required if development exceeds 50 lots or 5 acres – 44CFR60.3(b)(3)] [Note: Study required if development exceeds 50 lots or 5 acres – 44CFR60.3(b)(3)]

Zone A (unnumbered)  Developer must conduct a study to define the floodplain and floodway boundaries and BFE’s based on existing conditions. Yes ____; No ____;

Zone A (unnumbered)  Developer must conduct a study to define the floodplain and floodway boundaries and BFE’s based on fully developed watershed (future conditions) Yes ____; No ____;

Floodway Requirements  Floodway - no development is allowed within the floodway boundary. Yes ____; No ____; [ Several communities prohibit all development in the floodway ]

Floodway Requirements  No fill is allowed in the floodway or floodplain without mitigation (No Adverse Impact = NAI). Yes ____; No ____; [ Several communities prohibit development even if there is no rise ]

Detention Requirements  Is Detention Required? Yes ____; No ____;  Notes:  1. Several communities require “No Adverse Impact” (NAI)  2. Several communities require mitigation of all fill placed in floodplain and floodway  3. Several communities require zero rise for all development within the SFHA

Requirements in Zones B, C & X  Zone X (Shaded) - New construction must be elevated ___ feet above natural grade or above the crown of the nearest street.  [ Friendswood and other communities require new construction to be elevated a minimum of +2’ in Zone X-shaded and Zone X-unshaded ]

Requirements in Zones B, C & X  Zone X (Unshaded) - New construction must be elevated ___ feet above natural grade or the crown of the nearest street.  Note: FEMA’s definition of Zone X (shaded) is areas of 2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood.

Elevation Certificates  Elevation Certificate Requirements - (1) Submitted prior to forming/pouring lowest floor. Yes ____; No ____; (1) Submitted prior to forming/pouring lowest floor. Yes ____; No ____; (2) Submitted when structure is completed. Yes ____; No ____; (2) Submitted when structure is completed. Yes ____; No ____; (3) Required prior to issuing a CO. (3) Required prior to issuing a CO. Yes ____; No ____;  Note: Several communities require multiple EC submittals.

Community Rating System  Is your community enrolled in CRS? Yes ____; No ____;  Current CRS Rating ___  Is your community floodplain manager a CFM? Yes ____; No ____; How many CFM’s does your community have on staff? ___

Higher Standard Examples  Detention (on-site and/or regional)  Setbacks from FP and/or FW boundaries  CLOMR required before permit issued  No development in floodway or “Zero Rise”  No development in floodplain or “Zero Rise”  No Adverse Impact (NAI)  Additional Wetland/Wildlife requirements  Floodplain area must be open space or in easement  Critical Facilities must be elevated above 500-year  No loss of “Valley Storage”  Cumulative Substantial Improvement/Damage  Water quality (protection) requirements  Other higher standards ……….

2012 Survey Results

2012 TFMA Freeboard Survey  250 communities responded (to date)  202 Incorporated communities and 48 counties  211 (84%) have adopted +1’ or more freeboard  63 (25%) Require BFE’s using fully developed hydrology  60 (24%) require detention  132 (53%) have a CFM on staff  HCFCD has 9 CFM’s on staff  COSA has 20 CFM’s on staff  Dallas has 15 CFM’s on staff  TxDOT has 31 CFM’s across the state  Halff Associates has 50 CFM’s in Texas

Benefits of NCTCOG’s Higher Standards  2012 Population6,640,290  Growth1,230,673 (23%)  NFIP Policies23,752  NFIP Claims5,852 (1)  Claims/10,000 pop8.81  (1) Total from 1978 to 2012

Benefits of NCTCOG’s Higher Standards  RL Properties660 (1)  RL Claims1,921 (1)  Declared Flood Disasters68 (1)  Planning Area12,796 sq mi  Density519 persons/sq mi  CRS Communities17 (31%)  (1) Total from 1978 to 2012  Data sources: NCTCOGNCTCOG FEMA CISFEMA CIS

Higher Standards Resources  ASFPM – ASFPM – ASFPM –  files/documentlibrary/committees/Higher_ Stds_Ref_Guide_ pdf files/documentlibrary/committees/Higher_ Stds_Ref_Guide_ pdf files/documentlibrary/committees/Higher_ Stds_Ref_Guide_ pdf  NAI Committee - A Common Sense Strategy for Floodplain Management

A Guide for Higher Standards in Floodplain Management Prepared by: ASFPM Floodplain Regulations Committee June 2011

Guide for Higher Standards I. FREEBOARD   II. ACCESS (INGRESS-EGRESS)  III. COMPENSATORY STORAGE  IV. CRITICAL DEVELOPMENT PROTECTION  V. CUMULATIVE SUBSTANTIAL DAMAGE/IMPROVEMENT  VI. FILL STANDARDS  VII. FLOODWAY RISE  VIII. FOUNDATION DESIGN

IX. FUTURE CONDITIONS HYROLOGIC MAPPING X. MATERIALS STORAGE XI. SETBACKS XII. STORMWATER MANAGEMENT XIII. SUBDIVISION STANDARDS XIV. USE RESTRICTIONS XV. REGULATING AREAS NOT MAPPED ON FIRM XVI. ELEVATION OF ALL ADDITIONS XVII. COASTAL SITING XVIII.DUNE PROTECTION

XIX. COASTAL CONSTRUCTION XX. COASTAL A ZONE XXI. SINK HOLE STANDARDS XXII. PLAYA LAKE STANDARDS XXIII.ALLUVIAL FAN STANDARDS XXIV.RIGHT OF ENTRY TO ENFORCE FLOOD PLAIN ORDINANCE XXV. ENFORCEMENT – FINES AND PENALTIES

FREEBOARD REQUIREMENTS IN ZONE D:  Zone D: areas mapped as Zone D on the community Flood Insurance Rate Map (FIRM), are defined as areas in which flood hazards are undetermined, but possible  FEMA’s proposed levee mapping procedures for decertified levees is to map areas behind decertified levees as Zone D and Zone AE

Figure 4-2. Sound Reach Cross Section View

Figure 4-4. Freeboard Deficient Cross Section View

Figure 4-6. Overtopping Cross Section View

Figure 4-8 Structural-Based Inundation Cross Section View

Figure Natural Valley Cross Section View

Zone D Challenges  Communities typically do not deal with Zone D  Flood insurance is not required in Zone D however lenders may require anyway  Zone D rates are higher than Zones B, C, X

MODEL LANGUAGE  Add the following sentence (bolded) to specific requirements for Residential Structures and Non-Residential structures:  In areas mapped as Zone D on the community Flood Insurance Rate Map (FIRM), the structure shall have the lowest floor, including basement, elevated at least two feet above the highest adjacent natural grade or above the crown of the nearest street, whichever is higher.

Thank you for participating! Roy says “Higher Standards saves lives and reduces flood losses” Submit Surveys to John Ivey at Survey can be downloaded from