Biodiversity and the Thames Tunnel Stephanie McGibbon, EIA Manager 12 May 2011.

Slides:



Advertisements
Similar presentations
Acton Quarry – Proposed Extension Natural Environment Pre-Submission Liaison Committee Information Session January 22, 2009.
Advertisements

Development that got it right (or almost right... ) Good examples of BAP delivery as part of development in Northamptonshire Rachel Gorman Team Leader.
Olympic Delivery Authority Biodiversity Action Plan.
Ecology: Mitigation & Enhancement for Onshore Wind Farms
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Environmental Project Commitments The Alberta Experience
LIVERPOOL’S ECOLOGICAL FRAMEWORK Jane Hayward – Liverpool City Council.
Biodiversity Project Manager Warwickshire Habitat Biodiversity Audit
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
The London Tideway Tunnels Creating a cleaner, healthier River Thames Sian Thomas, Thames Tunnel Project Manager 14 October 2008.
Why London needs the Thames Tunnel IEMA Conference 2011 Optimising Infrastructure within environmental limits Tuesday 15 November 2011.
Europe Overseas Roundtable on Biodiversity and Climate Change 25th of September 2014, Brussels eea.europa.eu EEA activities on the EU Overseas Frank Wugt.
Derbyshire Protecting wildlife Restoring landscapes Inspiring people Planning and Ecology Planning and Ecology February 23 rd 2012 Trevor Taylor Local.
By Erick Arellano December Description The Westminster Ponds Mills complex is one of the largest Natural Areas in London, comprising some 300 hectares.
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
RAPID ASSESSMENT PROGRAM (RAP) Terrestrial Ecosystems Freshwater Ecosystems Marine Ecosystems.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
NYS Department of Environmental Conservation Climate Change Adaptation Challenges: Maintaining Ecosystem Services in Shoreline Management.
Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
A Best Practice Guide to Using BARS. This slideshow demonstrates best practice in using BARS to write a 'SMART' BAP and report on progress using a model.
Managing the Natura 2000 network: state of play, challenges and opportunities.
Review of the implementation in England of the Habitats and Wild Birds Directives Nature Directors 23 May 2012 Robin Mortimer, Defra.
LEGISLATIVE DEVELOPMENTS IN NATURE CONSERVATION AND HABITATS LAW IN 2011 Margaret Austin 29 March 2012.
Consultant: CMDC Joint Venture 1 The Polish Experience and Possibilities of a Future EIA Centre Beata Wiszniewska EIA Expert, Poland June 8 th 2004.
Wildlife and Wildlife Habitat Kim Poole Wildlife Discipline Lead Aurora Wildlife Research Jess Dunford Wildlife Biologist Gartner Lee Limited.
Program Implementation Lower Colorado River Multi-Species Conservation Program.
PROJECT UPDATE GEOFF LOADER, HEAD OF STAKEHOLDER ENGAGEMENT
A96 Fochabers Bypass Moray Council 15 August 2007.
Baseline Data from Survey The survey established baseline data on vegetation, Mammals, Birds, amphibians, reptiles, and invertebrates. – no known protected.
British Energy Public Meeting, Nether Stowey, Monday 20 th October 2008 Richard Mayson, Nuclear Counsel © Copyright EDF Energy plc. All rights reserved.
Narragansett Bay Environmental Monitoring Li-Ling Yang Roger Williams University.
Welcome to LBAP conference session. Warwickshire, Coventry and Solihull Local Biodiversity Action Partnership Biodiversity targets Globally and nationally,
Zoe G. Davies Centre for Evidence-Based Conservation University of Birmingham, UK Systematic Review Protocol Development.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
Emily May Green Infrastructure: An Evidence Base for Birmingham.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Establishing the Scientific Basis for Ecosystem Management On the Upper Mississippi River Dr. Ken Lubinski, USGS Upper Midwest Environmental Sciences Center.
Knowledge and research needs for wetlands and lakes IWRM presentation 18 November 2008 Johan Schutten Senior Wetland Ecologist SEPA.
Ecological Assessment of Symonds Yat Rapids Eric Palmer Cresswell Associates.
Terrestrial Ecology section of the EIA for the proposed desalination plant at Mile 6 Presented by: Dr. Juliane Zeidler Reagan Chunga Integrated Environmental.
INNOVATION ON THE THAMES NOVEMBER 2015 ANDY MITCHELL CBE, CHIEF EXECUTIVE OFFICER.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Unit Webex Meetings Step 1: Targets, Threats, and Stresses.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
0 Sustainability – Net Positive Environmental and Social Gains from Mining Reuben Mills, Director Health Safety & Environment October.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
REDHILL BUSINESS PARK INTRODUCTION Redhill Business Park was developed by Staffordshire County Council with Balfour Beatty as the main contractor. The.
BUILDING FOR 22ND CENTURY LONDON
LIFE AS AN ECOLOGICAL CONSULTANT
Ecological Assessments for Planning
S&C Northern Alliance – newt habitat and refuge creation at Sileby
Veolia Rye House Energy Recovery Facility Ecological Considerations.
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Assessment Statements
Severn Tidal Power Feasibility Study
Slaughden SMP Policy Review
DG Environment, Nature Protection Unit (D3)
Kerstin Sundseth, Ecosystems LTD
Overview of Article 6 procedures under the Habitats Directive
Leadership in Environment, Ecology, Planning and Sustainability
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Biodiversity and the Thames Tunnel Stephanie McGibbon, EIA Manager 12 May 2011

Contents Overview of the Thames Tunnel project Thames Tunnel EIA and Biodiversity –Data gathering –Initial findings –Engaging with stakeholders Questions

Project overview

Victorian infrastructure

Combined sewer system

57 Combined sewer overflows (CSOs)

Headline news

Thames Tunnel to intercept combined sewer overflows

Capturing the overflows

Environmental Impact Assessment (EIA) and Biodiversity

Baseline Baseline Survey Reports Scoping Scoping Report (March 2011) Preliminary Environmental Information Preliminary Environmental Information Report (Autumn 2011) Environmental Statement Stakeholder Consultation EIA & reporting stages

Terrestrial ecology data gathering Desk Study: GIGL data search and consultation Use of Satellite/Geo-viewer Imagery Phase 1 Habitat Surveys and Plans (completed) Detailed Surveys for Protected/Notable Species (underway)

Terrestrial ecology: protected / notable species surveys Bats Birds (Breeding & Wintering) Reptiles Amphibians Invertebrates Otter and water vole Botanical

Phase 1 terrestrial ecology surveys - extract SiteHabitatsSpecies Potential Abbey MillsMature trees Scrub Semi-improved grassland Disused buildings Birds Bats Reptiles Invertebrates Water Voles and otter Invasive Plants Acton Storm TanksAmenity grassland Tall ruderal vegetation Scattered trees Wintering birds Bats Reptiles Barn ElmsAmenity grassland Semi-improved grassland Tall ruderal vegetation Scrub Scattered trees Running water Breeding and wintering birds Badgers Bats Reptiles Invertebrates Water Voles and otter Beckton STWScrub Scattered trees Plantation woodland Standing water Breeding and wintering birds Black redstart Bats Reptiles

Aquatic ecology data gathering Desk study –Environment Agency fish and invertebrate databases –Mammal data –Local Habitat Action Plan’s (HAPs) Field surveys –Construction and ‘Improvement’ sites –Range of sites and spatial scope of survey

Fish surveys (autumn 2010)

Total fish

Invertebrates surveys (Autumn 2010)

Invertebrate diversity

Mitigation hierarchy REDUCE IMPACT ABATE IMPACTS AT SOURCE ABATE IMPACTS ELSEWHERE (as close to impact as possible) COMPENSATE IN KIND COMPENSATE BY OTHER MEANS ENHANCE Enhancement Compensation Mitigation AVOID IMPACT

Balance sheet ABCDEFG Habitat Permanent landtake for built footprint Mitigation landtake Total landtakeHabitat creation Habitat enhancement Total creation/ enhancement Net loss/gain WoodlandHa Scattered TreesNo. HedgerowM ScrubHa Tall RuderalHa Ornamental Planting/Introduced Shrub Ha Semi-improved Grassland Ha Amenity GrasslandHa Short Perennial/DisusedHa Standing Water/WetlandHa TOTAL (Semi-natural habitats) Hard-standing (buildings and roads/tracks) Ha TOTAL (All habitats)

Engaging with stakeholders A Thames Tunnel Biodiversity Forum has been established –November 2010 –March 2011 Stakeholders –14 local planning authorities –Environment Agency –Natural England –London Biodiversity Partnership –Thames21

Background Information Slides For reference

Bazalgette’s intercepting sewers

Thames Tideway Strategic Study Two problems: Overloaded sewage treatment works; discharging directly into the river after heavy rainfall Overloaded sewer network; discharging into the river via CSOs. Three solutions:

River Brent River Lee River Roding River Beam River Ingrebourne Sewage treatment works discharging to the tidal River Thames Thames Estuary Southend Gravesend Long Reach Riverside Crossness Mogden Beckton

The Lee Tunnel Four mile tunnel from Abbey Mills to Beckton. To start and end on land we already own; requires no intermediate construction sites. To intercept 16 million cubic metres of untreated sewage currently discharged into the River Thames each year on average, via the River Lee. Planning consent granted, subject to planning conditions. £600 million project – largest contract TWUL has ever awarded. Construction started in June 2010 and is scheduled to finish in 2014.

Birds Objectives: To obtain survey data on wintering birds and breeding birds at and adjacent to preferred work sites. Approach: A huge amount of data and local knowledge already exists on bird populations across London. Proposed work sites will first be screened for inclusion in the survey. Sites will then be further screened on the basis of current knowledge. Methodology: Survey methodologies would be developed. Methodologies will be agreed in consultation with statutory agencies.

Bats Objectives: To obtain information on the following, which could be affected by development works i)roost sites, and ii)any significant foraging or commuting routes Gather and collate existing data Phase 1 surveys will include a site evaluation Initial use of remote monitoring equipment Site surveys. Surveys methodologies Approach/Methodology: There is a large pool of existing data on sites used by bats. The approach will be to: