1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009.

Slides:



Advertisements
Similar presentations
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Advertisements

New Paradigms for Measuring Savings
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
eQuest Quick Energy Simulation Tool
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
A Comparison of Measure Avoided Cost Calculations using Utility TOU Load Shapes and DEER Hourly Measure Savings 14 March 2006.
E3 Calculator Revisions 2013 v1c4 Brian Horii June 22, 2012.
1 Illustrative Results Based on E3’s Avoided Cost Model Thursday, April 19, 2012 Marginal Generation Costs.
EE Reporting Tool Training California Municipal Utilities Association & Southern California Public Power Authority August 4, 2010 Eric Cutter Senior Consultant.
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
DEER2013 Codes and Standards Update for the Cycle 17 July 2013.
California Energy Commission Role of Codes and Standards and Energy Procurement Planning in Determining Baseline Chris Kavalec, Demand Analysis Office.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Energy and Environmental Economics 1 Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 3, 2005.
Regulatory View of DSM/EE David Drooz Public Staff – N.C. Utilities Commission April 2015.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
Copyrighted © 2000 PG&E All Rights Reserved CASE Initiative Project TDV Economic Update Brian Horii and Snuller Price Energy & Environmental Economics,
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Over 60,000 Honda MCHP Units at work in Japan
Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 3, 2005.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
Vermont Electric Energy Efficiency Potential Study – Draft Findings April 10, 2006.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
1 EE Evaluation Report on 2009 Bridge Funding Period California Public Utilities Commission November 22, 2010 Energy Division Energy Efficiency Evaluation.
EDISON INTERNATIONAL® SM Internal Use Only Page 1 Circulating Block Heater Alfredo Gutierrez Cal TF Work Paper Presentation October 23, 2014.
Avoided Costs of Generation
Technical Conference on Net Metering Load Research Study November 5, 2014.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Results from the California Energy Efficiency Potential Study – Existing Residential and Commercial Jean Shelton July 27, 2006 San Francisco, California.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
1 CPUC Avoided Cost Workshop Introduction and Overview.
1 Issues summary Pre workshop comments. 2 Scope of the 2006 Update 1. Common definition of peak 2. Avoided cost and E3 Calculator updates for peak and.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Ben Chou NRDC Water Program Clothes Washer Recycling Work Paper Abstract California Technical Forum October 23, 2014.
Northwest Power and Conservation Council Residential Conservation Resource Assessment Overview of Analytical Process and Major Assumptions April 21, 2009.
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
ProCost Version 3 Christian Douglass, Ryan Firestone, Charlie Grist
National Action Plan for Energy Efficiency eeactionplan The Role of Energy Efficiency in Utility Energy Planning Snuller Price Partner Energy.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
Northwest Power and Conservation CouncilProCost Version 2.2 RTF July 2007.
Renewables and System Services Ann Scully.
Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
Northwest Power and Conservation Council A Look At The Council’s Conservation Planning Methodology and Assumptions A Look At The Council’s Conservation.
Cost-Effectiveness Evaluation Calculator Walkthrough Energy and Environmental Economics, Inc. April 8, 2005.
Regional Technical Forum Future Funding Discussion March 19, 2014 RTF PAC Presentation.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
Government’s Evolving Role in Resource Planning and Environmental Protection Arthur H. Rosenfeld, Commissioner California Energy Commission April 19, 2002.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
CITY OF LEOMINSTER. Customer Charge The cost of providing customer related service such as metering, meter reading and billing. These fixed costs are.
Cost-Effectiveness Analysis of BGE’s DSM Programs Marshall Keneipp, PE Summit Blue Consulting, LLC Prepared for: Energy Efficiency and Conservation Stakeholders.
CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016 Brian Horii, Senior Partner Snuller Price, Senior Partner Zach Ming, Consultant Kiran Chawla,
Advanced Meter School August 18-20,2015 Time of Use and Load Profile Jeremiah Swann.
EE379K/EE394V Smart Grids: Smart Grid, A Contrarian View
Agenda » General Methodology » Approaches to Key Issues
SMECO Demand Response filing
Technical Advisory Group Meeting on BGE’s Conservation Program
Narragansett Electric Rate Classes
Mike Jaske California Energy Commission
Preliminary Electricity Rate and Time of Use Rate Scenarios
Chris Kavalec Demand Analysis Office
Ex Ante Review Overview
2500 R Midtown Sacramento Municipal Utility District
Avoided Cost and E3 Calculator Update Workshop
Anna Garcia Air Innovations Conference August 2004
Demand Side Management Potential Study Methodology Overview
Presentation transcript:

1 CPUC DEER, Cost-Effectiveness Calculators and Avoided Costs Peter Lai, Energy Division Jeff Hirsch, JJ Hirsch & Associates June 24, 2009

2 What is DEER, and how it’s being used

3 What is DEER? Database for Energy Efficient Resources (DEER) Estimates of “typical” or “expected” impacts that would result from EE measures installations Includes residential and non- residential energy efficient measures Can be used for forecasting, planning, and analyzing EE activities

4 What is DEER? (CONT.) Contains mostly measures for buildings; new construction and retrofit –DEER Building types 3 residential (SFR, MFR, DwMH) 23 commercial (Edu – Pri, Sec, RelocCL, CC, UC; Grocery; health - Hosp, NHome; Log - Hot/Mot; Manuf – Light/Bio; Off – Lg/Sm; Rest – Fast/SD; Retail – Lg MF/SF, Sm; Storage Cond/Uncond/Refrig) –Vintage – several old and new –Location – 16 CEC T24 climates

5 What is DEER? (CONT.) Measures (buildings examples) –Lighting (CFL, Linear Fl., MH, Exit) –HVAC High Eff. DX a/c and hp (split/packaged) and furnaces Chillers, Boilers, ChW/HW dist., Air dist Maintenance – refrig. Charge correction, duct sealing and insulation –Water Heating (Lg/Sm Storage, Instant) –Residential Appliances (Refrig, Washer, Dryer, Dish) –Envelope (Windows, Insul.)

6 What is DEER? (CONT.) Contains limited industrial and agricultural measures –planned for expansion

7 What is DEER? (CONT.) Contains measure parameters needed to perform cost- effectiveness analysis, including estimates of typical: –Electric and natural gas energy impacts (unit energy savings – kWh, kW, Therms per unit – and load shape – 8760 electric, monthly gas) –Attribution (net-to-gross – NTG – by delivery method, up/down/midstream, direct install, etc) –Measure full/remaining life (EUL/RUL) –Full and incremental cost (new/retrofit, location, up/down delivery)

8 Estimates based on… RASS Conditional demand analysis (CDA) of billing data (for calibrating residential baseline heat/cool energy use) Measurement studies (to establish measure performance parameters) Engineering calculations and simulation models (to project results into typical building types, vintages and locations)

9 How does M&V feed the DEER update? EM&V work can provide the data required to update DEER –Update parameters that determine energy usage Use profiles (operation schedules, thermostat settings), equipment field performance (actual rather than rated values of parameters), –Installation rates or quality Separate from gross savings “potential” –Attribution –Life

10 When is DEER adjusted? Baseline change –new Codes & Standards – Tile 24/20, EPAct, etc –Existing stock inventory shifts Measure performance change –improved quality or new data available New products/technology improvements –Windows, HVAC, equipment Usage patterns change Correct anomalies or errors

11 Time line of DEER updates Current version of DEER is the 2008 DEER mid-December release for IOUs’ EE Planning. Next update is scheduled for late 2010 for IOUs’ EE Planning.

12 Cost Effectiveness

13 Cost Effectiveness Background CPUC adopted Standard Practice Manual Total Resource Cost (TRC) test: –Measures the net costs of EE portfolio as a resource option based on the total costs of the portfolio, including both the participants' and the utility's costs. TRC ratio = TRC Benefits/TRC Costs, where –TRC Benefits = supply-side resource avoided or deferred IOU costs –TRC Costs = all non-freerider non-reimbursed costs incurred to install measures plus all costs incurred by the portfolio administrator Cost effectiveness from perspective of ratepayers and utility

14 Cost Effectiveness Calculation TRC COSTS Measure full or incremental non-reimbursed Total Costs =  Net-To-Gross Net of freeriders + Portfolio Costs All expenses Net-To-Gross Measure Avoided Costs TRC BENEFITS Measure UES Unit Annual Energy Savings kWh and Therms Total Benefits = Number of Installations   Measure Avoided Costs where = Measure Load Shapes 8760 electric & monthly gas  IOU Avoided Costs 8760 electric & monthly gas per IOU and CTZ quarterly EUL  Installations actually installed

15 E3 CE Calculator – TRC/PAC Input: Utility administrative and measure incentive costs Participants’ non-reimbursed or “gross” measure costs Measure UES, NTG, EUL/RUL data Output: Calculated costs and net benefits values TRC PAC (like TRC but excludes participants’ costs) Embedded: CPUC adopted avoided costs and emissions rates combined with typical measure electric and gas load shapes

16 CPUC Avoided Costs

17 Avoided Cost Background CPUC adopted avoided costs provide the methodology and data used to estimate the dollar benefit resulting from a change in energy use and demand supplied by each IOU –avoided IOU investments and expenses that result in reduced revenue requirements The current adopted avoided costs for use by EE programs were first adopted in 2004 (D ) and updated during the first half of 2006 (D ) –Update options are being considered for EE use

18 Electric Avoided Costs The electric AC values include: –Generation (CCGT O&M cost based) –Transmission & distribution (IOU T&D O&M costs) –Environmental cost components (NOx, PM10, CO2) Values are annual datasets of 8760 hours for each IOU, including 43 climate zone and sub- climate zone divisions across IOU service areas, spanning twenty three years

19 Gas Avoided Costs Gas avoided costs is the sum of: –the forecasted commodity price for natural gas –the avoided transmission and distribution costs –Environmental cost components (NOx, CO2) Values are annual datasets of 12 monthly values for each IOU, including residential and non-residential values, spanning twenty three years

20 Avoided Cost Methodology Dimensions Avoided CostTime DimensionArea Dimension Avoided Electricity Generation HourlyUtility specific Avoided Electric Transmission and Distribution Hourly Utility, planning area and climate zone specific Avoided Natural Gas Procurement MonthlyUtility specific Avoided Natural Gas Transportation and Delivery MonthlyUtility specific Environmental Externality Adders for Electric & Gas Annual value, applied by hour according to implied heat rate System-wide (uniform across state) Reliability AdderAnnual value System-wide (uniform across state) Price Elasticity of Demand Adder TOU period (on-vs. off-peak) by month System-wide (uniform across state)

21 Electric Period 1 ( ) Platt’s / NYMEX Period 2 Transition Period 3 ( ) LRMC 1 + Ancillary Services (A/S) Period 1 ( ) NYMEX Period 2 Transition Period 3 ( ) Long-run Forecast 1 + LUAF + Compression Commodity Natural Gas Commodity Market Multiplier 1 + Energy Losses T&D Costs  (1 + Peak Losses ) Environment  (1+ Energy Losses) T&D Costs    “NYMEX” = “New York Mercantile Exchange” “LRMC “ = “Long-run marginal cost” all-in cost of combined cycle gas turbine (CCGT) “LUAF “ = “Loss and unaccounted for” Formulation of Avoided Costs Emissions Costs

22 Electric Cost Components Generation energy and capacity cost CCGT O&M with a historical hourly price shape multiplier x Ancillary Services (CASIO costs) multiplier x Market Elasticity multiplier (load change impact on market clearing prices) x Losses (end user to bulk power grid hub) Transmission and distribution capacity cost T&D capacity avoidable delivery costs, allocation shape by climate region, peak hour losses multiplier Emissions cost NOX, PM10, CO2; depends on generation heat rate and losses (and thus also measure load shape)

23 Appropriate Measures Reduce load or produce energy for hundreds of hours per year in a predictable pattern, because reductions over hundreds of hours reduce the importance of knowing the exact shape of the electric generation market hourly shape during just the peak hours Relatively small (such that they can be installed behind the customer meter), because the smaller the resource relative to the local T&D system, the less the utility needs to plan for the contingency case of the resource failing to provide reductions Expected to be installed in large numbers, because the more resources that are installed, the more one can rely upon the expected level of reductions.

24 Putting the Components Together - Electric:

25 Putting the Components Together - Gas:

26 Currently… D (OP 10 and Attachment 3) adopted electric and gas avoided cost for use in planning and evaluation of the energy efficiency IOU portfolios. These interim values were not adopted for other uses or future EE cycles. April 21, 2008 AC/ALJ Ruling directed IOUs to use in the application: –the updated 2007 generation cost (CCGT) values as adopted in Resolution E-4118 (the updated 2007 Renewable Portfolio Standard [RPS] market price referent [MPR] values)

27 More info available at… Spreadsheets and reports can be downloaded from the E3 website:

28 Questions