Fairfax County Public Schools Energy Management VEPGA 7/11/08 Kirk Hiles, PE - Energy Engineer

Slides:



Advertisements
Similar presentations
STEPS TO SUCCESS WITH FCIP Ryan Freed Kansas Energy Office.
Advertisements

Federal Reserve Bank of Boston Case Study
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Sustainability Advocates Program New Advocates Training April 7, 2009 ENERGY AT NYU.
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
AQ2511B0 Boiler Reset Panel – for Whole House Heating Control – Immediate Retrofit Opportunity !
Future Plans. Overview Biomass Update Climate Commitment Update ECM ESPC Dashboard Deferred Maintenance Supply Side Conservation.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Fall 2009 Workshop Level 1 Energy Audits - Energy Use Analysis - - Walk Through Analysis - Mr. Matt O’Brien, AIA, LEED AP November 17, 2009.
The York County School Division Geothermal Heating and Air Conditioning: Is it Worth the Cost?
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
Leading By Example towards a Clean Energy Economy and Sustainable Natural Environment Signed by Governor Markell on February 17, 2010.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES DCEO Energy & Recycling Office DCEO Trade Ally Events | December, 2014.
Franklin County Technical School Performance Contract Project.
© 2007 Control4. Smart System Controller HC-300 – Linux-based central brain for the home Monitors and manages energy use of the smart home – Lighting.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
Local Government Case Study – Fairfax County Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) July 11, 2008.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES Kate Tomford | DCEO Energy & Recycling Office DCEO Trade Ally Trade Show |
Energy Management 101 Lance Stewart Facilities Maintenance Manager/Energy Manager City of Charlottesville, Virginia.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Madeira’s path through Energy Conservation and a Power Purchase Agreement Making Solar Pay Presented at: OSBA Capital Conference November 8, 2010.
1 Progress Toward Sustainability at Williams College.
1 Progress Toward Sustainability at Williams College.
Green Schools How to Save Money and Improve the Learning Environment Power Point at
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
WSU GOES GREEN Early signatory to American College and University Presidents Climate Commitment (ACUPCC) –Goal to reach climate neutrality by 2050 Recently.
Name of Building(s) or Project Speaker(s) Organization(s)
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Meeting the 10% Conservation Goal Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) April 11, 2008.
Energy Conservation Initiatives Joan Kowal Energy Manager, UMCP May 1, 2008.
Lighting systems HVAC systems Lighting Equipment HVAC Equipment Miscellaneous loads Envelope Energy Conservation Measures (ECMs)
Does Your Building Need an Upgrade?. The common signs that your building would benefit from a mechanical/control upgrade.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Energy and the Environment The Role of CERT at NC A&T Dr. H. Singh, Professor and Director Robert Powell, Asst. Professor and Asst. Director Center for.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Nicholas J. Hennessy, Ph.D Sustainability Coordinator Bowling Green State University Energy Conservation Measures: It Takes a Community.
Why should we save energy? Americans now spend over $700 billion on energy Americans now spend over $700 billion on energy Energy demand is expected to.
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
Kendal Energy Policy Plan Community strives to: Carbon footprint reduction Promote the use of renewable resources Pursue other measures that can enhance.
A collection of short stories Energy Savings Performance Contracting.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Energy Management At Home & School. Saving Energy (K-1) Building Buddies (2-3) Monitoring & Mentoring (4-6) Learning & Conserving (7-12)
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Energy Conservation Building Upgrades Alma School District.
Charlie Conner, Project Manager Performance Contract Energy Conservation Measures September 30, 2013.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
1 Town of Dedham Energy Saving Performance Contracting.
Association of Energy Engineers Randy Haines, CEM, CLEP, CMVP Energy Manager, Jefferson April 20, 2016.
McHenry County: A Decade of Sustainability. Background In 2004, McHenry County recognized a need to evaluate and improve the following inefficient facilities.
Energy Conservation at Dominion George Washington Regional Commission Green Government Commission January 28, 2009 Harold Crowder Program Manager Harold.
Robert Greenwald, P.Eng, MBA February 26, 2004
January 12, 2017.
Sean Weber Energy Engineer
2017 Commercial Energy Efficiency Program
The most exciting DDC control to be introduced in the last 30 years.
Exploring Energy Management
Exploring Energy Management
County of Kane Facility Efficiency Improvements.
Presentation transcript:

Fairfax County Public Schools Energy Management VEPGA 7/11/08 Kirk Hiles, PE - Energy Engineer Tom Reinsel, PE CEM Coordinator, Energy Management

Fairfax County population – 1,041,200 About 1 out of 7 Virginians live in Fairfax County 12 th largest school district in USA 164,843 students 22,234 employees 236 Schools and Centers 25 Million s.f. of buildings Fairfax County Public Schools

Utility Budget FY08 Electricity Budget $28.7 million Electricity Budget $28.7 million Gas/oil $11.4 million Gas/oil $11.4 million $40.1 million - total electric and gas budget

Energy Management Section Coordinator Coordinator 2 Energy Management System Specialist 2 Energy Management System Specialist 1 Shop Supervisor 1 Shop Supervisor 3 EMS Technicians 3 EMS Technicians 2 Mechanical/Controls Engineers 2 Mechanical/Controls Engineers 1 Inspector 1 Inspector 10 positions total

Control Systems Andover 102 Automated Logic 19 American Automatrix 16 Carrier 12 Delta 4 Honeywell 1 Invensys/BarberColmen/Seibe 33 Novar 1 Powers 7 Siemens 1 Trane 13 Tridium 32 (most integrated with other systems) Proliphix web thermostats -307 in modulars +/- 242 systems

Controls Replacements 23 DDC controls projects are in some stage of construction from planning/design to final punch out/warranty. Replacement done through: –Design and Construction new or renovated buildings –Infrastructure Engineering –Replacement –Energy Management – upgrades/replacements/modifications –ESCO – New or replacements

Energy Performance Contract/ ESCO 106 Buildings 10,453,683 Square Feet $19,313,572 investment $2,470,448 estimated annual savings 7.8 year simple payback Preliminary work/feasibility/RFP began 2001 Construction started 1/ Completion August 2006 Contract is “turn key” design build. FCPS dedicated no full time project manager. Part of coordinator time plus 1-1/2 inspectors. ESCO provides design.auditing engineers and project management resources. Up to 4 full time PMs at times. Most work occurs and is managed at night.

T-12 to T-8 T-12 to T-8 MH to T-5 in gyms MH to T-5 in gyms Incandescent to compact fluorescent Incandescent to compact fluorescent All new LED exit signs – no conversion kits All new LED exit signs – no conversion kits Occupancy sensors Occupancy sensors No de-lamping or reducing light output! No de-lamping or reducing light output! Watch product selection carefully… Watch product selection carefully… Energy Performance Contract/ ESCO

Other Projects in Contract: Window upgrades Window upgrades Tridium Integration with legacy EMS Tridium Integration with legacy EMS EMS installs and replacements EMS installs and replacements Automated Meter Reading Automated Meter Reading Boiler Tune-ups Boiler Tune-ups Pneumatic Tune ups Pneumatic Tune ups Boiler Conversions (electric to gas) Boiler Conversions (electric to gas) Trailer Controls - Bard controllers Trailer Controls - Bard controllers Chiller monitoring (Carrier) Chiller monitoring (Carrier) Energy Performance Contract/ ESCO

Other Stuff Energy Watchdog for bill tracking Energy Watchdog for bill tracking Energy Management Web Portal Energy Management Web Portal EKA automated meter reading upgrade to server EKA automated meter reading upgrade to server US EPA Energy Star Portfolio/ US EPA Energy Star Portfolio/ SchoolDude/FSDirect scheduler SchoolDude/FSDirect scheduler Modular building web base thermostat upgrade Modular building web base thermostat upgrade Training program for HVAC and Operating Engineers Training program for HVAC and Operating Engineers Reverse auction for gas via Washington Council of Governments COG Reverse auction for gas via Washington Council of Governments COG Migration to “web based” 632 EMS devices with IP address - had one device in Migration to “web based” 632 EMS devices with IP address - had one device in Migration to graphical/web interfaces graphical systems – had one in 2003 Migration to graphical/web interfaces graphical systems – had one in 2003

New stuff in the pipeline…. New Construction is being designed to Collaborative for High Performance Schools (CHPS) standards. Emphasizes energy use (lighting and HVAC) more than LEED ( NOT doing LEED) New Construction is being designed to Collaborative for High Performance Schools (CHPS) standards. Emphasizes energy use (lighting and HVAC) more than LEED ( NOT doing LEED) Geothermal heat pumps - evaluating now – expect to start using them soon. Geothermal heat pumps - evaluating now – expect to start using them soon. PJM Demand response program pilot in 5 schools PJM Demand response program pilot in 5 schools Switching 2 schools from VEPGA 130 to 132 schedule as pilot. Switching 2 schools from VEPGA 130 to 132 schedule as pilot. Formal internal energy audits of schools by engineer with improvement tracking. Formal internal energy audits of schools by engineer with improvement tracking.

Fairfax County Public Schools Energy Management Kirk Hiles, PE - Energy Engineer Tom Reinsel, PE CEM Coordinator, Energy Management