Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.

Slides:



Advertisements
Similar presentations
© 2005, Itron Inc. Residential Market Share Tracking Study Rachel Harcharik Itron, Inc Richard Pulliam, Project Manager Southern California Edison.
Advertisements

Non-Residential Program Impact Evaluation Methods Gary Cullen, Summit Blue Consulting (360)
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
New Paradigms for Measuring Savings
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Estimating Key Parameters for the Retail Plug-Load Portfolio (RPP) Program: Recommended Methodological Approaches EM&V, Residential Programs, Products.
Experience you can trust Statewide Multifamily Rebate Program: Findings & Recommendations CALMAC Meeting Pacific Energy Center October 17, 2007.
RTF Lighting Standard Protocol Review of Hours of Operations, Controls Savings, and Variation.
D EEMED M EASURE U PDATES June 1, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
Statewide Measure Cost Update Overview & Discussion.
Assessing the Potential of Energy Efficiency Programmes in South Africa by Modelling Selected Policy Interventions Alison Hughes Energy Research Centre,
UAE Energy and Water Efficiency and Labeling Programs
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
APPLYING ENERGY MANAGEMENT STANDARDS AT HIGHER SCHOOL EDUCATIONAL ESTABLISHMENTS EUGENE GASHO, INSTITUTE FOR ENERGY EFFICIENCY PROBLEMS, NATIONAL RESEARCH.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
SDG&E Small Business Energy Efficiency (SBEE) SoCal Gas Non-Residential Financial Incentives Program (NRFIP) Evaluation Results Steve Grover ECONorthwest.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Northwest Ductless Heat Pump Pilot Project Impact & Process Evaluation: Billing Analysis Ecotope, Inc. February.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Electric / Gas / Water 2004/2005 Single Family Energy Efficiency Rebate Program Evaluation * Findings and Recommendations * October CALMAC Meeting October.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Results from the California Energy Efficiency Potential Study – Existing Residential and Commercial Jean Shelton July 27, 2006 San Francisco, California.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
Bill Savings Public Workshop Costs and Bill Saving in the Low Income Energy Efficiency Programs for 2003 to 2005 April 21, :00 AM to Noon 77 Beale.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
1Managed by UT-Battelle for the Department of Energy David Carroll APPRISE National WAP Evaluation: Savings and Opportunities for Baseload Electric.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
1 What is DEER?  A collection of data for Residential and Non-Residential energy efficiency measures.  It provides a common set of: Ex ante Savings values:
Residential Lighting Study Proposal June 2012 PSE.
Bill Savings Costs and Bill Saving in the Low Income Energy Efficiency Programs for 2002 to 2004 Bill Savings Public Workshop April 15, San Diego.
Variable Speed Heat Pumps Provisional UES Proposal Presentation to the Regional Technical Forum September 18, 2012 Presentation by Kacie Bedney, Bonneville.
Electric / Gas / Water MAESTRO Evaluation Showcase July 26-27, 2006 Project Manager: Pierre Landry, SCE Lead Consultants: Mike Rufo, Itron; Keith Rothenburg,
11/23/ Residential Sector Load Forecast Impacts of Codes, Standards and Market Changes Preliminary Estimates June 19, 2002.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Today’s lesson will focus on Energy Efficiency and Conservation. So, what do these terms mean? Renewable Energy 2.
Guidelines Revisions Defining What RTF Means by “Savings” December 17,
Regional Technical Forum Future Funding Discussion March 19, 2014 RTF PAC Presentation.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
2014 Enhanced RCP Jennifer Light & Lakin Garth Regional Technical Forum December 8, 2015.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: John Cavalli, Itron Beatrice Mayo, PG&E July 27, Express Efficiency Program.
D EEMED M EASURE U PDATES May 3, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
RTF Management Updates Jennifer Light Regional Technical Forum January 21, 2016.
1 Summary of Reviews: Workpapers Approved by the California Technical Forum Part 2 Meeting: California Technical Forum January 28, 2016 Jeff Hirsch/Kevin.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
Energy Conservation. Payback Period The amount of time a consumer must use a system before beginning to benefit from the energy savings because of the.
Energy Efficiency.
Exterior LED Area Lights
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Seventh Plan Update RETAC September 23, Final Plan Update Review of Past Program Results Emerging Tech & New Measures Finance, Admin Cost, Line.
What Retailers Need to Know About New Light Bulb Legislation November 2011.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
RTF’s Engagement with Research Jennifer Light RTF Policy Advisory Committee February 19, 2016.
Formation of a Market Analysis Subcommittee Charlie Grist and Jennifer Light RTF Policy Advisory Committee February 19, 2016.
© 2007, Itron Inc. Statistically Adjusted End-Use Model Overview & Thoughts about Incorporating DSM into a Forecast May 4, 2009 Frank A. Monforte, Ph.D.
Find your comfort zone Upgrade your heating or cooling system and you can enjoy more than year-round comfort in your home. You’ll also enjoy saving money.
Potomac Edison Preliminary Energy Efficiency and Conservation Programs
Energy savings calculation (ESC) for lighting
Reducing Energy Use Lesson 15.
Market Pricing Issues: Update
Presentation transcript:

Planning for Updates and Linkages to EM&V CALMAC February 17, 2004

Planning for Updates and Linkages to EM&V To establish clear ties between the underlying engineering estimates, models, etc. and EM&V studies and market assessment studies. ’04-’05 DEER Scope includes: –Task 3: Establish DEER Periodic Update Plan –Task 9: ID and Develop DEER Linkages to EM&V Objectives –ID and prioritize DEER-related EM&V needs Measure-specific parameters –Improve coordination between DEER & EM&V Short-term: ’04 -’05 studies Mid-term: ’06 -’08 EM&V and R&A plans –Develop plan for periodic DEER updates

DEER Task 3/Task 9 Approach Contractors - Itron & Quantum Consulting Utilize a Technical Advisory Group –DEER PAC with expansions –Add 1 to 2 technical staff per org, plus other experts –Technical input and review of deliverables Interviews with TAG Review recent EM&V and ’04 -’05 plans ID key measure inputs, assumptions, methods ID DEER-related EM&V needs Prioritize DEER-related EM&V needs

DEER Task 3/Task 9 Deliverables and Schedule Task 3 –Draft and Final DEER Update Plans Task 9 –Draft and Final Working Paper Input assumptions and methodologies Ratings of relative importance Links to current/recent EM&V Priorities for future EM&V

Recent DEER-Related EM&V Issues Raised Input requested for this CALMAC meeting from DEER PAC –Focused on DEER-related EM&V needs that could possibly be considered in ’04-’05 studies –Caveat: Not yet an edited, systematic, or prioritized list

Input to Date General HVAC Programmable Thermostats CFLs Pool Pumps Other

General Needs Measured data that is disaggregated below a program or even measure realization rate –DEER needs measured data at the measure parameter level –For example, hours of use, base case and measure efficiency levels, delta efficiency levels, in service factors, behavior effects, etc. Segment-based data –To reduce reliance on averages that imbed population assumptions, or –To improve the accuracy of averages Load shape data (8760?, calibration, by end use, by measure)

HVAC Issues Confirm the operating hours for rooftop units. Recent work shows high annual operating hours whereas the DEER numbers are lower Field data on performance of 13 SEER base case and 14+ SEER units –Determine what real-world factors influence actual SEER vs. the EER performance of HVAC units –Determine if the DEER modeled HVAC units are representative of units seen in the field Determine room A/C units hours of operation

Programmable Thermostat Issues Determine if changes in customer’s use of thermostats over the last two years impacted energy consumption Determine the incremental effect on savings from moving from programmable to Energy Star Programmable Determine what level of field monitored data and analysis can be used to arrive at reliable ex post savings and how that data collection and analysis should be implemented (heating versus cooling) Assess whether revised DEER method of modeling across a wide range of RASS-based thermostat behaviors is accurate

CFL Issues Estimate in-service rates Estimate retention and post-CFL replacement decisions –When CFLs replaced by incandescents, ascertain why Determine if occupants consider the light level to be adequate compared to what was replaced Ascertain base case wattages by CFL Assess customer knowledge. Do they use package labeling to make their decisions, and do they consider lumens when determining the replacement bulb? Determine energy savings from dimmable CFLs Determine how many customers replaced CFLs with incandescent bulbs Determine indoor hours of operation by control type Determine outdoor hours of operation by control type

Pool Pump Issues Determine hours of operation for one speed versus two speed pool pumps Estimate base and replacement wattages (one speed versus two speed) Determine if customers who installed one speed pool pumps reduced their average hours of operation as a result of participating in the program

Other Issues Industrial motors – cumulative impact of multiple rewinds C&I lighting – hours of operation by measure, biz type, and customer size CFL retention/re-installation Clothes washers & Dish washers – water heating fuel, usage levels, motor versus water heating savings, dryer savings (CW only), overall ex post savings. Base efficiency levels for early replacement measures Measured data for Large C&I SPC calculator assumptions

Next Steps & Schedule Form TAG Conduct TAG Interviews Develop Prioritization Framework Review SW ’02-’03 EM&V Review ’04 -’05 EM&V Plans Develop draft issues & priorities Review with TAG Review with CALMAC