SERVICING EVAPORATIVE

Slides:



Advertisements
Similar presentations
350, 350XL 1¼ - 2. Modification Overview Production of the 1¼ began in 2004 and is current. Production of the 1¼ began in 2004 and is current.
Advertisements

Sectional Assembly and Installation
CARTRIDGE SEAL INSTALLATION. CHECK PUMP SHAFT FOR BURRS CHECK GLAND BOSS FOR NICKS LUBRICATE SECONDARY SEALS SLIDE SEAL ONTO PUMP SHAFT ASSEMBLE PUMP.
Motor number located on the clutch housing.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Troubleshooting Guide. Table of Contents 2 Shower Filter 3 Leak Between Top Housing & Filter4 Leak Between Swivel Collar & Housing5 Leak at Top of Swivel.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Installing a double Dreamscreen. Check measurement Left.
Waukesha Cherry-Burrell
Installation. Indoor Unit Installation Typical Installation.
Rework Procedure for Wash Motor Pulley Change Model : Rosa & Rosa Plus Part Details & Tools required Sr NoPart DescriptionQtyTool used to replace old artworks.
Series I Pump and Prep Pump Prior to removing the head, rotate the flag on the top of the motor so the piston is fully retracted. Remove thumb nuts.
Selecting Electric Motors Electric Motors Part 1.
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
MyLock 644D Service Seminar.
Leg Assembly A step-by step guide to the disassembly and service of a HUBO leg.
Memory Craft Feed Dog Drop Step Motor Adjustments.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Motorized Tongue Jack Owners Manual Model SAFETY WARNINGS * Read, understand and follow all instructions before installing and/or using product.
Section 4: Electric Motors
Marubot Football League Service Manual.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Installation. Indoor Unit Installation Typical Installation.
Charging System Service
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Hydronic Mechanical Controls
UNDERHOOD MAINTENANCE Drive Belts. DRIVE BELTS Two types of Belts are used Two types of Belts are used V-belts because they are shaped like a V. V-belts.
Memory Craft Service Manual.
Installation. Indoor Unit Installation Typical Installation.
UNIT 18: APPLICATIONS OF MOTORS
5 Air-Conditioning Compressors and Service.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
© 2012 Delmar, Cengage Learning Manual Transmission Diagnosis and Repair Chapter 72.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Why Maintenance Tasks are Important Produced by Joe Marchese.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
TROUBLESHOOTING ELECTRIC MOTORS
Build A Motor You must follow the directions step-by-step!
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Temperature Test Allows monitoring of temperature changes.
Shaft Replacement Standard Operating Procedure
Selecting Electric Motors
PostBase Automatic Feeder Component Removal Service Training
Assembly Instructions:
PVT.
Bilge Pump Service Project Model Service Kit
826YD 21/2”-10”.
Servicing the Steering System
T400 Motor Replacement.
How to Change a Flat Tire
TROUBLESHOOTING ELECTRIC MOTORS
HYBRID COOKTOP.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
C400, C400N, C400Z 21/2”-10”.
450DA 4”-10”.
Beginner Stander Presentation
Presentation transcript:

SERVICING EVAPORATIVE COOLERS

Sleeve Bearing PMI uses a sintered bronze bearing on the blower assembly. The bronze bearing is surrounded by a permawick felt that holds the oil. The 20 or 30 weight non detergent oil then permeates thru the bearing’s microscopic pores onto the blower shaft. Never use light oils (Zoom oil) for bearings. Light oils act as a solvent and washes out the heavier lubricant. Permawick Felt

Replacing Blower Wheel Assembly When replacing blower wheel assembly on installed coolers that have the ductwork installed, it will require that the complete blower assembly be removed from the cooler. Remove (4) ¼” -20 x1/2 bolts from front flange (side discharge units) or duct bottom flange (down discharge units). Remove the bolts from blower support brackets. Lift blower assembly from flanges. Remove cutoff baffle from assembly. Loosen blower wheel set screws. Pull pulley and shaft from blower wheel & remove wheel from the housing assembly.

Replacing Blower Wheel Assembly Insert replacement blower wheel (Make sure the of direction of vanes curve towards duct opening). Insert shaft, add leather washer after inserting shaft thru bearing assembly. Insert shaft thru both blower wheel hubs, add leather washer and insert shaft thru bearing. (washer goes between wheel hub & bearing.) Leave 1 7/8 ” of shaft extended beyond bearing and then tighten set screw on blower wheel hub while squeezing blower wheel hub against leather washer and bearing.

Replacing Blower Wheel Assembly On opposite of pulley side, pull blower wheel hub and leather washer against bearing, then tighten set screw. Returning to the pulley side, assemble blower pulley flush with the end of the shaft. Reattach cut-off baffle to blower assembly. Install blower assembly to duct flanges, replace bolts Fasten blower support brackets

Replacing Aspen Pads Lay pad frame on flat surface with aspen pad up. Grab the side flange middle and pull outward to expose wire retainer, grab opposite side flange and pull retainer wire outward. Grab retainer wire at bottom of pad frame and pull wire outward. Remove wire retainer assembly from top of pad frame. Remove aspen pad from pad frame.

Replacing Aspen Pads con’t. Lay new aspen pad on pad frame, start at top of pad frame, making sure the aspen pad is not tucked behind water trough. It must be just above water trough on blower side. Adjust aspen pad to fill the frame, push aspen to all outer edges, Do Not leave any voids. Insert pad retainer to top trough edge first, then insert bottom wires, and then each side edge. Pre-wet pad frames before installing or run pump only to help aspen to wet out completely.

Cooler Motor Installation Install motor to motor cradle . Install motor so that the vent holes are in the downward position. This allows any water to drip from the motor case. Align motor sheave (variable pulley ) with blower pulley. Pre-adjust variable sheave to 4 turns open. To achieve maximum output of cooler and set sheave to nameplate amps, make sure exhaust for the cooler is set to 2 square ft. per 1000 cfm. If the motor amperage is below nameplate amps readjust sheave inward until nameplate amps is achieved.

Cooler Motor Installation Excessive belt tension will add load to motor and will cause premature damage to motor and blower bearings. For preseason start up, Cycle motor about 5 times (on and off ) without belt installed. This prevents start winding failures by self lubricating the horizontal shaft that the centrifugal switch slides on. New evaporative motors have permanent lubricated bearings. Older motors had bronze bearings which required oiling. Excessive belt tension will cause motor to overload. All residential motors have thermal overload protection. Frequent overload will cause motor to smoke and then it’s damaged. If motor fails to start and is humming and it started by turning the belt, the motor start winding is gone.

Servicing Pump Aspen fibers and calcium deposits can cause affect pump performance. Remove pump from cooler. Remove plastic wire tie, slide notches thru slot on plastic tie wire. Remove plastic screening. Invert pump assembly. Pry off round cleanout disc. Inspect impeller and outlet. Remove any deposits.

Pro Cooler Thermostat Trouble Shooting Tips Check input voltage, Check L1 on relay and neutral terminals, Check 24 Volts DC at thermostat terminals C to R =24 Between C to H, C to L, C to P, C to D, you will read 24 VDC when thermostat is off. When motor, pump and drain pump is energized by thermostat, voltage is .2 or less at that terminal. Pro has 24 volt VDC thermostat control. With thermostat wires removed from PC board terminals, motor and pump can be checked by jumping between C and H or L or P terminals.

Stand Pipe Assembly

Float Assembly

Thank you for your time and attention Thank you for your time and attention. If you have questions in the future, you can contact me at: Robert Ortega Phoenix Manufacturing Inc Warranty Manager 1-800-325-6952 robert_ortega@phxmfg.com