1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

NET ZERO STUDY ON A COMMUNITY COLLEGE By: Amanda OConnell Doenges.
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Program Overview February 25, Program Summary Approximately $14M in incentives per year Cap for Large Customers: $300,000 per year Prescriptive.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Energy Efficiency & Conservation for Businesses and Homes Pacific Gas & Electric Company Presented By: Joe Segura Energy Solutions and Service April 17.
AQ2511B0 Boiler Reset Panel – for Whole House Heating Control – Immediate Retrofit Opportunity !
1 LIGHTING. 2 LIGHTING 30% better-than-code is incredibly easy for lighting – the standards are lagging the industry revolution.
Refrigeration Energy Solutions February 24, 2010.
I can see the light! Energy Efficient Lighting. Energy webinar series.
Saving Energy and Reducing Costs in RI Hotels & Restaurants February 24, 2010.
PNM Energy Efficiency Business Rebates for Facility Managers Retrofit Rebate Opportunities July 13, 2010.
Commercial Energy Efficiency Program IFMA Luncheon July 16, 2014.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES DCEO Energy & Recycling Office DCEO Trade Ally Events | December, 2014.
Franklin County Technical School Performance Contract Project.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES DCEO Energy & Recycling Office DCEO Trade Ally Events | December, 2014.
Northwest Power and Conservation Council Review of Draft Commercial Sector Conservation Assessment February 3, 2009.
Morofsky1 Low-energy Building Design, Economics and the Role of Energy Storage Canadian possibilities based on the Model National Energy Code for Buildings.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES Kate Tomford | DCEO Energy & Recycling Office DCEO Trade Ally Trade Show |
1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
1 Progress Toward Sustainability at Williams College.
GREATER LAWRENCE SANITARY DISTRICT ENERGY EFFICIENCY PROGRAM.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
PUBLIC SECTOR STANDARD & CUSTOM REBATE GUIDELINES Kate Tomford | DCEO Energy & Recycling Office DCEO Trade Ally Rally |
Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.
Who Says Energy Efficiency Can’t be Sexy? About Us Energy + Environment  Since 1999  Decades of experience in energy efficiency  We create jobs, lower.
Scott Cooper | May 20, 2014 Built Smart and New Construction.
Northwest Power and Conservation Council Draft 6 th Plan’s Assessment of Regional Conservation Potential Conservation Resource Cost and Availability April.
Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Policy: Zero Net Energy Homes in 2020 Martha Brook, P.E. High Performance Buildings.
Green Building Demonstration Project Adam Saling City of San Diego.
LOW COST & NO COST ENERGY REDUCTION STRATEGIES FOR HOUSES OF WORSHIP Lou Ann Wright, LEED AP Roman Catholic Diocese of Pittsburgh May 2014.
TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
New Mexico State University EFFICIENT RESIDENTIAL ENERYGY Fahzy Cooperative Extension Service ______ County.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Savings Through Efficient Products STEP. FACTS GOALS Reduce energy use ABOUT Modified “direct install” PROCESS Free & simple process: Free energy assessment.
Results from the California Energy Efficiency Potential Study – Existing Residential and Commercial Jean Shelton July 27, 2006 San Francisco, California.
Incentives talk… Conservation Incentives Advisor Rob Detta Colli (416)
Name of Building(s) or Project Speaker(s) Organization(s)
Vanderbilt Energy: 15,000 20,000 25,000 30,000 35,000 40,000 45,000 18,708,842 Kilowatt Hours.
Lighting systems HVAC systems Lighting Equipment HVAC Equipment Miscellaneous loads Envelope Energy Conservation Measures (ECMs)
Alternative Financing for Energy Efficiency Eddy Trevino Matt Golden – – Investor Confidence Project Josh Briggs – QECBs Michael Flores – High Performance.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 9: Modeling heating and cooling systems.
Overview for Local Energy Committees February 10, 2016.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Energy Conservation Building Upgrades Alma School District.
Draft SMECO EmPOWER Plans April 15, 2011.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
Draft SMECO EmPOWER Plans April 15, 2011.
SHELTON SCHOOLS OPERATIONS. Energy and Conservation Grant Measures Look at the three main areas of impact Replace HVAC units and Controls at SHS Better.
Madison Elementary School District
The Energy Efficiency and Solar Nexus:
January 12, 2017.
2017 Commercial Energy Efficiency Program
Bob McGreevy, PE CEM President EES
pplelectric.com/businessrebates
2018 Retro-Commissioning (RCx) Program
County of Kane Facility Efficiency Improvements.
Presentation transcript:

1

2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model the building due to costs constraints What they did… New 39,115 recreation center ▪Increased roof and wall R-values ▪Reduce lighting power density by almost.3 W/sf ▪High Efficiency GSHP Park District Building TypeRecreation Center Energy MeasuresLighting, HVAC, envelope, DHW Annual Energy Savings$10,643 Incremental Cost$57,152 Total DCEO Incentives$77,467 Simple Payback5.3 years

3 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Incentive for 18% beyond code What they did… 147,867 sf addition and renovation ▪Improved lighting ▪Improved envelope ▪High Efficiency HVAC High School Building TypeK-12 Energy MeasuresLighting, HVAC, envelope Annual Energy Savings$9,061 Incremental Cost$34,137 Total DCEO Incentives$110,336 Simple Payback3.7 years

TENNIS COURTS/POOL Indoor Tennis and Pool Building TypePark District Energy MeasuresLighting, HVAC, DHW, plug loads Annual Energy Savings$27,941 Total DCEO Incentives$60,000 Total Project Cost$55,000 (after incentives) Payback1.9 years Recommended… Lighting upgrade –MH to high bay –Exterior LEDs –Reduce linear wattage Install VSDs on pool pumps Vending misers Thermostat setbacks Recommended buy not included in savings… Install pool covers Pool dehumidification / heat recovery Daylighting controls Ozone laundry

5 MULTIPLE RETROFITS Civic Center Building TypeMunicipal Civic Center Energy MeasuresLighting, Occupancy Sensors, Boiler Pump Controls, Chiller Water Pump, Sequencing Total Project Cost$308,550 EECB Grant$283,054 Total DCEO Incentives$25,496 Final Project Cost$0 Annual Energy Savings$60,000 Payback0 years Funding… DCEO Illinois Energy Now Conservation Block Grant from American Recovery and Reinvestment Act Fully funded

ELEMENTARY SCHOOL Elementary School Building TypeK-5 School Energy MeasuresHVAC, lighting, windows, occ sensors, controls Annual Energy Savings$16,933 Total DCEO Incentives$29,800 Total Project Cost$138,801 Payback6.4 years What they did… Replaced existing boiler and chiller New windows Retrofit lighting Occupancy sensors Air sealing

ELEMENTARY SCHOOL What they did… New Geothermal New windows Retrofit lighting Occupancy sensors Air sealing (not completed yet) Elementary School Building TypeK-5 School Energy MeasuresHVAC, lighting, windows, occ sensors, controls Total Project Cost$618,501 Total DCEO Incentives$35,393 Final Project Cost$583,108 Annual Energy Savings$19,587 Payback29 years Why high payback was acceptable. Previously heated with boiler and unit ventilators Boiler needed to be replaced They wanted air conditioning Windows at end of life

ARENA Arena Building TypeRecreation Energy MeasuresLighting, hot water, VFDs, heat recovery, RCx Annual Energy Savings$106,132 Total DCEO Incentives$131,000 Total Project Cost$150,366 Payback1.4 years Recommended… Lighting –Metal halide to high bay –Bi-level lighting –Retrofit T12s LED exit signs High efficiency boiler VFD on water pumps and cooling tower Waste heat recover on ice refrigeration process Retro-commission

Illinois Energy Now |