1 PIE Needs and Relevant Facilities at Cadarache Coordinated and Presented by Alice Ying With contributions from J. Furlan, V. Massaut, Y. Poitevin, S.

Slides:



Advertisements
Similar presentations
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Advertisements

TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
FNSF Blanket Testing Mission and Strategy Summary of previous workshops 1 Conclusions Derived Primarily from Previous FNST Workshop, August 12-14, 2008.
Suggested US Plans and Strategy for ITER Test Blanket Mohamed Abdou Presented at APEX/TBM Meeting, UCLA, November 3-5, 2003.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
1 Brief Status of ITER TBM A High-Level Ad Hoc Group (AHG) met April 10-11, per request of the ITER Council. In that meeting, Parties intentions were stated,
For the benefit of business and people
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
1 Framework Programme 7 Guide for Applicants
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 Recent Progress in Helium-Cooled Ceramic Breeder (HCCB) Blanket Module R&D and Design Analysis Ying, Alice With contributions from M. Narula, H. Zhang,
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
HCCB TBM Mechanical Design R. Hunt, A. Ying, M. Abdou Fusion Science & Technology Center University of California Los Angeles May 11, 2006 Presented by.
KoM meeting 09 Oct 06 Kick-off-meeting of EFDA TW6-TSL-002 contracts , , , Oct 2006 Kick-off-meeting of EFDA TW6-TSL-002.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Managing deviations from the Design Target with the Safety Case IAEA GEOSAF II Plenary 2014.
Division Of Early Warning And Assessment MODULE 5: PEER REVIEW.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
A FSP is a Program designed to identify and control hazards in order to establish and maintain food safety. (Based on HACCP principles) 1 version 2 Dec.2009.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
PRODUCTION LOGISTICS Introduction Slovak University of Technology Faculty of Material Science and Technology in Trnava.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
Base Breeding Blanket and Testing Strategy In FNF Conclusions Derived from Previous FNST Workshop, August 12-14, 2008.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Development of tritium breeder monitoring for Lead-Lithium cooled ceramic breeder (LLCB) module of ITER presented V.K. Kapyshev CBBI-16 Portland, Oregon,
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Preparing the Phase 0 Proposal What in the world are the proposal reviewers looking for?
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
IEA IMPLEMENTING AGREEMENT ON NUCLEAR TECHNOLOGY OF FUSION REACTORS International Workshop on Subtask Neutronics Report on ENEA activity in 2004 Paola.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Expert Review of the Licensing Documentation of the Centralized Facility for Long-Term Storage of Disused Sealed Radiation Sources Oleksii Tokarevskyi.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Thermal-hydraulic analysis of unit cell for solid breeder TBM
US Participation in the
Introductory Remarks and Meeting Goals
News and brief overview of Beamline plans for the next few months
Improvement of Family definitions
DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
VLT Meeting, Washington DC, August 25, 2005
Mohamed A. Abdou Summary, Approach and Strategy (M. Abdou)
Dennis Harwig and Bill Mohr, EWI
Nuclear Analyses for two “Look-alike” HCPB Blanket Sub-modules for Testing in ITER Mahmoud Z Youssef UCLA Presented at ITER-TBM4 Meeting, UCLA, March 2-4,
University of California, San Diego
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

1 PIE Needs and Relevant Facilities at Cadarache Coordinated and Presented by Alice Ying With contributions from J. Furlan, V. Massaut, Y. Poitevin, S. Reyes, A. Tesini, M. Youssef, and WSG members TBWG-16 Nov Beijing, China

2 Assumptions Parties believe that the post-irradiation examination (PIE) of the test blanket module (TBM) is an important part of the testing program. It has been recommended that an Annex be included to the ITER Hot Cell for TBM PIE and be located close to the ITER HCB or near ITER. –The TBWG has highlighted that such an enterprise can be a collaborative effort between the parties and encouraged a prior agreement and official framework concerning the items of intellectual property to be established.

3 TBM PIE Scenarios (Revised) 1.TBM shipped back to the country of origin or partner party after testing in ITER 2.Specimen Preparation + PIE 3.Specimen Preparation Only (PIE done at the host country) 4.Specimen Preparation + limited PIE at ITER site (i.e., ceramic breeder pebble bed integrity)  Have not reached a recommended reference scenario to TBWG on TBWG 16  However, most WSG task leaders favor option 4 and/or option 2 Scenario

4 Is it practically feasible to transport the entire TBM back to the country of origin? Transfer to the country of origin: transportation provision will have to conform to the international transport regulations. Casks licensed to transport tritium (in bottles) exist for small specimens, at least, so that it seems to be possible either to extend their content to the tritiated spices (in a primary container ?) and to design a proper adapted cask.

5 Figure shows the neutronics model for the case of 20 cm of lead shielding within a 2 cm of steel The dose has been tallied in the first cm of air around the case, we have used the highest dose value in the air zone that is closer to the FW (left side of the figure) 20 cm lead 2 cm thick steel case DCLL TBM structures ONEDANT Transport Model for Dose Calculations  Due to the time constraint, Gamma ray transport calculations were performed only for the dominating radioactive element of Mn54 found in the ferritic steel (half life time= 1 year) Goal: to estimate thickness of steel and/or lead needed to reduce the cask surface does rate to 2 micro-Sv/h PbLi was drained out of the TBM before transportation. The model includes the W armor, the FS structures and the SiC layers.

6 Two shielding concepts investigated, one uses only a steel case of various thicknesses around the TBM Another case assumes a 2 cm thick steel container filled with lead shielding at different thicknesses In the case of steel, 40 cm are needed to reduce the dose below 2  Sv/hr (mass of container ~ 9 tonnes) In the second case Pb thickness of 20 cm would reduce the dose below the allowed limit (total mass of steel case and Pb shielding ~ 5 tonnes)

7 TBM Cooling may not be an issue after 1 day after shutdown (DCLL)

8 Issues Concerning TBM Transports Transfer of TBM parts towards other facilities should be submitted to constraints such as: use of casks approved to circulate on public road networks (even from ITER to Cadarache centre), specific TBM content (including Beryllium) included in the approved content of these casks, acceptance of possible tritium outgassing during transportation, capability of ITER to dock those casks.

9 Outline Relevant PIE Facilities at Cadarache PIE Needs –Review of Basic Operational Procedure/ Processes Involved in PIE –Route to Reference Scenario Definition Schedule Operational Procedure PIE Categories Criteria? –Burdens

10 Relevant Facilities at Cadarache: LECA-STAR This facility is dedicated to irradiated fission fuel studies. It offers a large panel of means and long experience related to preparation and examination of experimental devices. That is to say, roughly: –numerous hot cells, including large ones (up to 9 m x 3 m), –heavy loads handling (up to 60 t in the facility and 2 t in the hot cells), –adapted in-cell tools (fine visual inspection, cutting (fine & coarse), welding, scientific equipments for structural examination, …) –a team of experienced experts. A half-port TBM weighs ~ 2 t

11 Relevant Facilities at Cadarache: CHICADE This facility deals with chemical and characterization studies of nuclear wastes. It offers tools for destructive and non-destructive survey and for radiochemical analyses. Main basic equipments are various shielded containments, a hot cell (so-called ALCESTE: 7 m x 6 m) and usual means to operate (heavy loads handling, up to 15 t in the facility, depending of the zone). The facility, whose aim is different, has not well adapted means nor experience to deal with the requirements.  Can this facility be used to accommodate any unscheduled PIE? For example, can it be used as a temporary storage until ITER HC becomes available?

12 Facilities at Cadarache Summary LECA-STAR has capacity to handle, dismantle and sample large objects prior to performing experimental tasks. Structural examination equipments and know-how are available too but are dedicated to irradiated fission fuel. CHICADE offers hot surfaces and volumes but has no experimental means well- adapted to the requirements. LECA-STAR Facility Need to know the sample size of the large objects

13 Action Items TBWG should take actions to finalize a reference scenario (as well as an alternative if necessary) –Further study is scenario dependent, involving the concerned units’ staffs in Cadarache. WSG members to define “Coarse” cutting specifications/requirements: precision, complexity, etc. –So that ITER can, in future, try to take TBM requirements for a best compromise for a cutting machine. –Or a cutting technique specific for the TBM.

14 What is the most pressing issue? It should be noted that ITER site layout, including the nuclear buildings, will be finalized in 2006 so any TBM/PIE/HC relevant issue which may impact the layout (HC and any additional annex and relevant site services, in particular) should be addressed soon by the TBWG. Per message of Tesini to Ying dated Oct. 25, 2005  Related immediate issue/action: 1.Establish PIE reference scenario including flow path and associated operations 2.Recommend alternative option

15 Scenario A Per message of Tesini to Ying dated Oct. 25, 2005

16 If TBM’s transportation outside the ITER boundary can be an issue: –With regard to PIE, possible component flow path could be: a) TBM is removed from plug within the ITER HC, packaged in suitable shielded container (safety, Tritium, transport issues to be addressed) b) TBM is delivered to LECI-PELECI facility unless the on-site LECA- STAR can handle the TBM's (for which Jackie's memo quotes 2 ton max handling capacity). If possible (for size, availability) usage of the LECA-STAR facility appears preferable as it may help relax the TBM's transportation issue (within the same site) Concerning the heavy loads handling, just one point to avoid confusion: In the hot labs there are generally two families of heavy loads handling means: those used to handle the casks (outside the hot cells) able to lift several tens of tons (60 t in LECA-STAR), and those dedicated to handle things inside the hot cells (2 t in LECA-STAR). (if it is possible to assume that ITER site & Cadarache centre belong to the same site, avoiding transportation on the public roads, constraints should still remain, but they should be lighter on the cask's design and licensing).

17 Concern It should be noted that ITER site layout, including the nuclear buildings, will be finalized in 2006 so any TBM/PIE/HC relevant issue which may impact the layout (HC and any additional annex and relevant site services, in particular) should be addressed soon by the TBWG. Minimum Request to ITER HC: Regarding the capability of ITER HC to dock those casks Space required for packaging six irradiated half-port modules in suitable shielded containers (safety,Tritium, transport issues to be addressed) Space and tools needed to accommodate above operations Tools: –Overhead crane and forklift/scissor jack with rail for transferring TBM from port plug to shielded container –Water cooling systems to remove decay heat (may be necessary before one month after shutdown) Space: space for 6 shielded containers

18 Scenario B per Furlan’s memo to Ying dated on Aug. 22, 2005

19 If a half-port size TBM’s transportation outside the ITER boundary can be an issue: Dismantle TBM previously in ITER hot cells, producing medium size pieces. The next step, needing accurate visual inspection (corrosion & cracks identification) and accurate cutting methods, could be performed in a CEA hot lab if not feasible in ITER. This precise sampling of medium size specimens could be performed in Cadarache (LECA-STAR or CHICADE). Then the samples could be dispatched from there to hot labs or to the Party if requested, using small size casks.

20 Further details on the capabilities of facilities near Cadarache  Handling of materials containing tritium in the facilities: the question is to know the amount of tritium which could be released (in the vent system). Up to now the facilities are allowed to make controlled releases, provided they remain lower than a maximum yearly activity limit. If needed a demand to increase the limits may be made (probably in the frame of the whole site).  Measure of residual tritium: my knowledge is there are no adequate existing equipments in the Cadarache hot cells up to now (but it seems to be possible to design specific equipments). Additional 1.Tests in CEA Saclay: in the LECI lab the whole panel of physical, chemical, mechanical examinations & testing of irradiated samples is available, so it is for the samples preparation (examples: machining of tensile strength samples, EBM samples...).

21 Approximate weights of various TBM (preliminary) HHDD+ Earlier DT Low duty cycle DT High duty cycle DT Port 2Water-cooled ceramic breeder TBM: 1990 kg Port 16He-cooled ceramic breeder TBM: 1905 kg Port 18DCLL: 1100 kg (after PbLi drained)

22 In Tesini’s view, even coarse cutting in ITER HC is nearly impossible Disassembly Cell (Receive and Cut open TBM to remove sub- assemblies and specimen capsules) TBM From Hot Cell Building (After cooled down) Specimen Preparation Cell (x-ray photography) Low Level Radwaste Building Specimen Preparation Cell (grinding, ion milling) Airtight tritium glove box Packaging I II ( Fine sectioning) III (PIEs) (Coarse sectioning) ITER HC Facilities at Cadarache with upgrade to handle tritium

23 Disassembly and coarse sectioning cell Shielded, tritium proof containing cell Being able to operate on ½ port test blanket modules A remotely operated screw driver, laser beam cutter, precision saw, vise, and manipulator will be utilized for cutting open TBMs to remove sub-assemblies and specimen packets Need “collectors” for receiving pebbles

24 Concerns of using relevant facilities at Cadarache Of course a peer review should be made in order to check the feasibility of the requested operations in the various facilities, in particular concerning safety (activity and shielding, tritium and other species content, Beryllium, …). If Tritium measurements were required a specific feasibility should have to be launched, although LECI had to deal with in the framework of a past programme. An other point to check is the remaining life time of the facilities (or parts of them) with regard of the TBM programme schedule.

25 There are benefits of performing PIE near ITER site PIE such as tritium reconstruction, tritium recovery from ceramic breeder and beryllium pebble beds PIE on ceramic breeder pebble bed packing state and integrity

26 Performing PIE at the party’s site is also desirable It is in the interest of the material community to study the irradiation effect even at the low doses Most likely, full PIE hot cell facilities are available in the Party

27 –1 - As correctly observed by Yves, it should be demonstrated that even the TBM's initial, coarse cutting operations can be satisfactorily carried out inside the ITER Hot Cell. –2 - Even if this is possible, we should carefully consider the relative influence of the TBM's coarse cutting and ITER Hot Cell operations on the overall TBM experimental programme: a) the ITER HC is temporarily available but there is no TBM's to cut b) TBM's are ready for cutting but the ITER HC is busy with higher priority operations –3 - The above TBM/HC requirements/availability situation will worsen if the TBM's are coming into the ITER HC a) frequently and/or b) in high number. This situation is directly linked with the overall TBM's experimental programme and should be carefully considered by the TBWG

28 (1) Is it possible to handle structural and breeder materials which contain tritium (within the facilities in Cadarache)? If not, what kind of facility modification is needed to do that in the hot cell in Cadarache? (2) Is it possible to measure the residual tritium in breeder and multiplier pebbles (within the facilities in Cadarache)? (3) Is it possible to transfer breeder and multiplier materials, which contain tritium, to the country of origin? (related to smaller, more manageable specimens) Is there any authorized appropriate cask available? Can we assume no tritium leak during transportation? (4) What kind of test piece can be made in CEA Saclay? What kind of tests can be performed?

29 “Visual inspection and metrology associated with deformation measurement of the whole TBM, as well as TBM dismantling producing medium size pieces is performed in ITER hot cells. The next step, needing accurate visual inspection (corrosion & cracks identification) and accurate cutting methods, could be performed in a CEA hot lab if not feasible in ITER. This precise sampling of medium size specimens could also be performed in Cadarache (LECA-STAR or CHICADE). Then the samples could be dispatched from there to hot labs LECI-PELECI in Saclay for mechanical tests and metallographic examinations or to the Party if requested, using small size casks.”