Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Dmitrii Mausuzenko, Oleg Maev (PNPI)
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Year End Technical Stop DT work Mu Barrel Workshop 13 October 2011 A. Benvenuti (INFN Bologna)
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Barrel Maintenance Scenario for LS1 MUON-IB CMS week 11 December 2012 A. Benvenuti (INFN Bologna)
MUON piquet report 18/9 -24/ Nikolai Bondar.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Status of NA62 straw electronics Webs Covers Services Readout.
CMS WEEK – MARCH06 REVIEW OF MB4 COMMISSIONING DATA Giorgia Mila
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Development of μ-PIC with resistive electrodes using sputtered carbon Kobe Univ.,Tokyo ICEPP A F.Yamane, A.Ochi, Y.Homma S.Yamauchi, N.Nagasaka, H.Hasegawa,
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
DCal-ALICE integration and installation plan and status A. Tauro.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
Update of experimental hall in Japanese mountain site
DT Infrastructure: LV, HV, Gas
CMS RPC Endcap RE1 Status Report
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Installation plans from mid 2005
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Presentation transcript:

Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 2 By the end of November, when the detector was opened, 15 chambers with HV problems, some of them for months. Interventions in all of them had been scheduled. All problems had been bypassed by means of TJBs (towers), several pins disconnected. Mostly strip problems, wire to ground, few cathodes HV status as of November 08

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 3 Three possibilities: –Full extraction –Intervention on extraction tool –On site HV status as of November 08

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 4 After reconnecting pins in TJBs by beginning of December, most of problems gone (8 out of 15) Back from the dead + 1 additional problem YB+2 (it disappeared later)

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 5 Reconnection: problem no longer there. Sometimes problem disappear by themselves (probably dust/dirt displaced by the gas flow) In some other cases, currents still there but can be cured: – The overcurrent limit is set to 2 uA: increasing it by hand while keeping and eye on the induced currents ‘burns down’ the problem inside the cell in a short time.. Still a problem in MB4S02: some mid-height discharges with low frequency (1/minute at most). Very difficult to identify and fix (several days needed with chamber extracted) Revived chambers

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 6 We ended up with a final list of 5 chambers to be intervened. Positive end was opened first, YB+2 was used to support the beam pipe flange. The presence of the beam pipe made maneuvers more complicated –Forbidden to work or move heavy material over the pipe –Chamber rotations too tight Most complicated interventions in YB0 (no access), Extractions in YB0 must be done from the FE side (that implies uncabling, removal MABs and cable trays, retract and secure ECAL LV cables, etc. For the rest of wheels, phi SLs can be intervened in place. Theta SLs using extraction tool. Interventions timeline

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 7 HV interventions YB+1, YB+2 YB+2 HV side was accessible for a couple of days before YB+1 was moved, we profited and did the first intervention on December 5th (+2/1/08, no extraction needed, intervention on phi SL), one disconnected cathode. When YB+1 was moved close to YB+2, we accessed HV side of +1/2/01. Intervention performed on December 11th (no extraction needed, intervention on phi SL), one disconnected cell. First intervention in vertical position

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 8 YB0 HV interventions Sector 3 in YB0 freed for intervention on 0/4/03 (fixed services in HV side), full extraction required, Retracted EB cables Chamber posed on the ground: one cell disconnected. Certified after intervention using Franco’s portable cosmics system

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 9 YB0 HV interventions (II) Two more interventions on YB0, in these cases using the extraction tool (theta SL) 0/3/06 (11 Dec): External discharge (inside gaseous volume). Bad isolation fixed 0/2/09 (22 Jan): Internal discharge, one cell disconnected. Not the easiest position, but it’s proven to be feasible

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 10 YB-2 HV interventions Last intervention, also on extraction tool (-2/1/08, on 22/January, one extra dead channel) Complicated position due to presence of the nose and endcap feet (1 scissor lift + 1 cherry picker)

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 11 Statistics: – Disconnected channels TJBs before interventions: 26 HVBs (208 cells) –After retesting and reconnections, remaining problems: 13 HVBs (104 cells) –Additional disconnected channels after interventions (internal discharges) = 4 cells + 1 cathode 100 drift cells recovered thanks to interventions! What did we gain

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 12 Also several chambers with gas problems have been checked during interventions: –YB0 MB4 S06: different between output/input flows of 25%. A defect was found in the sealing o- ring of output line quick connector –YB0 MB4 S04, bad timeboxes, only one SL. Our suspect was a blockage in the input manifold. After exchanging of input/output lines, data look fine now. –Two more chambers are kept in open loop (bubbler) due to structural problems: -2/3/01, -1/4/12 The gas saga

Jesus Puerta-Pelayo, CIEMAT MUB Workshop Feb/09 13 In general HV interventions have been quite satisfactory (less than expected, all of them successful). YB0 interventions less dramatic than predicted (uncabling/cabling quite fast), space is tight but the installation team is well experienced. Tried several positions of the extraction tool, successfully. Not possible to carry out interventions in upper sectors of moveable wheels in the current manner (specially +-2) due to presence of beampipe. We’ve been lucky identifying problems ‘by eye’, but it may not be always like that… Transparent covers for HV problems? Conclusions and caveats