RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, MHz Cavity Fabrication Plan.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
1.3GHz Input Coupler for ILC
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
RF R&D (Issues) for Muon Ionization Cooling Channels
Overview of the RFCC Module and 201-MHz Cavity Design
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
XFEL Collimation and Beam Switchyard Vacuum Issues
LARP Phase II Secondary Collimator RC-1
Presentation transcript:

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London

Schematic of proposed arrangement of Muon Ionisation Cooling Experiment. What is it?

When is it needed for? April

What is in it?

Coupling Magnets  2 required, one per set of cavities.  Size and specification known.  Similar to Medical Imaging magnets.  Complete with independant cooling.  Major money £500k each.

Vacuum Pumps  Precise requirement, no clear at present.  MICE needs: –High level of vacuum –Vacuum in side Shell (inside & outside Cavities) –Superior quality inside cavity –Possibly one pump per cavity.

RF Supply  2 Couplers per cavity.  Design problem of how to access RF supply through Shell and Cavity. –Flexible connection –Expensive ceramic insulators (£15k each)

What is the current progress?  Lawrence Berkeley National Labs have designed & built a prototype cavity.  Start some testing in April 2005 at Fermilab in US.  Much still has to be done: –In service testing –Remaining first-time design

RF Cavity Overview Two 6 mm thick copper shells are welded together to form cavity. RF and vacuum ports are formed by extruding across equator weld. Two thin, pre-curved beryllium windows are mounted on cavity. Cold water system for temperature control of the cavity. Cavity inside surfaces are finished by electro-polishing.

Cavity Shell Spinning  Start with a 1.4m square of 6.35mm OFHC copper sheet.  Spin against a pre-machined form to generate half-shell with the appropriate shape.  Not a precision process, involves the cold working of a ductile material.  Similar to potters wheel.  Used for making lorry wheels and large dishes.

Equator Joint Machining Shell lips are cut using CNC machining. Lip detail includes a chamfered step that mates with the opposing shell The step locks the shell edges together and prevents slipping prior to and during e-beam welding

Electron Beam Weld Cavity and fixture system is mounted and assembled on a plate and placed on the welder table External structural weld is near full penetration and is achieved in three offset passes A final cosmetic/vacuum weld is performed on the inside of the joint with the cavity mounted on a horizontal rotary table

Nose Fabrication A stainless steel support ring is brazed to a copper backing ring. SS ring has a bolt circle for attaching Be window. Copper backing ring is then Electron Beam welded to cavity.

Cavity Port Forming Port pulling tool is used in a horizontal orientation. A weld prep is machined into the port lip using a numerically controlled mill.

Port Flange E-beam Weld Cavity is held vertically in welder chamber on a fixture that facilitates 90 degree rotations Structural and vacuum weld is achieved using a single inside pass Prototype cavity uses a stainless flange with a TIG welded copper insert (flange must hold vacuum)

Cooling Tube Weld Cavity cooling to be achieved by TIG brazing a 9.5 mm diameter copper tube to the outer surfaces Nominal flow rate is 3 gpm per circuit

What is the next step?  Electro-polishing of internal surfaces.  Obtain and fit Beryllium window.  Fermilab tests.

Shell Cleaning and Buffing Scratches and dents are created on the surfaces during spinning. Cavity surfaces and welds are smoothed out mechanically as they occur. Final cavity requires electro- polishing to achieve required internal surface quality.

Beryllium Windows Each cavity will require a pair of 0.38 mm thick pre-curved beryllium windows Copper frame is brazed to beryllium window in a subsequent process Curved shape prevents buckling caused by RF heating Third time lucky for producer, One warped One cracked

Fermilab test conditions  Cavity will be rigidly bolted through both stiffener rings to free-standing fixture.  Cavity will work in atmospheric conditions under internal vacuum.  Tuning will be conducted manually and must compensate for operating pressure difference.

Cavity Tuning System Tuners push or pull on stiffener rings to deform cavity and adjust frequency, ± 2 mm of motion required (expected), Must be remotely controlled. Current concept incorporates a scissor jack type linkage to gain both mechanical advantage and resolution Actuation forces likely to be hydraulic due to high magnetic fields

What is still left to do?  UK opportunity for involvement in detailed design & development of: –Hydraulic Tuning device, –Support for Cavity inside Main shells.  No current design work ongoing at LBNL.

How much will it cost  Key hardware costs: –£1 Million on Coupling Magnet assys –£250k of RF couplers –£250k on Cavity hardware  Design/Development costs –Unknown extent –Need for prototyping to assess remaining design and development work

Unknowns?  Cavity and Shell parameters for: –Lack of space around cavities, limited by coupling magnet. –Manufacturing tolerances, imprecise processes. –Behaviour under running conditions. –Operators’ requirements, temperature ranges and response requirements.

Could we build them in the UK?  Yes, with exceptions –Cavities –Shell –Magnets –Liquid H Absorber –Beryllium Windows –Vacuum Pumps YesYesYes ? (Oxford study) NoYes