MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Module Connection and Support Arrangement Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting May 21, 2004.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Progress on the Coupling Coil & Focus Coil Interface Engineering
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
1.3GHz Input Coupler for ILC
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Integration of the Spectrometer Solenoid Magnets
Overview of the RFCC Module and 201-MHz Cavity Design
Spectrometer Solenoid Fabrication Status and Schedule
Presentation transcript:

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004

RF/CC Module Issues Steve Virostek - LBNLPage 2 Design Status Summary Progress since MICE meeting in 10/03: Module-to-module joint concept incorporated with bellows Module support structure concept completed (height will accommodate rails) Conceptual design of cavity and vessel vacuum system complete Fabrication of cavity prototype is nearly complete RF coupler for prototype cavity designed, being fabricated Currently outstanding issues: Detailed structural and seismic analysis of system and components Detailed design of cavity automatic tuning system Coupling coil cold mass support interface and cryocooler arrangement Detailed vacuum system analysis Cavity assembly to vacuum vessel, vessel feedthrough designs Thermal and structural consideration of LN 2 operation

RF/CC Module Issues Steve Virostek - LBNLPage 3 Module-to-Module Joint New module-to-module joint design incorporates a commercially available bellows Flexibility allows sufficient room for module installation/removal while providing for relaxed tolerances Magnet forces can be carried through vessel and across joint through bolts

RF/CC Module Issues Steve Virostek - LBNLPage 4 Support Structure Support structure concept uses large stiff plates welded directly to the vacuum vessel Structure will be designed to be strong and stiff enough to transmit coil forces to the ground Current support design height would allow the use of lateral rails for module installation/removal

RF/CC Module Issues Steve Virostek - LBNLPage 5 RF Coupling Loop Design Coupling loops design will use standard off-the-shelf copper co-ax Parts to be joined by torch brazing Coupling loop has integrated cooling Design incorporates SNS style RF windows manufactured by Toshiba Bellows connection is required to accommodate hard RF connection to cavity Need to integrate with MICE layout

RF/CC Module Issues Steve Virostek - LBNLPage 6 Vacuum System Vacuum system concept uses a pair of cryo pumps per module Pumps are connected to a manifold to pump two cavities plus the vacuum vessel Cavity extension tube limits conduction between vessel and cavity vacuum while providing protection for Be windows

RF/CC Module Issues Steve Virostek - LBNLPage 7 Prototype Fabrication Fabrication of prototype RF cavity is nearing completion All e-beam welds have been performed and ports with flanges have been added Remaining tasks are: cavity interior buffing, chemical cleaning and high pressure water rinse, electropolishing, low power RF testing, high power RF conditioning

RF/CC Module Issues Steve Virostek - LBNLPage 8 Component Structural Analysis Load and stress analysis of the bellows joints based on calculated worst case magnet loads must be carried out Detailed design and stress analysis of the module support structure is necessary to ensure forces are carried to the floor and not transmitted to AFC modules Modal and seismic analysis of the supports and other subcomponents will be needed to confirm the system is sufficiently stiff and can withstand an earthquake The details of interfacing with a lateral rail system must be explored in detail

RF/CC Module Issues Steve Virostek - LBNLPage 9 Cavity Tuning System Six mechanical tuners per cavity needed Tuners push or pull on stiffener rings to deform cavity and adjust frequency ±1 to 2 mm of motion required Current concept incorporates a scissor jack type linkage to gain both mechanical advantage and resolution Actuation forces likely to be hydraulic due to high magnetic fields Detailed design remains to be done

RF/CC Module Issues Steve Virostek - LBNLPage 10 Coupling Coil Issues Connections and support arrangement between coil cryostat and the vacuum vessel need to be worked out in detail Final arrangement of cryo-coolers for maintaining coil temperature to be determined Mike Green to provide details

RF/CC Module Issues Steve Virostek - LBNLPage 11 Other Topics Detailed analysis of the vacuum loads, conductances and effective pumping speeds Assembly of cavities into vacuum vessel, including design of mounting scheme using tuners Detailed design of vessel feedthroughs for making internal connections to cooling water, tuners and RF couplers Thermal and structural consideration of operating the cavities at LN 2 temperature (heat leaks, thermal contraction stresses, etc.)