INTRODUCTION MANUALLY ADJUSTABLE STILTS “Easy Lifts” INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
INTRODUCTION 2 GROUP MEMBERS Trent Hilliard Ian Juurlink Brad Poirier Mitchell Weir SUPERVISOR Dr. Marek Kujath PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION 2
PROBLEM INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
PROBLEM CURRENT STILTS: INTRO CURRENT STILTS: Used for tasks requiring small rises in elevation Difficulties: Getting on stilts Picking up objects Adjusting PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
PROBLEM GETTING UP: INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
PROBLEM PICKING UP OBJECTS: INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
PROBLEM GETTING DOWN: INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
PROBLEM INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
IDEAS LIFTING DEVICE Power screw http://forums.vwvortex.com INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION http://forums.vwvortex.com
IDEAS LIFTING DEVICE 2. One leg-lift INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
IDEAS LIFTING DEVICE 3. Hydraulic Scissor Lift www.autoliftuk.com INTRO LIFTING DEVICE 3. Hydraulic Scissor Lift PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION www.autoliftuk.com
IDEAS LOCKING DEVICE Rotary Ratchet www.wikipedia.org INTRO LOCKING DEVICE Rotary Ratchet PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION www.wikipedia.org www.istockphoto.com
DESIGN LIFTING DEVICE: SCISSOR LIFT INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
DESIGN LIFTING DEVICE: SCISSOR LIFT 1. Member Design 2. Member INTRO PROBLEM 1. Member Design 2. Member Confinement 3. Assembly Materials Aluminum Bushings Snap Rings IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
DESIGN LIFTING DEVICE: SCISSOR LIFT INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
DESIGN LOCKING MECHANISM: INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
DESIGN LIFTING DEVICE: SCISSOR LIFT INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
DESIGN LINEAR DAMPER: Gas Spring Provides upward force SAFETY feature INTRO LINEAR DAMPER: Gas Spring Provides upward force SAFETY feature PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
ANALYSIS FORCE DETERMINATION: INTRO PROBLEM IDEAS W = Force Applied L = Length of Beam D = Location of Center of Gravity DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
ANALYSIS Stress Analysis: INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
BUDGET INTRO Item Item Cost Qty. Total Cost Stilts $365.00 1 Bearings $1.41 16 $22.56 Bushings $0.72 $11.52 Aluminum Plating $88.16 Steel Flat Bar $6.96 2 $13.92 Aluminum Flat Bars $6.30 6 $37.80 Pins $6.00 $12.00 Concept Prototype $50.00 Snap Rings $36.31 Actuator $30.00 $60.00 Locking Mechanism $74.80 Damper $100.00 PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION TOTAL (with 10% contingency) $1,274.16
SCHEDULE CRITICAL SCHEDULE ITEMS Jan/14/10: Final Drawing Submission INTRO CRITICAL SCHEDULE ITEMS Jan/14/10: Final Drawing Submission Feb/01/10: All material obtained March/01/2010: Fabrication and assembly PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
SCHEDULE CRITICAL SCHEDULE ITEMS March/22/10: Testing April/08/10: INTRO CRITICAL SCHEDULE ITEMS March/22/10: Testing April/08/10: Final report submission April/10/10: Final presentation PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
CONCLUSION WHAT’S LEFT? Fine details on locking mech. Finalize the damper force INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
CONCLUSION QUESTIONS? INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
CONCLUSION WALKING WEIGHTS: Current Stilts weight: 15.5 lbs. INTRO WALKING WEIGHTS: Current Stilts weight: 15.5 lbs. Competitor stilts: 14-17 lbs Miner’s work boots: 7 lbs Target stilt weight: <20 lbs PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE CONCLUSION
CONCLUSION INTRO PROBLEM IDEAS DESIGN ANALYSIS BUDGET SCHEDULE