Year End Technical Stop DT work Mu Barrel Workshop 13 October 2011 A. Benvenuti (INFN Bologna)

Slides:



Advertisements
Similar presentations
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Advertisements

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Barrel Maintenance Scenario for LS1 MUON-IB CMS week 11 December 2012 A. Benvenuti (INFN Bologna)
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Technical Support Activities in PH-ADO-PO
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
DT Hardware Status and Monitoring A.Benvenuti INFN Bologna Muon Barrel Workshop 28/09/2010.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
TK Dry Gas System Operation  System overview  Dry Gas Consumption  Interlocks and thresholds  Documentation  Operational model  Final comments.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
“Breve” stato dell’apparato: Risultati e Problemi Anton, Ian, Nicolas, Saleh, Salvatore Barrel Endcap Endcap Endcap Cooling Endcap Cooling Last Minute.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
TC meeting P2 planning wks 3&4 A.Tauro
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Integration and Services RE3/1 and RE4/1
Service channels between Tracker and PP1
Technical Coordination Parallel Session November 2011, FNAL
Integration and Services RE3/1 and RE4/1
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Introduction Status before the 2009 run Results from the 2009 run
CMS Area Working Group Meeting
LHC Experimental Vacuum Systems Status October ‘07
CMS November Upgrade Week
4th FRC meeting, Antti Onnela, CERN-PH-DT
DT Infrastructure: LV, HV, Gas
Pierluigi Paolucci - I.N.F.N. Naples
CSC Electronics Installation and Commissioning CSCE I&C
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

Year End Technical Stop DT work Mu Barrel Workshop 13 October 2011 A. Benvenuti (INFN Bologna)

Year End Technical STOP Technical coordination “Retreat” in Divonne on September to assess opportunity/necessity of opening the detector: Main driver being access to Tracker for studying the humidity control, in view of operating at low temperature, - 20C after LS1  Not cost effective within a 13 weeks YETS; additional 4 weeks needed.  Not ruled out since LHC plans not yet final (Thermal amplifier tests..) but unlikely unless start of LS1, 17 November 2012, also shifts  Not very interesting for DT work since, at best, only limited access would be possible to wheels

Nicola Bacchetta

Year End Technical STOP Provisional Schedule 18:00 Beam OFF (year end calibrations) 08:00 Magnet Ramp Down (DT shutdown ) 14:00 Water Cooling Maintenance 12/12 AUG tests UXC closed 13/12 CASTOR Removal Test 21/12 HF on the floor 09/01 Cooling is back 06/02 Skeleton Shift crew 24/7 08/02 first MWGR 23/02 Magnet Ramp to full field (Cosmics data taking) 07/03 Beams back in LHC + 3 weeks commissioning with beams

HV Problems Summary Compared to 9 chambers with HV problems and 132 channels lost at the end of 2010 (YB-2 MB4 S07 is intermittent, not included in 2010 statistics) September

A Snapshot of DT and RPC (Barrel) Maintenance Work (as of today) SUMMARY Gianni Masetti: DT dead channels grand total = 1050 (0.6%) Only work requiring access to the detector is entered in the table Only RPC maintenance that requires moving the chambers is included September

DT HV Phi DT HV Theta RPC Extract RPC Replace Problems in DT or RPC Requires uncabling

Can DTs Benefit from Opening the Detector ? It depends for how long and how far: 1) Opening up to YB±2 allows access to the MiniCrates and inspection of cooling and gas connections 2) Opening up to YB±1 allows HV repairs on Phi SL of two chambers in YB-2 and one in YB+2 plus maintenance of YB±1 3) Opening up to YB±1 allows also access to HO RBX in the movable wheels. However, for YB±1 this requires removing DT gas and cooling lines from MB1. 4)Chamber extraction out of the iron pockets is not feasible in any “normal” scenario for the end of the year TS

Caveats Opening and closing the detector are delicate operations that might damage some components. The risks must be weighted against the gains from the possible fixes. Each DT intervention requires time consuming tests with cosmics data taking that are possible only when the general infrastructures (power, cooling, gas and DAQ) are operational The wheels cannot be closed until the tests are successfully completed  For the DTs, the balance is not in favor of opening the detector

DT Off Detector Maintenance: LV Connectors Melted connector found on 28/ 10/ 2009 Weak point identified in the poor match of cable (Powerclaw) and CAEN supply connectors (PP75) exacerbated by rigid cables All jumper cables and connectors were replaced using very flexible cable in the Technical Stop Monitoring of temperatures and Vdrops was extended considerably Still several problems in 2010 and 2011 Major cause of UXC access requests for DT The way it should be

A Radical Solution “Pigtails” with AP connectors soldered on the LV modules 4 modules have been modified and are in use since the July TS Some numbers: 26 A3050 and 2 A3100/ wheel 112 pigtails/wheel 1 – 1.5 hours/ module Modules test : 8-12/day  1 Wheel/ week All pigtails should be ready before starting 2 Soldering stations Soldering procedures and trained personnel (developed by M. Pegoraro) Best place is in S1 (proximity to detector)  Decision on the modules to modify, types and quantity, by November at latest

LV Pigtails (continued) Last Friday, Cristina presented the plan and requests for this intervention during the TC meeting Well received, HCAL interested in applying this solution Space identified in area between S1 and elevator => OK Draft of “Procedures Agreement” prepared by Cristina  Critical items: Test system(s) (Daniele F.) Components: cable, connectors, PENETROX (3 bottles from MJ)… Derogations Pigtails preparation ( 26 A3050, 2 A3100, 8MAO/YB) = 720 pigtails in total (5 wheels) plus spares Decouple RP clearance from intervention Logistics (moving in and out the modules), dressing cables in tower racks and testing afterwards is a very demanding task  Manpower requirements: 2 +1 technicians for soldering, 1+1 for moving and cabling  Total of 4-5 Technicians for 5 weeks + physicists for testing

LV Connectors (The Challenge) Define pigtails lengths and strain relief during next TS Identify equipment and procedures for moving modules MAO extraction and transportation is a major challenge (pain)  130 A3050, 10 A3100, 40 MAO

YETS 2011 (In Addition) Check A3009 connections (Hotspots and currents to be done during next TS, magnet OFF, not enough time before YETS power off) Improve TJB noise shielding (present aluminum foil and aluminum tape turkey wrap is not viable for the long run) Insert new TJBs and check persistence of HV problems Gas system maintenance/improvements to be agreed with Roberto Guida: - Calibrate ~ 10 flow-meters - Replace humidity analysis system in four wheels - Install and commission the “inline gas chromatograph” - Isolate the VDC lines from the O2 reference gas - Determine time required to clear out gas in VDC during analysis cycle (now set to 1 hour) Some minor VDC interventions: new gas line connections, VDCs intercalibration, improved air tightness by adding a VDC “hood”  AOB, depending on what happens between now and 06 December

First measurement after the “reference gas” point is out of norm for all VDC. Effect disappears if measurement time is increased to ~4 hours Measurements for YB±1 have ~ factor 2 larger errors  Daniel is investigating the cause

Summary The LV supplies modification is the main activity for this YETS All pigtails must be ready before January 16 for the intervention to succeed  The intervention can proceed in stages: modify all MAO, all A3100 (SC), all A3050 in a wheel in order to minimize the risks In case the detector will be opened we can take the opportunity to fix the know MC problems in YB ± 2 and inspect gas and water connections. This would not interfere with the other DT planned activities  But of course, plans can change…….

Backup

Extraction tool mounted on MB2S09. Similar position as needed for YB0 MB3S06 and MB2S09. The SL cover to open is located in the upper part of the chamber for MB2S09 and in the bottom part for MB3S06.

Interventions on top sectors are done with heavy equipment above the beampipe

And, to a lesser extent, also work on YB+1

1)Remove MABs: S03/S04, S01/S02 and S05/S06 (Maf + alignment team) 2)Remove covers from radial cable trays 3)Remove Thermal Shields from Vacuum Tank to access ECAL LV Patch Panels, 2 TS/sector 4)Disconnect ECAL LV Cables ( 98 ) from PP on VT 5)Pull cables to Sector periphery and secure on cable trays ( 2 persons on scissor lift + 1 person on periphery) 6)Mount platforms on VT, where needed 7)Remove ECAL radial cable trays 8)Disconnect, pull-out and secure the optical fibers (DT technicians) 9)Disconnect DT and RPC cables ( DT+RPC tecs) 10)Pull cables to the periphery and secure them 11)Disconnect Gas and cooling (DT+RPC techs) Z0+ Cables Removal Platforms are not needed for the cables removal in S06. The extraction tool can be mounted with a scissor lift The HV repair can be carried out from the scissor lift