Agenda Questions? IP part 1 Late IP Part 2 Due Oct 10 (or maybe Oct 14) Group work days Oct 3 Assignment 3 Due Due September 30 prior to class Assignment 4 Posted Read Case Study 4.3, Problems with John (page 130) and 5.4, Classic Case: The Ford Edsel . (page 167). Complete and upload the answers to the Questions at the end of each case study. In addition, complete the MS Project Exercise Project Outline-Remodeling an Appliance on page 171 of the text. Upload a MS project file (*.mpp) Due Oct 7 Exam 1 on Oct 7 Chaps 1-5 Open Book Open Notes 80 min. Scope Management
Chapter 5 Scope Management
Chapter 5 Learning Objectives After completing this chapter, students will be able to: Understand the importance of scope management for project success. Understand the significance of developing a scope statement. Construct a Work Breakdown Structure for a project. Develop a Responsibility Assignment Matrix for a project. Describe the roles of changes and configuration management in assessing project scope.
Project Scope Project scope is everything about a project – work content as well as expected outcomes. Scope management is the function of controlling a project in terms of its goals and objectives and consists of: 1) Conceptual development 4) Scope reporting 2) Scope statement 5) Control systems 3) Work authorization 6) Project closeout
1) Conceptual Development The process that addresses project objectives by finding the best ways to meet them. Key steps in information development: Problem/need statement Information gathering Constraints Alternative analysis Project objectives
Problem Statements Successful conceptual development requires: Reduction of overall project complexity Goals and objects are clearly stated Reference points are provided Complete understanding of the problem
2) Statement of Work (SOW) A SOW is a detailed narrative description of the work required for a project. Effective SOWs contain Introduction and background Technical description Timeline and milestones Client expectations
Statement of Work Components Background Objectives Scope Task or Requirements Selection Criteria Deliverables or Delivery Schedule Security Place of Performance Period of Performance Statement of work.docx
Scope Statement Process Establish the project goal criteria cost schedule performance deliverables review and approval gates Develop the management plan for the project Establish a work breakdown structure Create a scope baseline
Goal Setting With and Without Work Breakdown Structures (WBS) Figure 5.2 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
Work Breakdown Structure (WBS) A process that sets a project’s scope by breaking down its overall mission into a cohesive set of synchronous, increasingly specific tasks. What does WBS accomplish? Echoes project objectives Offers a logical structure Establishes a method of control Communicates project status Improves communication Demonstrates control structure
Example WBS Making a PBJ Gather materials Assembly Consumption Get 2 slices of bread Get peanut butter Get jelly Get butter knife Assembly Using knife spread 1/8” layer of peanut butter on one side of one slice of bread Using knife spread 1/8” layer of jelly on one side of the other slice of bread Place two slices of bread together with peanut butter in contact with jelly Consumption Bite off a chunk of PBJ Chew Swallow
Defining a Project Work Package Work package forms lowest level in WBS. Work package has a deliverable result. Work package has one owner. Work package may be considered by its owner as a project in itself. A work package may include several milestones. A work package should fit organizational procedures and culture. The optimal size of a work package may be expressed in terms on labor hours, calendar time, cost, reporting period, and risks.
Work Breakdown Structure and Codes 1.0 1.2 1.3 1.4 1.2.1 1.2.2 1.2.3 1.3.1 1.3.2 1.2.3.1 1.2.3.2 The project is the overall project under development Deliverables are major project components Sub-deliverables are supporting deliverables Work Packages are individual project activities
Sample WBS in MS Project 2010 PBJ.mpp Figure 5.7
Sample WBS in ProjectLibre
Organizational Breakdown Structure Organizational Breakdown Structure (OBS) allows Work definition Owner assignment of work packages Budget assignment to departments OBS links cost, activity & responsibility
Intersection of the WBS and OBS Figure 5.8 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
Cost Account Rollup Using OBS Figure 5.10 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
Responsibility Assignment Matrix Figure 5.11
3) Work Authorization The formal “go ahead” to begin work Follows the scope management steps of: scope definition planning documents management plans contractual documents
Contractual Documentation Most contracts contain: Requirements Valid consideration Contracted terms Contracts range from: Lump Sum Cost Plus also called “Turnkey”
4) Scope Reporting determines what types of information reported, who receives copies, when, and how information is acquired and disseminated. Typical project reports contain Cost status Schedule status Technical performance
http://www.behance.net/gallery/Cost-Control-Technic-for-Construction-Projects/3565269
5) Types of Control Systems Configuration Design Trend monitoring Document Acquisition Specification templates\Project Exception report.doc templates\Technology Project Assessment 1-16-01.xls
6) Project Closeout The job is not over until the paperwork is done… Closeout documentation is used to: Resolve disputes Train project managers Facilitate auditing Closeout documentation includes: Historical records Post project analysis Financial closeout
Reasons Why (IT) Projects Fail Politics Naïve promises Naïve optimism of youth Startup mentality of fledging entrepreneurial companies “Marine Corps” mentality Intensive competition caused by globalization Intense competition caused by appearance of new technologies Intense pressure caused by unexpected government regulations Unexpected and/or unplanned crises
Using MS project 2010 (and ProjectLibre) Many of the required functions/reports in Project management are part of MS project 2010 Industry wide acceptance Do not use Wizard till you are comfortable with MS project File New Blank Project Enter Project and all Deliverables Sub deliverables Work packages Indent using arrows to show decomposition Template Actual project More on MS Project as we progress through course
Summary Understand the importance of scope management for project success. Understand the significance of developing a scope statement. Construct a Work Breakdown Structure for a project. Develop a Responsibility Assignment Matrix for a project. Describe the roles of changes and configuration management in assessing project scope.