WG-CSAB Updates Fall 2014 COPC Meeting (NSOF, Suitland, MD) Nov 4-5, 2014 Dave McCarren WG-CSAB Chair.

Slides:



Advertisements
Similar presentations
Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP
Advertisements

1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team.
Bill Ward/Michael Folmer Himawari Satellite Training Leads Himawari Training Plan NOAA Satellite Proving Ground/User-Readiness 2014 Meeting Kansas City,
NCEP Production Suite Review NWS Integrated Dissemination Program
A-16 Supplemental Guidance Document FGDC Annual Report Ken Shaffer FGDC Deputy Staff Director FGDC Coordination Group November.
Working Group for Consolidated Communications Management (JAG-CCM) Update Spring CSAB 2008 Mr. Charles Abel AFWA JAG Representative.
COPC/JAG-CCM Status Updates and Recommendations 16 November 2010 Chris Finnigsmier Acting JAG/CCM Chair.
Committee for Operational Processing Centers (COPC) Update NOPC Program Council Meeting 13 June 2012 (OFCM – Silver Spring, MD) Dave McCarren WG-CSAB Chair.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Fall COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
WG-CSAB Update Fall 2010 COPC Meeting (AFWA – Offutt AFB) Allan Darling WG-CSAB Chair.
1 COPC Shared-Network Infrastructure Brief Prepared for: COPC Working Group for Cooperative Support and Backup (WG/CSAB) October 21 and 22, 2008 Meetings.
ESDA Discussion Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell WG-CSAB Chair.
Himawari-8 Project Plans and Status. Background 2 NESDIS is implementing a capability to ingest Advanced Himawari Imager data from JMA, process and generate.
WG-CSAB Updates Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell WG-CSAB Chair.
11 A presentation on A-16 Themes for The FGDC Steering Committee June 5, by Wendy Blake-Coleman US EPA Lifecycle Management Work Group.
H-8 Project Update COPC May 27, H-8 Project Update JMA planning for full H-8 operations in July 2015 – Commissioning progressing well Data quality.
JAG/ODAA Spring 2010 COPC Co-Chairs: Co-Chairs: Mr. James Vermeulen, FNMOC Mr. James Vermeulen, FNMOC Dr. Bradley Ballish, NCEP Dr. Bradley Ballish, NCEP.
Working Group for Cooperative Support and Backup (WG-CSAB) Update Fall COPC 2007 John Zapotocny CSAB Chair.
N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N NOAA/NESDIS Himawari 8 TeamAug NOAA/NESDIS Himawari-8/9 Planning.
Office of the Federal Coordinator for Meteorology 1 Office of the Federal Coordinator for Meteorological Services and Supporting Research (OFCM) Briefing.
WGA Request The Western Governors urge NOAA to: Complete a National Needs Assessment Report, by NOAA’s Office of the Federal Coordinator for Meteorology,
1 Draft COPC/CSAB JAG-CCM Status Updates and Recommendations September 15, 2009 JAG-CCM Team version
National Wildland Fire Weather Needs Assessment National Wildland Fire Weather Needs Assessment Mr. Mike Babcock Senior Staff Meteorologist, OFCM CCAMS.
JAG/CCM Update COPC Spring 2006 Mr. Walter Coley JAG/CCM Chairman Distribution Authorized to U.S. Government Agencies and their Contractors only.
Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
NAVY UTN-P & FTP POLICY UPDATE 16 April 07 CDR Dave Pashkevich CNMOC N64.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Spring COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
JAG/ODAA Update Spring 2012 Co-Chairs: Mr. Dennis Hobson, AFWA Mr. Kyle Rushing, NAVO Presented by: Mr. Dennis Hobson Exec. Secretary: Mr. Anthony Ramirez,
JAG/ODAA Fall 2008 James Vermeulen & Jon Whiteside JAG-ODAA Co-Chairs Recommend NCEP's Bradley Ballish replace Jon Whiteside (term completed)
Joint Action Group for the National Wildland Fire Weather Needs Assessment 12 Oct 2006, 12:30 – 4:30 EDT Cochairs: Dr. Al Riebau, Mr. Eli Jacks OFCM: Lt.
JAG/ODAA Update Fall 2013 Co-Chairs: Mr. Kyle Rushing, NAVO Mr. Dennis Hobson, AFWA Exec. Secretary: Mr. Anthony Ramirez, OFCM Mr. Anthony Ramirez, OFCM.
Joint Action Group for Operational Community Modeling (JAG/OCM) Update Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell.
WG-CSAB Update Fall 2010 COPC Meeting (FNMOC – Monterey, CA) Allan Darling WG-CSAB Chair.
JAG/ODAA Spring 2009 COPC Co-Chairs Satellite: Mr. James Vermeulen, FNMOC Conventional: Dr. Bradley Ballish, NCEP Exec. Secretary: Mr. Tony Ramirez, OFCM.
1 JAG/CCM Status Updates and Recommendations Spring COPC Meeting May 27-28, 2015 Craig Wade JAG-CCM Chairperson.
Indian Ocean Data Coverage Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell WG-CSAB Chair.
BACKUP XDRs and NDE PRODUCTS Fall 2010 COPC Meeting (AFWA – Offutt AFB) Jim Vermuelen FNMOC - Data Ingest Team Supervisor WG-CSAB Member JAG/ODAA Co-Chair.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting November 20-21, 2013 JAG-CCM Team Craig Wade (CCM Chair)
1 COPC/CSAB JAG-CCM Status Updates and Recommendations October 21, 2009 JAG-CCM Team version
Working Group for Consolidated Communications Management (JAG-CCM) Update Fall COPC 2007 Mr. Walter Coley JAG Chairman.
JAG/ODAA Spring 2009 COPC Co-Chairs Satellite: Mr. James Vermeulen, FNMOC Conventional: Dr. Bradley Ballish, NCEP Secretary: Mr. Tony Ramirez, OFCM.
1 COPC JAG-CCM Status Updates and Recommendations May 4, 2010 JAG-CCM Team version
1 COPC/CSAB JAG-CCM Status Updates and Recommendations April 7, 2010 JAG-CCM Team version
National Centers for Environmental Prediction: COPC Data Distribution Systems – IDP & NWSTG Michelle Mainelli Deputy Director, NCEP Central Operations.
Fleet Numerical… Atmospheric & Oceanographic Prediction Enabling Fleet Safety and Decision Superiority… Fleet Numerical Meteorology & Oceanography Center.
1 NUOPC National Unified Operational Prediction Capability Update to COPC 4 – 5 Nov 2015 Dave McCarren, NUOPC DPM.
1 Joint Action Group for Operational Community Modeling Dr. Nelson Seaman JAG/OCM Chair Fall COPC 2008 AFWA, Omaha, NB 13 November 2008.
Working Group/Observational Data Fall 2015 Co-Chairs: Mr. Kyle Rushing, NAVO Mr. Vincent Tabor, NOAA/NESDIS Exec. Secretary: Mr. Anthony Ramirez, OFCM.
WG-CSAB Updates Spring 2013 COPC Meeting (FNMOC, Monterey, California) November 20-21, 2013 Dave McCarren WG-CSAB Chair.
Action Item NCEP Central Operations 4-5 November 2015 COPC – Fall 2015.
1 JAG/CCM COPC Status Updates and Recommendations NOV 4-5, 2015 LCDR Tristan Borne JAG-CCM Chairperson.
1 COPC/CSAB JAG-CCM Status Updates and Recommendations Prepared for: CSAB Spring Meeting April 15, 2009 By: CCM Team version
WG-CSAB Updates Fall 2015 COPC Meeting (Offutt AFB, Omaha, NE) November 4-5, 2015 Lamar Russell WG-CSAB Chair.
Joint Action Group for the National Wildland Fire Weather Needs Assessment 12 Dec 2006, 10:00 – 12:00 EST Cochairs: Dr. Al Riebau, Mr. Eli Jacks OFCM:
JAG/ODAA Fall 2009 COPC Co-Chairs Mr. James Vermeulen, FNMOC Mr. James Vermeulen, FNMOC Dr. Bradley Ballish, NCEP Dr. Bradley Ballish, NCEP Exec. Secretary:
DOD NPOESS Data Exploitation COPC Action Item ,11 Jim Vermeulen 21 October 2008.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
WG-CSAB Update Fall 2008 CDR Mark Moran, NOAA WG-CSAB Acting Chair.
1 National Centers for Environmental Prediction Status of UCAR Review Recommendations Executive Summary September 15, 2010 Louis Uccellini Director “Where.
COPC Action Item : The COPC/CSAB shall work with the NUOPC Deputy PM to develop a proposed structure for the working relationship between NUOPC.
COPC Status Briefing on National Unified Operational Prediction Capability (NUOPC) Fred Toepfer 15 November 2007.
JAG/ODAA Spring 2011 COPC Co-Chairs: Mr. James Vermeulen, FNMOC Dr. Bradley Ballish, NCEP Presented by: Mr. James Vermeulen Exec. Secretary: Mr. Anthony.
1 Status Briefing on National Unified Operational Prediction Capability (NUOPC) Fred Toepfer, NUOPC PM May 29, 2008 NUOPC.
1 JAG/CCM COPC Status Updates and Recommendations May 4-5, 2016 LCDR Tristan Borne JAG-CCM Chairperson.
Joint Action Group for the National Wildland Fire Weather Needs Assessment 16 Mar 2007, 12:00 – 2:00 EST Cochairs: Dr. Al Riebau, Mr. Eli Jacks OFCM: USAF.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Spring CSAB 2011 Mr. Evan Kuchera JAG/OCM Chair.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
WG-CSAB Update Spring 2010 COPC Meeting Allan Darling WG-CSAB Chair.
Presentation transcript:

WG-CSAB Updates Fall 2014 COPC Meeting (NSOF, Suitland, MD) Nov 4-5, 2014 Dave McCarren WG-CSAB Chair

2 Overview  WG-CSAB membership  DAPE and ESDA  UEO Candidate NUOPC Products  Federal Plan for Cooperative Support and Backup Among OPCs  GOES-R Direct Readout  NOMADS  WG & JAG Chair Status  Review the COPC AI Status

3 WG-CSAB Current Membership CNMOC and NUOPC Liaison Mr. Dave McCarren (Chair) AFWA RepresentativeMr. Ken Smith FNMOC RepresentativeMr. Jim Vermeulen NAVO RepresentativeMr. Lamar Russell NCEP Representative Dr. James Yoe NESDIS RepresentativeMr. Keith Amburgey NWS/TOC RepresentativeMr. Bob Bunge OFCM Executive SecretaryMr. Ken Barnett WG/OD Co-chairMr. Dennis Hobson (AFWA) WG/OD Co-chairMr. Kyle Rushing (NAVO) JAG/CCM ChairMr. Craig Wade (NESDIS) JAG/OCM ChairDr. Mark Swenson (FNMOC) *New to this group or role since the last COPC meeting

4 DAPE Agreement and ESDA COPC Action Item : Complete a new DAPE agreement for signature. And COPC Action Item : Review and update the Environmental Satellite Data Annex to the DAPE MOA. Original Memorandum of Agreement (MOA) signed 2008 MOA update staffed and signed Sep 2013 with minimal changes New agreement in-place for current fiscal year; AF/A3O-W directed AFWA pursue revision to align with AF GC review comments AFWA took the lead to develop the first draft of revised DAPE and ESDA ESDA submitted to CSAB for review. With the AF restructuring, CSAB needs to know the AF signatory level for both documents. 4

5 UEO Candidate NUOPC Products COPC Action Item : Arrange to have the UEO present evaluation results for candidate NUOPC products at the next COPC, with the goal of approving selection of NUOPC products to be made available for user access). This has been turned over to the UEO committee - As new products are developed they will reviewed with COPC before implementation. CSAB recommends closing this action. 5

6 Federal Plan for Cooperative Support and Backup Among OPCs COPC Action Item : Review and update the Federal Plan for Cooperative Support and Backup Among Operational Processing Centers (FCM-P ). CCM and CSAB need to update the networking aspects (i.e. 2 nd Connection and NFG). Need FNMOC final input and a review of impacts because of organizational restructuring. CSAB recommends keeping this action open. 6

7 GOES-R Direct Readout COPC Action Item : Each OPC to provide anticipated GOES-R implementation strategy; expressly addressing data receipt mechanism/methodology and impacts to processing infrastructure. GOES-R is scheduled to launch in May Air Force anticipates a direct GOES-R readout capability. NAVO and FNMOC are continuing to pursue GOES-R Direct Read- out capability. Awaiting funding designation and/or allocation to obtain necessary hardware. CSAB recommends keeping this action open. 7

8 NOMADS COPC Action Item : NCEP (in particular NCO) will host a teleconference meeting/s with the DOD OPCs to develop the way forward with NOMADS. 1) Investigate alternative paths (besides Internet) for the operational use by the OPCs. 2) Discuss architecture and backup capabilities. 3) Solve getting the DOD data flows on the NOMADS server for distribution. Internet access will still be the primary path for DOD. NCEP is looking to creating an Intranet which could be manually switched to allow access via the COPC Network in times of a DOD Internet outage. Dissemination of AFWA Ensemble products Expected from College Park in Q2 of FY 2015 CSAB recommends keeping this action opened. 8

9 Status of the COPC AIs : NWS Weather-Ready Nation (WRN) to present a briefing covering the results and findings of the social sciences work under the Impact-based Decision Support Services (IDSS) effort. (Close) : JAG OCM shall coordinate a face to face meeting to articulate OCM’s particular role within the COPC infrastructure where the group can add value. (Close) : Arrange to have the UEO present evaluation results for candidate NUOPC products at the next COPC, with the goal of approving selection of NUOPC products to be made available for user access. (Close) : JAG CCM shall coordinate with COPC partners to update the network requirements (now FY14-FY17). (Keep Open) : Complete a new DAPE agreement for signature. (Keep Open) : Review and update the Environmental Satellite Data Annex to the DAPE MOA. (Keep Open) : : Implement an end-to-end latency test exchange using representative proxy data from NOAA (NESDIS, TOC, and NCEP) through NFG to each DOD OPC. (Keep Open)

10 Status of the Other COPC AIs : Work with the Product Distribution and Access (PDA) Project Manager to understand the critical milestones for the implementation of the PDA and how this will impact the DAPE Gateway and DOD partners. (Keep Open) : NESDIS to track and share JMA rebroadcast and HRIT downsampled product offerings. JAG ODAA to assess mutual center needs for obtaining Himawari via cooperative share relationship with JMA. (Keep Open) : NCEP (in particular NCO) will host a teleconference meeting/s with the DOD OPCs to develop the way forward with NOMADS. 1) Investigate alternative paths (besides Internet) for the operational use by the OPCs. 2) Discuss architecture and backup capabilities. 3) Solve getting the DOD data flows on the NOMADS server for distribution. (Keep Open) : Review and update the Federal Plan for Cooperative Support and Backup Among Operational Processing Centers (FCM-P ). (Keep Open) : At the next COPC meeting give an update on how NOAA will connect to the Backup PDA in Fairmont and what connectivity there will be between the Backup PDA and DOD. (Keep Open) : Each OPC to provide anticipated GOES-R implementation strategy; expressly addressing data receipt mechanism/methodology and impacts to processing infrastructure. (Keep Open)

11 WG and JAG Chairs CSAB 1994 James G. Howcroft (NMC) 1995 Donald Caviness (AFWA) 2000 Carl Thormeyer (FNMOC) 2005–2008 (Sept) John Zapotocny (AFWA) 2008 (Oct) CDR Mark Moran (NCEP) 2008 (Nov)– 2011(May) Allan Darling (NCEP) 2011 (June) – (Current) David McCarren (CNMOC) JAG/CCM 2002 LCDR Susan Groening (FNMOC) 2004 Sherryl Panek (FNMOC) Walter Coley (AFWA) (Oct) Luis Cano (NCEP) (1 Apr) Chris Finnigsmier (AFWA) 2011 (June) – (Current) Mr. Craig Wade (NESDIS) JAG/OCM 2005–2009 Nelson Seaman (NCEP) 2009 (May) – 2012 (May) Mr. Evan Kuchera (AFWA) 2012 (Sept) – (Current) Dr. Mark Swenson (FNMOC) WG/OD 2005–2007 Mike Matson (NESDIS) [Satellite] 2005–2008 CoChair Jon Whiteside (AFWA)] 2007–2008 CoChair Gary Petti (NESDIS)] 2008 (Oct) – 2011 (May) CoChair Brad Ballish (NCEP) [Conventional] 2008 (Jun) – 2011 (May) CoChair Jim Vermeulen (FNMOC) [Satellite] 2011 (Jun) – (Current) CoChair Kyle Rushing (NAVO) [Conventional] 2011 (Jun) – (Current) CoChair Dennis Hobson (AFWA) [Satellite] 11

12 Questions / Discussion 12