Queensland Industrial

Slides:



Advertisements
Similar presentations
Resource corridors: A case study of the Pilbara, Australia Ian Satchwell World Bank Group and AusAID Sponsored Pre-Mining Indaba Event, 4 February 2013.
Advertisements

Murray River Project Update Coal Forum October 2013.
Subsidised Studies – BOOTs and All Mark Berger – Director E+PC Engineering & Projects Company Limited South Africa Canada – South Africa Chamber of Business.
Department of Employment, Economic Development and Innovation Queensland LNG Industry Snapshot May 2011.
The Hon. Kon Vatskalis Minister for Mines & Energy.
Slide 1 ASX Code: OMH Website: OMH – An Overview Accessing Land for Mineral Exploration in the NT 6 June 2006.
Mining in Latin America Ralph Lutes, Vice President, Asia, Executive Director & General Manager, Teck China October 22, 2014.
World’s largest undeveloped tin deposit in Kazakhstan.
Royalties for Regions – Information Briefing 10 October 2014 Presenter:David Horton Chief Operating Officer.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
MBA (Trimester) Term V Module Title : Project Finance and Management
Current Trends in Mining Finance: Strategic and Financial Challenges Roy Hinkamper, KPMG LLP April 2013.
What do we hope to learn? What are the characteristics of a corporation? What are the four basic financial statements? What information does each statement.
Chapter 17 Auditing the Investing and Financing Cycles Spring 2007.
ELDERS MEETING NGURUPAI (HORN ISLAND) 13 JUNE 2015.
Engineering Technology Division
Presentation to the Public Discussion Forum on Mining taxation in Zambia 22 June 2010 By Frederick Bantubonse General Manager.
CHAPTER 2 Financial Statements and Accounting Concepts/Principles.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Coal Exploration Projects Queensland Exploration Council Investor Forum - March 2014.
REVISION FOR GRADUATION EXAM CORPORATE FINANCE. FINANCE EXAM STRUCTURE 30 MCQs x 1 mark = 30 marks 3 Short Answer Questions (8+8+9) = 25 marks 3 Calculation.
A Typical Business Plan
LEVERAGED BUYOUTS (LBOs) Prepared by: BRENDA E.PALAD Reference: Investment Banking by Joshua Rosenbaum (WILEY-FINANCE)
Apollo Minerals Limited Iron ore and base metals in Australia and Africa Apollo Minerals (ASX: AON) is a minerals exploration company focused on identification,
International Coal Conference Presentation by Mr Bradley Green Managing Director Australasian Continental Energy October 2011 version 1.0.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Heritage Gold NZ Limited Presentation AGM 23 September 2010 …..unlocking value.
Town Of Douglas A Review of the Town’s Proposed Tax Incentive Financing (TIF) Agreement With American Pro Wind, LLC Presented To The Douglas Finance Committee.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Cost Segregation Study Proposal Overview Analysis ABC Company.
ABOUT SCORE SCORE - Service Corps of Retired Executives SCORE - Service Corps of Retired Executives Volunteer group works with SBA as counselors to America’s.
Queensland - Overview Population – 4.56 million Land – million square kilometres (just over 3x size of France!) GSP – $A258 billion Capital City.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
Production Planning Group 4 Claudia· David· Lisa· Shakeia· Vicky.
22ha site suited for industry & logistics GUGESTI, ROMANIA:
Annual Report Nissan Motor Co., Ltd. Scott Nelson ACG2021 sec 080.
1 Generations Bancorp. Inc.. 2 Executive Management Gregory P. Kolton, Chairman, President, CEO 35 years of banking experience President/CEO of CIB Marine.
HANCOCK PROSPECTING Hope Downs Iron Ore Project The Current Status 7 th Annual Global Iron Ore & Steel Forecast Conference Perth, 2004 Russell Tipper –
1 Public hearing on conditional grants and capital expenditure: 3rd quarter Presentation to Select Committee on Finance Northern Cape’s Department of Agriculture.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Sustainable public transport – electric transport development project for the capital.
Mining Economics Minnesota Minerals Education Workshop June 16, 2015 By Peter Clevenstine Division of Lands & Minerals Department of Natural Resources.
Dr. Mohamed Riyazh Khan DoMS
Confidential & Proprietary Internal Kaplan Use Only. CAPITAL PROJECT ANALYSIS Unit 7.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
Copper Bay Limited Presentation March Copper Bay Limited – Investor Presentation – March Overview  A Chilean-focused resources company 
Construction in Vietnam – Key Trends and Opportunities to 2018 Market Research Report ©reportscue.
Erdeneburen HPP Project Implementation Unit
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
1 UK/Europe September 2003 The Tampakan Project. 2 INDOPHIL-THE COMPANY Market Listed ASX (IRN) Share price $ Aug 2003 Capitalization $47 M Capital.
Various Types Of Mining. Defining Mining Mining is the process of extracting essential mineral ores or geological substances of great value from rocks.
Operating Budgets: Non-Manufacturing Budgets
Accounting: The Language
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
Section 1: Functions of Accounting and users of accounting information
Phase 3 Solar Feasibility Study Findings and Recommendations
Environmental Upgrade Agreements
Ensham Mine The Last Five Years and The Next Five
Santos – upstream developments
COMMUNITY UPDATE OCTOBER 23, 2013
Environmental Requirements and planning grants
Fy16 earnings update 12 August 2016.
Presentation transcript:

Queensland Industrial Minerals Holdings Ltd Project Development Plan

QIMH Development Plan Queensland Industrial Minerals Holdings Ltd QIMH Prepared in October 2014

Company Structure Queensland Industrial Minerals Holdings Ltd (QIMH) An unlisted public company 100% ownership of Queensland Industrial Minerals Pty Ltd (QIM) An operating entity 100% ownership of 100% ownership of 3

Non- Executive Directors The Board of Director Chairman & Director David Li Non- Executive Directors Felix Cheung Harry Mavrolefterou Yi Wei Shi Company Secretary Tony Tao Ian Mitchell 4

Tenement 5 EPM 13278 Size: 77.6 km2 Date Granted: 06 March 2001 Minerals Sought: All Minerals other than coal Location: 25km SE of Mount Perry Town MDL 355 Size: 15.47 km2 Date Granted: 01 August 2004 Minerals Sought: Ilmenite, Feldspar, Apatite, Zircon, Iron-Magnetite, Corundum, Rutile and Scandium Location: 25km SE of Mount Perry Town MLA 80116 Size: 14.97 km2 Term Sought: 50 Years Minerals Sought: Ilmenite, Feldspar, Apatite, Zircon, Iron-Magnetite, Corundum, Rutile and Scandium 5

Development Overview Development Overview Environmental Impact Statement (EIS) was lodged on 05 April 2013. CHMP was approved by QLD Government on 03 September 2014. EIS was approved and Draft EA (MLA 80116) was received on 19 September 2014 Mining Lease Application (MLA 80116) is to be approved in due course in accordance with statutory timeframe. MLA 80116 Underlying Land Parcel - Native Title extinguished New drilling program is started in Northern tenement. 6

Construction & Mining Plans Construction Plan Mine Construction expects to commence in 2015. High Level Process Plant Design is completed and verified by independent third party expert. Detailed modular plant has been confirmed. Plant & Equipment suppliers have been identified. Capex ranges have been verified. Potential EPC has been identified. 7

Plant & Infrastructure Construction Plan Plant & Infrastructure Design Document Generation Detailed Design Tender Packages & Procurement & Construction Commissioning & Operation Mine & Infrastructure Detailed Mine Design Mine Schedule Waste Management Plan Procurement & QA Mining 8

Mine Plan 9

Mining & Backfilling Sequencing 10

Investment Highlights ASX Listing Plan Investment Highlights IPO – BBY Lead Manager for ASX Listing Australia’s largest independent stock broker Significant high grade JORC Resource 69Mt JORC classified resource @ 5.1% Upside from Additional Resource Drilling in the contiguous northern section indicate significantly higher resources at higher yields. Initial estimates indicate a further 40Mt of additional resource. Low Cost Operation Minimal overburden with no drilling and blasting required Simple Processing Flow sheet 11

Investment Highlights ASX Listing Plan Investment Highlights Close Proximity to Existing Infrastructure (1) Located next to the Burnett River (2) 150km to Port of Bundaberg for shipment (3) 2 economical routes to be chosen to haul without further refurbishment. Advanced Regulatory Approvals Expected Strong Cash flows & Investor Returns (1) NPV of $25M before capital raising (2) Expected potential IRR over 60% (3) Expected Payback period less than 3 years Attractive Discount for Pre-IPO Subscription 12

Port Access & Facilities Key Infrastructure   Power Road Access 4 Port Access & Facilities Water 1 2 3 13

Power KMS-1000KW C2G Diesel Generator Set is equipped with Cummins KTA38-G9 diesel engine made by CCEC Cummins Engine Company, Ltd. as original power. It is consisted of three-phase pure copper brushless AC alternator. Cummins 1000KW C2G DIESEL GENERATOR SET Besides Solar Power, a KMS-1000KW DIESEL GENERATOR SET will be our power alternative before the Government's power line stretched into out sites a few years later. 14

Water 15

Road Access Northern route to Bundaberg port - 150km The most economical route is travelling north from the site to Bundaberg Port by road via Mt Perry and GinGin. 16

Port Access & Facilities Memorandum of Understanding has been signed with Queensland Sugar Limited (Port facilities owner) and Port authority in term of the utilisation of Bundaberg BST Shiploading Facilities for mineral sands exports and land for further development. QIMH will have privilege to its loading facilities and indoor pile sites. 17

Wateranga Project Sydney 18