DESIGN & CONSTRUCT CONTRACTS for MUNICIPAL SWIMMING POOL PROJECT DELIVERY GOOD? BAD? OR VERY UGLY? J.H. Cockerell Pty Ltd.

Slides:



Advertisements
Similar presentations
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
© Hyder Consulting Pty Ltd Local Government Waste Summit 2006 Total Cost Approach for Waste Management Christine Wardle 10 February 2006.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Managing and Negotiating Change Orders Presented by Daniel Williams, P.E. May 1, 2008.
How You Can Sell Your Home in Just 14 Days & for $20,000 More Than Today’s Market Value.
Client's aspirations, briefing and alignment of needs both within the client organisation and throughout the supply chain.
By Construction People for Construction People CONSTRUCTION SOFTWARECONSTRUCTION SOFTWARE CATPlan for Consultants CAT Plan is a web based document management.
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
March 25, The Blundellsands Surgery Patient Reference Group Questionnaire Results Monday, March 25 th 2013.
CONSTRUCTION AND MAINTENANCE DEPARTMENT THE DRY DEPARTMENT PRESENTED BY HELLEN N. KARU University of Nairobi 1.
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
Design Research Intelligent questioning for effective designs.
Lancaster County Replacement Facility Development Strategy Presented by: CGL Capital Solutions May 19, 2011 A World of Solutions.
ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
Contract strategy Traditional ApproachIncreasing Traditional ApproachIncreasing Accelerated Traditionalintegration Accelerated Traditionalintegration.
Presentation Roadmap Maintenance Contract Model Options
EM15 – Contractors COST MANAGEMENT
KRW 116 trillion invested in 2008 (14% of GDP), 1.82 million jobs created (8% of total employment) Overseas construction has been the key source of.
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Nepenthe Update on Finances Board of Directors Meeting Nov. 30, 2009.
Library Services Review Update on consultation 10 th January 2013.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
Setting Service Levels- A simple task or a major challenge in Asset Management? Kevin Young Hunter Water Corp. 11 April 2002.
1 Smart Public and Private Procurement Lukáš Klee for BCC in CR Procurement in the construction sector and the use of FIDIC contracts British Chamber of.
Payment Mechanisms for PPP Development off PPP and Implementation Possibilities in Latvia Conference, September 2008.
WASH cholera / AWD EP&R training Key responses – Water Water treatment and Priorities in Different Settings Session 3.2 WASH Cholera / AWD EP&R training.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Peering Policies - When to Peer, When not to Peer Quilt Peering Workshop October 2006 St Louis, Missouri.
HAVING YOUR SAY Scottish Procurement Directorate Joint Improvement Team and Learning Disability Alliance Scotland.
Chapter 8: Automobiles and Other Major Purchases.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
School Journeys Planning for the not so unexpected Nic Carstens Corporate Health and Safety Tel:
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
Developing a Mindset to Successfully Operate Onsite Pumping, and Operations & Maintenance Services 01/17/2014.
© CT Management Group Pty Ltd 2015 Municipal Association of Victoria Rate Cap Forum 25 th November 2015 Ian Mann CT Management Group
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
What you need to know about handling major school works 5 th July 2013.
Normanton/Karumba WTP Upgrade Matt Fanning Director TBG Pty Ltd.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Procurement Analysis & Reporting Tools John M. Finney, C.P.M., County of Sacramento, Department of General Services, Contract & Purchasing Services Division.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Optimising Stormwater Management BH:
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Fall CS-EE 480 Lillevik 480f06-l9 University of Portland School of Engineering Senior Design Lecture 9 Project management Project plan Change request.
CONREPNET Performance based rehabilitation of reinforced concrete structures Members workshop – London – 24 & 25 April 2006 The present and future in concrete.
Grey Owl Municipal Water feasibility study
Creating/managing an investment portfolio
Roles and responsibilities PM
Sunset Review of the Public Health and Wellbeing Regulations 2009
Chapter 19 The American Economy.
Department of Water Management Water Supply Update
Contract Award Procedures
Designing Resilient Bridges:
Updating Capital Asset Records
PROJECT DELIVERY METHODS
Treatment – Ion Exchange Filters
Back Ground Information
Progress on the Bucket Eradication Programme
Presentation transcript:

DESIGN & CONSTRUCT CONTRACTS for MUNICIPAL SWIMMING POOL PROJECT DELIVERY GOOD? BAD? OR VERY UGLY? J.H. Cockerell Pty Ltd

1.Condition of Existing Municipal Pools? 2.Why choose D & C? Cost Control. Quality Control. Speed to completion of construction. 3.Our experience with D & C Projects?

J.H. Cockerell Pty Ltd Well Designed + Well Constructed Municipal Pools (with formed concrete walls) 50 year useful life. minimum running costs. minimum maintenance costs. mid-life refit of pool water treatment plant. healthy experience for bathers. CONDITION OF EXISTING MUNICIPAL POOLS

J.H. Cockerell Pty Ltd Qld Council Pools have significant problems (likely to be Australia wide) reported on every 2 to 3 weeks by our office. increasingly those pools are only 10 to 12 years old. Council & Community left with a liability. CONDITION OF EXISTING MUNICIPAL POOLS

SET THE SCENE J.H. Cockerell Pty Ltd Wetdeck Pools are now popular -right choice for next 50 years. -max. allowable pool movement ± 2mm for 50 years. -if pool movement exceeds ± 2mm → stagnant water. -no permanent fix for pool movement in expansive clays. Why are Municipal Pools performing so poorly? CONDITION OF EXISTING MUNICIPAL POOLS

J.H. Cockerell Pty Ltd Large range of pool water treatment options Filters- Sand- Gravity - Medium Rate - High Rate - Large number of manufacturers - Diatomaceous Earth - Different media - Local or overseas manufacturer - Cartridge - Large number of manufacturers Difficult to make the correct choice? Why are Municipal Pools performing so poorly? CONDITION OF EXISTING MUNICIPAL POOLS

J.H. Cockerell Pty Ltd Large range of pool water treatment options Disinfectants -Chlorine Gas -Sodium Hypochlorite -Calcium Hypochlorite -Chlorinated Isocyanurates -Chlorine Dioxide -Bromine based Disinfectants -Ozone -UV Difficult to make the correct choice? Why are Municipal Pools performing so poorly?

J.H. Cockerell Pty Ltd Lack of specialist pool engineers -no university course. -no one book. -knowledge accumulated over a long period of time. State Government Purchasing Guidelines →Cheapest usually chosen by Councils State Government chooses their Pool Engineer for important facilities. Why are Municipal Pools performing so poorly? CONDITION OF EXISTING MUNICIPAL POOLS

J.H. Cockerell Pty Ltd -Qld State Government action? -LOCAL COUNCILS MUST MAKE THE RIGHT CHOICES! (i.e. Choice of Specialist Pool Engineer for their pools). How can Councils & Communities avoid pools with serious problems? CONDITION OF EXISTING MUNICIPAL POOLS

J.H. Cockerell Pty Ltd WHY CHOOSE D & C Cost Control Quality Control Speed to completion of construction Will D & C Contracts improve one or several of the following?

J.H. Cockerell Pty Ltd COST CONTROL 1.Facility Construction Costs -Design + Documentation + Construction Inspections (for all consultants approx. 10% of project cost). -Construction (approx. 90% of project cost). 2.Facility Pool Running Costs for 50 year life of pool -$1m for small 25m pool. -$2m to $3m for 50m pool. 3.Facility Pool Maintenance/Repair Costs for 50 years? -Repair costs = construction cost after 12 years. -Repair costs often > $100,000.

J.H. Cockerell Pty Ltd COST CONTROL OBSERVATIONS 1.Design + Documentation + Construction Inspection Cost. Smallest of all costs. If well done→Will reduce other whole of life costs. →Will provide Council & Community with an Asset not a Liability.

J.H. Cockerell Pty Ltd COST CONTROL OBSERVATIONS 2.Builder controls D & C Tender process. →Will only provide to requirements of project brief. →Contract Cost is builder’s focus not Whole of Life Cost. →Design + Documentation + Construction Inspection just another cost to be minimised. →Engineer’s design required for lump sum D & C. →Engineer’s design cost risk if builder is not chosen. →Sprayed concrete pools - easy to design (i.e. cheap). -poor quality control (i.e. < 50 year life & e expensive repairs).

J.H. Cockerell Pty Ltd COST CONTROL CONCLUSIONS D & C Project Cost Savings = Poor Design Choices. Poor Design Choices→Pool’s useful life < 50 years. →Increased pool repair costs. →Increase pool running costs. →Pool becomes a Liability for the Community instead of an Asset.

J.H. Cockerell Pty Ltd WHY CHOOSE D & C Cost Control Quality Control Speed to completion of construction Will D & C Contracts improve one or several of the following?

J.H. Cockerell Pty Ltd QUALITY CONTROL Quality of completed pool depends on: 1.Quality of project brief – important 1 st step 2.Builder & his Engineer’s interpretation of the project brief who checks that interpretation on each D & C tender? who checks the engineer’s capability on each D & C tender? 3.Quality of construction who checks builder’s workmanship during construction? Engineer’s site inspections are very important (e.g. Winton Pool) -expensive in remote locations. -minimised to win D & C contract.

J.H. Cockerell Pty Ltd QUALITY CONTROL OBSERVATIONS 1.Project briefs hopelessly inadequate – too many pool variables. 2.Councils typically choose the lowest tender because -unable to differentiate between quality of tenders. -have little or no experience in municipal pool projects (i.e. only happens every 10 to 20 years).

J.H. Cockerell Pty Ltd QUALITY CONTROL CONCLUSIONS Reduced Quality Control because Builder will provide: -minimum required by the project brief. -little or no quality control of construction. -a design engineer who has little and sometimes no experience.

J.H. Cockerell Pty Ltd WHY CHOOSE D & C Will D & C Contracts improve one or several of the following? Cost Control Quality Control Speed to completion of construction

J.H. Cockerell Pty Ltd SPEED TO COMPLETION OF CONSTRUCTION Regional Council’s Program for D & C of 50 metre pool project Oct to Dec 2010 → Write & Review D & C Brief. Jan 2011 → Tender Period. Nov 2011 → Complete construction. D & C chosen in an effort to complete construction by Nov 2011.

J.H. Cockerell Pty Ltd SPEED TO COMPLETION OF CONSTRUCTION OBSERVATIONS 1.Takes at least 3 to 4 months to design & document a pool project On this project design & document phase reduced to tender period of 3 to 4 weeks. -quality control risks. -insufficient information for accurate costing →tender cost increase to cover this risk.

J.H. Cockerell Pty Ltd SPEED TO COMPLETION OF CONSTRUCTION OBSERVATIONS 2.Little or no time saved by replacing 3 to 4 month Design & Documentation with 3 months to write D & C Brief.

J.H. Cockerell Pty Ltd SPEED TO COMPLETION OF CONSTRUCTION OBSERVATIONS 3.Takes more than 10 months to construct 50 metre pool. -indicates Council is receiving advice from someone who is inexperienced. 4.January is not a good month for tendering. -most construction contractors close down between Christmas & end of January.

J.H. Cockerell Pty Ltd WHY CHOOSE D & C OVERALL D & C CONCLUSIONS 1.Any Cost Savings will be more than offset by Reductions in Quality. 2.Cost increases likely due to lack of time to design & document project. 3.Quality Control of design & construction usually ignored →reduced pool design life + increased running & repair costs. 4.Little or no savings in time to project completion.

J.H. Cockerell Pty Ltd OUR EXPERIENCE WITH D & C PROJECTS 1.Pool proposed for Inglewood before Council amalgamations -Asked to review Council’s preferred Tender. -Inadequate D & C Brief.

J.H. Cockerell Pty Ltd OUR EXPERIENCE WITH D & C PROJECTS 2.Pool for Buderim (Maroochy Shire Council) -Asked to review tenders submitted. -Inadequate D & C Brief to allow meaningful cost comparisons (one of D & C’s basic problems for special projects).

J.H. Cockerell Pty Ltd OUR EXPERIENCE WITH D & C PROJECTS 3.Brisbane Private School -An old boy of the school wanted to give something back to the school. -Approx. 4 years after completion of construction we were asked to advise on the pool’s problems. -Inexperienced Builder & inexperienced Engineer.

J.H. Cockerell Pty Ltd OUR EXPERIENCE WITH D & C PROJECTS 4.Others but insufficient time. Happy to talk later.

J.H. Cockerell Pty Ltd FINAL COMMENT For projects involving pools never appoint an Architect to then select other consultants. Architects will typically charge 6% of project construction costs most of which are pool costs. To keep Consultants Fees within budget Architect has to choose a cheap pool engineer.