Power Grid Reinforcement Fall Presentation Team 9b: – Jon Brown – Kyle Reininger – Alan Myers – Karl Homburg – Dan Sinnott.

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

Questions about AVR & PSS
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
PER
Sistan & Balouchestan Electric Power Distribution Company
Mark Williams Facilities Engineering Manger Mike Joyner Project Manager - Power Services.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
1 Team BUSS Backup Storage Source. 2 Team BUSS Backup Storage Source EHV Substation Second DC Storage Source Sponsor Idaho Power Company Team Members.
Improving Reliability and Performance of Electric Power Grids by Using High Performance Computing Eugene A. Feinberg Department of Applied Mathematics.
1 PS ERC Reactive Power and Voltage Control Peter W. Sauer Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
Power Engineering Society Chicago Chapter Reactive Power: Sources and Solutions 12 February 2003 David E. Mertz, PE Burns & McDonnell Engineers, Inc.
1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the.
Power Factor and Power Factor Correction
Lesson 27 Power Factor Correction
Power Factor: What Is It and Estimating Its Cost Presented by:Marc Tye, P.E APPA Business & Financial Conference September 21, 2004.
Distributed Power Systems ELCT 908
Three-Phase ac Voltage Generation
AUTOMATIC CONTROL SYSTEM FOR VOLTAGE AND REACTIVE POWER REGULATION IN ACTIVE-ADAPTIVE GRID OF POWER CLUSTER “ELGAUGOL” Alexander Voloshin Ph.D., LYSIS.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Circuits II EE221 Unit 4 Instructor: Kevin D. Donohue Complex Power, Power Conservation, Power Factor Correction, and Applications.
Supervisory Systems.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Copyright © 2013 Rockwell Automation, Inc. All Rights Reserved.Rev 5058-CO900E PUBLIC INFORMATION L19 - Combining the Latest Rockwell Automation® Hardware.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Power System 2002 Conference: Impact of Distributed Generation CLEMSON UNIVERSITY ELECTRIC POWER RESEARCH ASSOCIATION 1 Distribution Capacitor Placement.
HomeNextPrevious I. INTRODUCTION II. WIND TURBINE GENERATOR MODEL III. STATCOM MODEL IV. SIMULATION RESULT CONTENTS OF TOPIC V. CONCLUSION Previous HomeNextHomePreviousNextHome.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
1 Impact of Distributed Generation on Voltage Profile in Deregulated Distribution Systems By: Walid El-Khattam University of Waterloo, Canada
Peak RCCo Performance Metrics Draft –November 2013.
Circuits II EE221 Unit 11 Instructor: Kevin D. Donohue Complex Power, Power Conservation, Power Factor Correction, and Applications.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
FUNDAMENTAL OF ELECTRICAL POWER SYSTEMS (EE 270)
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Nodal Planning Go Live Austin, TX February 3, 2011
Announcements Please read Chapter 6
GC0104 – Demand Connection Code (DCC)
Sub Station.
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
“Electricity Supply Reliability Project - Additional Financing”
ISO New England System R&D Needs
ECEN 460 Power System Operation and Control
Introduction To Reactive Power
POWER SYSTEM ANALYSIS INTRODUCTION.
DEC System Voltage Planning - June 2018
ECE 333 Green Electric Energy
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ELL100: INTRODUCTION TO ELECTRICAL ENGG.
ECE 576 Power System Dynamics and Stability
Prepared by: Ismael K. Saeed
Presentation transcript:

Power Grid Reinforcement Fall Presentation Team 9b: – Jon Brown – Kyle Reininger – Alan Myers – Karl Homburg – Dan Sinnott

Introduction What is the role of the transmission system? The transmission system transfers electric energy in bulk from generating plants at various locations to the load centers. Why is this project important? With deregulation imminent, new transmission systems have to be highly reliable and cost effective.

Project Definition The Mecosta area has been experiencing low voltage problems during heavy load conditions. A capacitor bank has been added to the Mecosta 138 kV substation to temporarily fix the load voltage problems. This short term remedy, yet slightly helping heavy load conditions, will not support the system during a single outage. This increase in load will lead to major overloading problems if the system is not upgraded.

Project Tasks Improve the 2004 base case provided to us by consumers energy Generate solutions to improve the base case using PTI’s PSS/E (a power flow simulation program) Given certain factors, choose the best solution

The six Commandments of Transmission I. Real and reactive power flow II. Economics III. Stability IV. Interchange capability V. Reliability VI. Environmental impact

Design Objectives Review current and future problems Correct these problems by simulation, using PTI’s PSS/E power flow program Develop solutions that will maintain system stability during a unforeseen problem Develop solutions that will provide the customer with high quality reliable power, yet at a low cost

Standards & Specifications Equipment loading should not exceed 100% of it’s normal rating. According to FERC Form 715, Voltages on the EHV network should be between 0.97 & 1.05 during normal conditions. Following the minimal acceptable voltage rules given to us by Consumers, during either emergency or normal conditions.

Current Work Used Aspen Power Flow to generate an understanding of system loading problems Generated 3 possible solutions with PTI’s PSS/E to fix the loading problems Looked at each solution on a basis of the standards and specifications given on the previous slide.

Possible Solutions 1. Added a line from Clare Jct. (164) to Mecosta (450). Removed line between Mecosta and Croton (280). 2. Removed capacitor bank at Mecosta (450). Added a line from Clare Jct. (164) to Ohman Rd. Jct. (490). 3. Removed capacitor bank at Mecosta (450). Added a line from Ohman Rd. Jct. (490) to Wexford (693).

Upcoming Work Develop better solutions using more accurate mathematical methods. Obtain actual impedance values of lines using base values of: – S base = 100,000,000 VA – V base = 138,000 V – I base = A – Z base = 

Upcoming Work - continued Create CAD drawings showing the possible solutions. Look at each solution on a basis of: - engineering standards & specifications. - cost of implementation. - environmental factors. Narrow all of our solutions down to one solution, considering our 6 commandments of transmission. Actual system design: Capacitor banks, Transformers, Lines

Estimated Budget Income: Carryover$ Student Fees$ Total Income:$ Expenses: Supplies$ Miscellaneous$ Travel$ PTI Software$ Total Expenses:$ % Overhead:$ Balance:$150.00