“AN INVESTIGATION INTO THE TECHNICAL DESIGN, TRANSIENT STABILITY STUDIES AND MODELLING ISSUES FOR LAND BASED WF INTO SMALL ISLAND GRID" Presented by Rohan.

Slides:



Advertisements
Similar presentations
RES-E Impact on Transmission Grid and Power System Reserves
Advertisements

Study Committee Representatives Annual Report December, 2012
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Wind Turbine Session 4.
What do you think about this system response? Time Rotor Angle.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Smart Grid Applications: Viewpoint of an Electrical Power Engineer Francisco de Leon October 2010.
Wind Turbine Generators
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
1 Distributed Generation and Power Quality. 2 Distributed Generation Distributed generation (DG) or distributed generation resources (DR) –Backup generation.
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
System Strength Discussion
Hybrid Offshore-wind and Tidal Turbine (HOTT) Energy Conversion II (6-Pulse GTO Rectifier DC connection and Inverter) Mohammad Lutfur Rahman Yasuyuki Shirai.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Power Systems Consulting and Software 4 March 2004 BWEA Conference: UK Offshore Wind 2004 Integration of Offshore Wind Farms into the Local Distribution.
1. Large wind farms are typically located where good wind resources exist, and are often far away from the main load centres and strong AC network connections.
Importance of advanced simulations of electrical system in wind turbines April 2010.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
POWER FACTOR CORRECTION
Design Process Supporting LWST 1.Deeper understanding of technical terms and issues 2.Linkage to enabling research projects and 3.Impact on design optimization.
1 11 A review of wind energy technologies part two. Adviser : Dr. Yuan-Kang Wu Student : Po-Kai Lin Date :
HomeNextPrevious I. INTRODUCTION II. WIND TURBINE GENERATOR MODEL III. STATCOM MODEL IV. SIMULATION RESULT CONTENTS OF TOPIC V. CONCLUSION Previous HomeNextHomePreviousNextHome.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
21 st May 2015 SMARTGREENS 2015 Lisbon, Portugal Lane Department of Computer Science and Electrical Engineering West Virginia University Analyzing Multi-Microgrid.
Connection of Wind Farms to Weak AC Network Marian Piekutowski Hydro Tasmania, Australia 30 May 2013.
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
Overview What is a weak system? Useful metric to identify weak systems: SCR What could possibly go wrong? Is a weak system so bad? What can you do? Risk.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Conclusions Innovative application of induction and synchronous generators in autonomous small hydropower plant Prof. M.T.E. Kahn NeuroMorphoGenics/NMG.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye University of Illinois at Urbana-Champaign 1 Lecture 23: Renewable.
Voltage grid support of DFIG wind turbines during grid faults
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
SLIDE 1 ISSUES AND PRACTICAL EXPERIENCES WITH CONNECTION OF WIND FARMS TO WEAK AC NETWORKS June 2013 PRESENTED BY BABAK BADRZADEH.
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
MODELING AND SIMULATION OF WIND TURBINE –DOUBLY FED INDUCTION GENERATOR (WT-DFIG) IN WIND FARM USE MATLAB/SIMPOWERSYSTEM Student : TRUONG XUAN LOC.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
1 An Overview of Power Quality Problems In Transportation and Isolated Power Systems Paulo F. Ribeiro Calvin College / BWX Technologies, Inc Grand Rapids,
Steady State Analysis Of A Microgrid Connected To A Power System
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Control Engineering. Introduction What we will discuss in this introduction: – What is control engineering? – What are the main types of control systems?
Full Converter Wind Turbine Operating under Weak Grid Conditions Daniel Mueller, Walter Kuehn Frankfurt University of Applied Sciences Germany 1.
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
Power Quality By Using FACTS. CONTENTS INTRODUCTION WHAT IS FACTS? FOR WHAT PURPOSE FACTS ARE USED? BASIC TYPES OF FACTS CONTROLLERS BENEFITS OF UTILISING.
Overview OF MULTI Mega Watt WIND TURBINES and wind parks
KAIST NUCLEAR & QUANTUM NICIEL SEMINAR 1 / 20 A Feasibility Study on Application of Synchronous Condenser for PFC to Domestic Power System of Nuclear Power.
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
SIMULATION AND IMPLEMENTATION OF FC-TCR
IG BASED WINDFARMS USING STATCOM
Control Schemes for Distribution Grids with Mass Distributed Generation AUTHOR: UMAIR SHAHZAD.
Wind turbine technology
Introduction To Reactive Power
Project WECC-0100 Update Load Modeling Task Force
POWER SYSTEM ANALYSIS INTRODUCTION.
EU-IPA12/CS02 Development of the Renewable Energy Sector
Mid-Continent Area Power Pool
UNIT V STABILITY ANALYSIS 9
Interconnection of AES With The Grid
Grid integration and stability of 600MW windfarm at Kriegers Flak
Sami Repo Tampere University of Technology FINLAND
FREQUENCY CONTROL-THE UNEXPLOITED GOLD
Ilkka Jokinen Taavi Heikkinen
Project WECC-0100 Update Load Modeling Task Force
Presentation transcript:

“AN INVESTIGATION INTO THE TECHNICAL DESIGN, TRANSIENT STABILITY STUDIES AND MODELLING ISSUES FOR LAND BASED WF INTO SMALL ISLAND GRID" Presented by Rohan R.V Seale

PROJECT OBJECTIVES : Develop grid connection requirements and standards for BLPC that will permit the development and operation of an efficient, safe, reliable and well coordinated transmission grid system.Develop grid connection requirements and standards for BLPC that will permit the development and operation of an efficient, safe, reliable and well coordinated transmission grid system. Investigate the power quality impact of wind farm on BLPC network.Investigate the power quality impact of wind farm on BLPC network. Perform relevant Transient studies to assess the impact due to 24 kv Wind Farm connection on island grid.Perform relevant Transient studies to assess the impact due to 24 kv Wind Farm connection on island grid. Assess the overall protection, design and SCADA requirements for integration of a land based wind farm into a small island utility.Assess the overall protection, design and SCADA requirements for integration of a land based wind farm into a small island utility.

BACKGROUND INFORMATION CONNECTION OF WF TO NORTH SUB. CONNECTION OF WF TO NORTH SUB. NORMALLY WEAK CONNECTION -POTENTIAL LOW VOLTAGE AT DIST. LEVEL NORMALLY WEAK CONNECTION -POTENTIAL LOW VOLTAGE AT DIST. LEVEL RADIAL LINE WITH SINGLE OHL FEED RADIAL LINE WITH SINGLE OHL FEED SECOND UG CABLE FEED DUE IN 2007 SECOND UG CABLE FEED DUE IN 2007 ADDITIONAL 2 X 132 KV UG CABLES ADDITIONAL 2 X 132 KV UG CABLES POTENTIAL GEN. SITE DEVELOPMENT IN NORTH- ADDITIONAL 4 x 20MW (2009) POTENTIAL GEN. SITE DEVELOPMENT IN NORTH- ADDITIONAL 4 x 20MW (2009)

REGENCY PK. 175km of transmission lines 175km of transmission lines REGENCY PK. 175km of transmission lines 175km of transmission lines 3,828km of distribution lines 3,828km of distribution lines REGENCY PK. Existing Facilities

BLPC TRANSMISSION SYSTEM

ADVENT OF WT GENERATION Wind generators connect to both the distribution & transmission networks. Wind generators connect to both the distribution & transmission networks. An emerging set of renewable energy generation is under construction or in planning phase in Caribbean. An emerging set of renewable energy generation is under construction or in planning phase in Caribbean. The transmission & distribution systems will require selective reinforcement to support the volume of renewable generation being planned. The transmission & distribution systems will require selective reinforcement to support the volume of renewable generation being planned. The technical connection requirements for generators connecting to the transmission or distribution systems are set out in Industry Codes and Intl. Standards. The technical connection requirements for generators connecting to the transmission or distribution systems are set out in Industry Codes and Intl. Standards. Framework agreements set out obligations and contractually binding arrangements between generators & Utilities. Framework agreements set out obligations and contractually binding arrangements between generators & Utilities.

ELEMENTS OF SYSTEM OPERATION SYSTEM OPERATION SECURITY OF SUPPLY DYNAMIC STABILITY FREQUENCY CONTROL RESERVE CAPACITY SYSTEM VOLTAGE

INTERNATIONAL STANDARDS The status of the IEC standards is provided in Table I. Table I IEC Wind Energy Standards WorkingTitlePurposeDocument Number Group WG-1Safety RequirementsPrincipal standard defining designIEC * WG-2 for Largerequirements WG-3 Wind Turbines WG-4 Small Wind TurbinePrincipal standard defining designIEC * Systemsrequirements for small turbines WG-6 Performance Measurement Techniques Defines performance measurement techniques IEC * WG-7 Revision of IEC Edition 2 of IEC Ed2 WG-8 Blade Structural TestingDefines methods for blade structural testing WG-9 Wind Turbine Certification Requirements Defines certifica tion requirements (Harmonized version of several European standards.) WG-10 Power QualityDefines power Measurementsquality measurement techniques *Published Standard

International Standards Cont’d G59/1 - Recommendations for The Connection of Embedded Generating Plant to The Public Electricity Suppliers’ Distribution Systems (1991) ( ≤20kV, ≤5MW ) G59/1 - Recommendations for The Connection of Embedded Generating Plant to The Public Electricity Suppliers’ Distribution Systems (1991) ( ≤20kV, ≤5MW ) >20kV≥5MW G75/1 - Recommendations for the connection of embedded generating plant to public distribution systems >20kV or with outputs ≥5MW G 83/1 – Recommendations for connection of Small Scale EG (<16 A per phase) in parallel with LV Dist. Network G 83/1 – Recommendations for connection of Small Scale EG (<16 A per phase) in parallel with LV Dist. Network

IEEE P STANDARD Influential standard for interconnection of all forms of DR is IEEE , Standard for Interconnecting Distributed Resources with Electric Power Systems. Influential standard for interconnection of all forms of DR is IEEE , Standard for Interconnecting Distributed Resources with Electric Power Systems. IEEE 1547 is the result of a recent effort by SCC21 to develop a single interconnection standard that applies to all technologies. IEEE 1547 is the result of a recent effort by SCC21 to develop a single interconnection standard that applies to all technologies. IEEE 1547 addresses all types of interconnected generation up to 10 MW. IEEE 1547 addresses all types of interconnected generation up to 10 MW. The 1547 standard has benefited greatly from earlier utility industry work documented in IEEE and IEC standards (ANSI- C37 series for protective relaying) The 1547 standard has benefited greatly from earlier utility industry work documented in IEEE and IEC standards (ANSI- C37 series for protective relaying)

RECENT CHANGES TO USA GRID CODE (AWEA): Low voltage ride-through (LVRT) capability for wind plants and wind turbines: AWEA recommended adoption of an LVRT requirement developed by E.ON Netz. This is a German grid operator faced with a significant and growing penetration of asynchronous wind generation on the German grid. This standard requires that the machine stay connected for voltages at the terminals as low as 15% of nominal per unit for approximately 0.6 s. Low voltage ride-through (LVRT) capability for wind plants and wind turbines: AWEA recommended adoption of an LVRT requirement developed by E.ON Netz. This is a German grid operator faced with a significant and growing penetration of asynchronous wind generation on the German grid. This standard requires that the machine stay connected for voltages at the terminals as low as 15% of nominal per unit for approximately 0.6 s. Supervisory control and data acquisition (SCADA) equipment for remote control: AWEA recommended the requirement of equipment to enable remote command and control for the limitation of maximum plant output during system emergency and system contingency events. Supervisory control and data acquisition (SCADA) equipment for remote control: AWEA recommended the requirement of equipment to enable remote command and control for the limitation of maximum plant output during system emergency and system contingency events. Reactive power capability: AWEA recommended that wind plants connected to the transmission system be capable of operating over a power factor range of ±0.95. Reactive power capability: AWEA recommended that wind plants connected to the transmission system be capable of operating over a power factor range of ±0.95. Current wind turbine simulation models: AWEA recommended that major stakeholders (TSOs and WT manuf.) participate in a formal process for developing, updating, and improving engineering models and turbine specifications used for modeling the wind plant interconnection. Current wind turbine simulation models: AWEA recommended that major stakeholders (TSOs and WT manuf.) participate in a formal process for developing, updating, and improving engineering models and turbine specifications used for modeling the wind plant interconnection.

RECENT CHANGES TO UK GRID CODE The Grid Code incorporates the technical issues raised by the 3 Licensees with respect to the connection of windfarms: Fault ride through: Requirement for generating units to revert to normal operation when a fault on the network is cleared. Fault ride through: Requirement for generating units to revert to normal operation when a fault on the network is cleared. Power/frequency characteristics: Requirement for generating units to be able to deliver power & remain connected to the network when the system frequency deviates from 50Hz. Power/frequency characteristics: Requirement for generating units to be able to deliver power & remain connected to the network when the system frequency deviates from 50Hz. Frequency control: Requirement for generating plants to be able to increase/decrease power output with falling or rising frequency. Frequency control: Requirement for generating plants to be able to increase/decrease power output with falling or rising frequency. Reactive range and voltage control: Requirement for generating plant to be able to supply lagging/leading reactive power and control the voltage at the grid connection point. Reactive range and voltage control: Requirement for generating plant to be able to supply lagging/leading reactive power and control the voltage at the grid connection point. Negative phase sequence: The requirement for generating units to be able to withstand negative sequence currents caused by phase voltage unbalance and phase to phase faults. Negative phase sequence: The requirement for generating units to be able to withstand negative sequence currents caused by phase voltage unbalance and phase to phase faults.

WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS WFPS1.4.1 A Wind Farm Power Station shall remain connected to the Transmission System for Transmission System Voltage dips on any or all phases, where the Transmission System Voltage measured at the HV terminals of the Grid Connected Transformer remains above the heavy black line in Figure WFPS1.1.

Connection process overview PROJECT PLANNING PHASE INFORMATION PHASE DESIGN PHASE CONSTRUCTION PHASE TESTING & COMMISSIONING PHASE

CATEGORIES OF WIND PLANTS BULK WIND PLANTS: Consist of large wind farms connected to the Transmission System (USA) BULK WIND PLANTS: Consist of large wind farms connected to the Transmission System (USA) DISTRIBUTED WIND PLANTS: refers to single Turbines / small groups of turbines dispersed along Distribution System (popular in Europe, Caribbean ) DISTRIBUTED WIND PLANTS: refers to single Turbines / small groups of turbines dispersed along Distribution System (popular in Europe, Caribbean )

WIND TURBINE CATEGORIES WT divided into two categories which define their electrical characteristics FIXED SPEED DEVICES – Simple & Cheap FIXED SPEED DEVICES – Simple & Cheap VARIABLE SPEED DEVICES – Power Electronic Interface to Grid VARIABLE SPEED DEVICES – Power Electronic Interface to Grid M/C RATINGS FROM 600 KW – 1.5 MW M/C RATINGS FROM 600 KW – 1.5 MW

WIND TURBINE TECHNOLOGY FIXED SPEED FSIG: Standard squirrel-cage induction generator connected directly to the grid: These machines have a gearbox to match the rotational speed of blades with that of the generator. Mechanical power may be regulated through an inherent aerodynamic stall characteristic of blades or with active control of blade pitch. FSIG: Standard squirrel-cage induction generator connected directly to the grid: These machines have a gearbox to match the rotational speed of blades with that of the generator. Mechanical power may be regulated through an inherent aerodynamic stall characteristic of blades or with active control of blade pitch. WRIG: Wound-rotor induction generator with variable rotor resistance: These machines have a gearbox for coupling an electrical generator to a turbine hub. They also have pitch control of blades for maximizing energy capture and controlling turbine speed within range of the generator and a small range of variable speed operation (e.g., 10% of generator synchronous speed). WRIG: Wound-rotor induction generator with variable rotor resistance: These machines have a gearbox for coupling an electrical generator to a turbine hub. They also have pitch control of blades for maximizing energy capture and controlling turbine speed within range of the generator and a small range of variable speed operation (e.g., 10% of generator synchronous speed). VARIABLE SPEED DFIG: Doubly fed asynchronous generator: These are essentially wound rotor induction machines with variable frequency excitation of the rotor circuit, incorporating rotor current control via power converter. The rotor circuit power converter may be four-quadrant, allowing independent control of real and reactive flow in either direction (rotor to grid or grid to rotor), or unidirectional real power flow (grid to rotor). These machines have a gearbox for coupling the generator shaft to turbine hub, active control of turbine blade pitch for maximizing production and controlling mechanical speed, and variable speed operation depending on the rating of power converter relative to turbine rating (e.g., ±30% of generator synchronous speed). DFIG: Doubly fed asynchronous generator: These are essentially wound rotor induction machines with variable frequency excitation of the rotor circuit, incorporating rotor current control via power converter. The rotor circuit power converter may be four-quadrant, allowing independent control of real and reactive flow in either direction (rotor to grid or grid to rotor), or unidirectional real power flow (grid to rotor). These machines have a gearbox for coupling the generator shaft to turbine hub, active control of turbine blade pitch for maximizing production and controlling mechanical speed, and variable speed operation depending on the rating of power converter relative to turbine rating (e.g., ±30% of generator synchronous speed). Synchronous or induction generator with full- size power converter: In these machines, the generator is coupled to the grid through a fully rated ac/dc/ac power converter. They also have a gearbox to match generator speed to variable rotational speed of blades and variable speed operation over a wide range, depending on electrical generator characteristics. Synchronous or induction generator with full- size power converter: In these machines, the generator is coupled to the grid through a fully rated ac/dc/ac power converter. They also have a gearbox to match generator speed to variable rotational speed of blades and variable speed operation over a wide range, depending on electrical generator characteristics.

CAPACITY FACTORS The Declared Net Capacity (DNC) of a generation scheme is a measure of the expected average power output of the generation scheme. DNC = (RATED POWER OUTPUT– POWER CONSUMED BY PLANT) X CF Capacity factor for wave energy schemes = 0.33 Capacity factor for wind energy schemes = 0.43 Capacity factor for other types of C-2 generation schemes = 1.00

POW. SYS. ANALYSIS FOR DISTRIBUTED WIND: Voltage Regulation POWER QUALITY- FLICKER, HARMONICS Short Circuit Contribution

Pow. Sys. Analysis Issues for Bulk Wind include: Var Support Capacity Constraints Stability Reserve Capacity Requirements

Factors Impacting System Voltage Local Wind Profile (Speed, Turbulence, Shear) Local Wind Profile (Speed, Turbulence, Shear) Size of Wind Turbine to Short Circuit ratio Size of Wind Turbine to Short Circuit ratio X/R Ratio of system X/R Ratio of system Type of WTG and associated Reactive Power Control Type of WTG and associated Reactive Power Control Loading on Distribution Feeder Loading on Distribution Feeder

VOLTAGE REGULATION: Commercial WTG employ Reactive Compensation Commercial WTG employ Reactive Compensation Variable Speed Gen. use Static Var. Control to adjust current phase angle Variable Speed Gen. use Static Var. Control to adjust current phase angle Fixed and semi variable speed IG use switched capacitor banks Fixed and semi variable speed IG use switched capacitor banks Need to Coordinate with other Voltage Reg. devices e.g. Regulator/switched Caps. Need to Coordinate with other Voltage Reg. devices e.g. Regulator/switched Caps.

POWER QUALITY VOLTAGE FLICKER - Refers to the rapid variations in voltage levels within a certain Mag. and Freq. range VOLTAGE FLICKER - Refers to the rapid variations in voltage levels within a certain Mag. and Freq. range Synonymous with light or lamp flicker Synonymous with light or lamp flicker Arises due to abrupt changes in WT Pow. O/P- Wind Gusting & Variable Dynamic behaviour Arises due to abrupt changes in WT Pow. O/P- Wind Gusting & Variable Dynamic behaviour Fluctuations at freq. close to 8 Hz cause most annoyance Fluctuations at freq. close to 8 Hz cause most annoyance Occurs on weak systems with low X/R ratio Occurs on weak systems with low X/R ratio

VOLTAGE FLICKER IMPACT Peculiar to Fixed speed devices Peculiar to Fixed speed devices Variable speed WT less likely to cause flicker Variable speed WT less likely to cause flicker Wind farm with several turbines less likely to cause flicker as variations of Pow. O/P tend to cancel out. Wind farm with several turbines less likely to cause flicker as variations of Pow. O/P tend to cancel out.

CAUSES OF FLICKER BY WTG Blade passing of tower results in oscillations Blade passing of tower results in oscillations Variations of wind speed Variations of wind speed Switching operations- startup & shutdown Switching operations- startup & shutdown Recommended limits on flicker in Dist. Networks addressed in IEC Recommended limits on flicker in Dist. Networks addressed in IEC

SHORT CIRCUIT CONTRIBUTION For WTG in 600 kw MW range must consider Fault Contribution For WTG in 600 kw MW range must consider Fault Contribution 80-90% of Dist faults are SLG which cause m/c to receive normal excitation voltage 80-90% of Dist faults are SLG which cause m/c to receive normal excitation voltage For voltage > 60% treat IG as Synch. m/c. (Rule of thumb by W. Feero) For voltage > 60% treat IG as Synch. m/c. (Rule of thumb by W. Feero) Obtain Static Ind. m/c model – more accurate Obtain Static Ind. m/c model – more accurate

NETWORK EFFECT OF GEN. TECH.

EFFECTS DUE TO FAULT CONTRIBUTION REDUCTION OF RELAY REACH REDUCTION OF RELAY REACH SYMPATHETIC TRIPPING OF BREAKERS/RECLOSERS SYMPATHETIC TRIPPING OF BREAKERS/RECLOSERS COORDINATION ISSUES- DELAYED AUTO-RECLOSING 3-5 secs. COORDINATION ISSUES- DELAYED AUTO-RECLOSING 3-5 secs.

Network Design for WTG Connection CONNECTION VOLTAGE – 24 KV, 69 KV CONNECTION VOLTAGE – 24 KV, 69 KV NETWORK FAULT LEVEL NETWORK FAULT LEVEL SYSTEM X/R RATIO SYSTEM X/R RATIO NETWORK CAPACITY AT PCC – THERMAL RATINGS, EXP. REQ’MENTS, VOLT. REGULATION NETWORK CAPACITY AT PCC – THERMAL RATINGS, EXP. REQ’MENTS, VOLT. REGULATION

WF POWER EQUATION Where, ρ = air density (nominally 1.22 kg/m3) R = radius of area swept by the turbine blades V = speed of moving air stream Cp = “coefficient of performance” for the composite airfoil (rotating blades)

VAR SUPPORT WIND FARMS TYPICALLY NOT USED TO PROVIDE VOLTAGE CONTROL WIND FARMS TYPICALLY NOT USED TO PROVIDE VOLTAGE CONTROL CAN PROVIDE LOCAL VOLTAGE REGULATION FOR WEAK SYSTEMS CAN PROVIDE LOCAL VOLTAGE REGULATION FOR WEAK SYSTEMS FLUCTUATING WIND PLANT O/P MEANS AMT. OF REACTIVE POW. REQ’D VARIES FLUCTUATING WIND PLANT O/P MEANS AMT. OF REACTIVE POW. REQ’D VARIES FAILURE TO MAINTAIN REACTIVE Q LEADS TO VOLTAGE COLLAPSE AS WTG O/P INCREASES FAILURE TO MAINTAIN REACTIVE Q LEADS TO VOLTAGE COLLAPSE AS WTG O/P INCREASES

REACTIVE COMPENSATION TECHNIQUES: CONSTANT PF - Switched Cap. Banks at each WTG provide constant PF over range of Gen O/P CONSTANT PF - Switched Cap. Banks at each WTG provide constant PF over range of Gen O/P VARIABLE PF – Real time control of each WTG reactive Q production or absorption VARIABLE PF – Real time control of each WTG reactive Q production or absorption SUBS. SWITCHED CAP. BANKS – Large Cap banks located at interconnection Sub. SUBS. SWITCHED CAP. BANKS – Large Cap banks located at interconnection Sub. STATCOM – FACTS devices that use voltage source converters to provide reactive current. STATCOM – FACTS devices that use voltage source converters to provide reactive current.

POWER SYSTEM STABILITY Full Assessment of Network performance requires study of STEADY STATE and TRANSIENT STABILITY operation Full Assessment of Network performance requires study of STEADY STATE and TRANSIENT STABILITY operation Characteristics of WTG must not compromise the stability of Power System following CONTINGENCY Characteristics of WTG must not compromise the stability of Power System following CONTINGENCY

DEFINITION OF STABILITY STEADY STATE STABILITY - Ability of Pow. Sys. to remain stable after a small disturbance e.g load disturbance, switching STEADY STATE STABILITY - Ability of Pow. Sys. to remain stable after a small disturbance e.g load disturbance, switching TRANSIENT STABILITY – ability of Pow. Sys. to maintain synchronism after a severe transient disturbance. E.g. Short Circuits, loss of load or Gen. TRANSIENT STABILITY – ability of Pow. Sys. to maintain synchronism after a severe transient disturbance. E.g. Short Circuits, loss of load or Gen.

PURPOSE OF TRANS. STAB. STUDY TO PREDICT ABILITY OF GEN. TO RECOVER AND REMAIN CONNECTED TO POWER SYSTEM AFTER A FAULT TO PREDICT ABILITY OF GEN. TO RECOVER AND REMAIN CONNECTED TO POWER SYSTEM AFTER A FAULT TO ASSESS INTERACTION OF GENS. AND OTHER ROTATING PLANT (WTG) CONNECTED TO NETWORK AFTER FAULT TO ASSESS INTERACTION OF GENS. AND OTHER ROTATING PLANT (WTG) CONNECTED TO NETWORK AFTER FAULT TO ENSURE MINIMUM VOLTAGE DISTURBANCE DUE TO LOSS OF SYNCHRONISM TO ENSURE MINIMUM VOLTAGE DISTURBANCE DUE TO LOSS OF SYNCHRONISM

SMALL SIGNAL STABILITY Two forms of Instability occur under these conditions: Steady Increase in Rotor Angle due to lack of sufficient Synchronising Torque Steady Increase in Rotor Angle due to lack of sufficient Synchronising Torque Rotor oscillations of increasing amplitude due to lack of sufficient damping torque Rotor oscillations of increasing amplitude due to lack of sufficient damping torque

TRANSIENT STABILITY CONSIDERATIONS In large complex power systems Transient instability may not always occur as first Swing Instability, but may be due to superposition of several modes of oscillations. In large complex power systems Transient instability may not always occur as first Swing Instability, but may be due to superposition of several modes of oscillations. Analysing TS - the study period is 3-5 secs. after disturbance. May be extended to 10 secs. or more. Analysing TS - the study period is 3-5 secs. after disturbance. May be extended to 10 secs. or more.

STABILITY CHALLENGES CAUSES SHORT CIRCUITS SHORT CIRCUITS LOSS OF TIE LINES IN UTILITY NETWORK LOSS OF TIE LINES IN UTILITY NETWORK LOSS OF GENERATION LOSS OF GENERATION SWITCHING OPERATIONS OF LINES, CAPACITORS ETC. SWITCHING OPERATIONS OF LINES, CAPACITORS ETC. SUDDEN LARGE STEP CHANGE OF GENERATION SUDDEN LARGE STEP CHANGE OF GENERATION CONSEQUENCES AREA WIDE BLACK OUT AREA WIDE BLACK OUT INTERRUPTION OF LOAD INTERRUPTION OF LOAD UNDER VOLTAGE CONDITION UNDER VOLTAGE CONDITION DAMAGE TO EQUIPMENT DAMAGE TO EQUIPMENT RELAY AND PROTECTIVE DEVICE MALFUNCTION RELAY AND PROTECTIVE DEVICE MALFUNCTION

SYSTEM OR NETWORK STUDY LOAD FLOW STUDY LOAD FLOW STUDY TRANSIENT STABILITY STUDY TRANSIENT STABILITY STUDY DYNAMIC SECURITY ASSESSMENT DYNAMIC SECURITY ASSESSMENT COMMERCIAL SOFTWARE PSS/E – PTI LTD. PSS/E – PTI LTD. ERACS – ERA LTD. ERACS – ERA LTD. IPSA – IPSA POWER/UMIST IPSA – IPSA POWER/UMIST ETAP – OTI INC. ETAP – OTI INC. MATLAB / SIMULINK MATLAB / SIMULINK

PS STUDY CONSIDERATIONS LOAD FLOWS LOAD FLOWS CURRENT FLOWS IN EACH BRANCH OF NETWORK CURRENT FLOWS IN EACH BRANCH OF NETWORK REAL & REACTIVE POWER FLOWS REAL & REACTIVE POWER FLOWS VOLTAGES AT EACH NODE VOLTAGES AT EACH NODE VOLTAGE BOOST AT CONTROL NODES VOLTAGE BOOST AT CONTROL NODES LOSSES LOSSES

FAULT LEVEL STUDIES TOTAL FAULT CURRENT AT FAULTED NODE TOTAL FAULT CURRENT AT FAULTED NODE ANGLE OF FAULT CURRENT RELATIVE TO REFERENCE VOLTAGE ANGLE OF FAULT CURRENT RELATIVE TO REFERENCE VOLTAGE FAULT CURRENT DISTRIBUTION FAULT CURRENT DISTRIBUTION (CRITICAL TO PROTECTION) (CRITICAL TO PROTECTION)

LOAD FLOW ANALYSIS

MATLAB/POWERSIM

ETAP 5.5.0

ETAP FEATURES

MODELLING ISSUES DFIG MODELLED – ALL PARTS MODELLED FOR DYNAMIC STUDIES DFIG MODELLED – ALL PARTS MODELLED FOR DYNAMIC STUDIES AERODYNAMICS AERODYNAMICS TURBINE TURBINE DRIVE TRAIN - GEARBOX DRIVE TRAIN - GEARBOX GENERATOR GENERATOR CONTROL SYSTEM CONTROL SYSTEM

WIND FARM MODELLING Modelling WF requires grouping of m/cs of similar type into an equivalent single m/c Modelling WF requires grouping of m/cs of similar type into an equivalent single m/c Large WF can be split into several equiv. m/cs Large WF can be split into several equiv. m/cs Layout of WG to be taken into account as this affects regulation and dynamic behaviour especially of variable speed m/cs. Layout of WG to be taken into account as this affects regulation and dynamic behaviour especially of variable speed m/cs. Consider Loss of accuracy vs. simplified practical model Consider Loss of accuracy vs. simplified practical model

SIMULATION STUDY TRANSIENT STABILITY STUDIES PERFORMED FOR (up to 7 secs): TRANSIENT STABILITY STUDIES PERFORMED FOR (up to 7 secs): CONTINGENCY ON OHL INFEEDS AND WF CKT CONTINGENCY ON OHL INFEEDS AND WF CKT CONTINGENCY ON UG CABLES CONTINGENCY ON UG CABLES LOSS OF GENERATION LOSS OF GENERATION BUS FAULT BUS FAULT WIND GUST WIND GUST

SYMETRICAL LV TOLERANCE CURVE

EQUAL AREA CRITERION: Divide the machines in the system into two groups: Divide the machines in the system into two groups: the critical machines that are responsible for the loss of synchronism, and the remaining non critical ones the critical machines that are responsible for the loss of synchronism, and the remaining non critical ones Replace the two groups by two equivalent. machines. Replace the two groups by two equivalent. machines. Replace these machines by an equivalent single machine, infinite bus system. Replace these machines by an equivalent single machine, infinite bus system. Evaluate the system stability using the equal area criterion. Evaluate the system stability using the equal area criterion.

WF SINGLE LINE SIMULATION

CONVERTER

WT MODEL: Cp CURVES

WT AERODYNAMICS MODEL

CONVERTER CONTROL

MACHINE INERTIA CONSTANTS

DFIG MODEL SETUP

WIND CHARACTERISTIC MODEL

ST-NO-OHL-FLT-L25SIM

ST-NO-OHLFLT-L11-PROTSIM

ST-NO-OHLFLT-L25BFSIM

TS- ST-CE-OHLFLT- V & I

TS-ST-CE-OHLFLT- P & Q POWER

ST-CE-OHLFLT-SPEED & MECH. POWER

TS- CH-STUGCABFLTBF

TS- CH-STCABBF MECH. POW & SPEED

WFT-WIND GUST

SWING CURVES: SG 24 BUS FAULT

SWING CURVES- NORTH 24 BUS FAULT

CONCLUSIONS: BLPC TO ADOPT RELEVANT INT’L STANDARDS- FORMULATE INTERCON. GRID CODES BLPC TO ADOPT RELEVANT INT’L STANDARDS- FORMULATE INTERCON. GRID CODES DFIG – HAVE CAPACITY TO ASSIST STABILITY DURING POWER SYSTEM DISTURBANCE DFIG – HAVE CAPACITY TO ASSIST STABILITY DURING POWER SYSTEM DISTURBANCE SIMULATIONS NEEDED TO TEST DFIG & MANUF. M/C PARAMETERS FOR LVRT REQUIREMENT & STABILITY ENHANCEMENTS SIMULATIONS NEEDED TO TEST DFIG & MANUF. M/C PARAMETERS FOR LVRT REQUIREMENT & STABILITY ENHANCEMENTS PROTECTION PHILOSOPHY TO BE ADOPTED w.r.t. WFT INTERCONNECTION PROTECTION PHILOSOPHY TO BE ADOPTED w.r.t. WFT INTERCONNECTION

COMPARISON OF WT TO TALLEST BUILDING B’DOS CENTRAL BANK B’DOS CENTRAL BANK Typical 850/900 kW Wind Turbine Generator 52m Rotor Diameter 50m Hub Height

QUESTIONS?