INFRA DREDGE SERVICES PVT. LTD. 1-35, 3 rd Floor, Shroff Bhavan, Next to Yellow Gate Police Station, Carnac Bunder. PD Mello Road. Masjid Bunder (East), Mumbai , India. Tel: /58/59 Fax: COMPANY PROFILE
INTRODUCTION Infra Dredge Services Pvt. Ltd. (IDS) was incorporated in the year IDS provides international standard dredging services at indigenous costs. The Promoter Directors of IDS have headed with international dredging companies in Indian Subcontinent and have an experience of executing dredging works as per international standards. It has acquired the suitable dredgers for maintenance and capital dredging. There is a significant increase in dredging requirements in India and Asian region as new port expansion projects are being taken up.
MISSION AND OBJECTIVES Our mission is “To be a prominent dredging company equipped with international standards of dredging and be an integral part of port development activities in the continent of Asia.” “To support development of inland waterways and participate in inland waterways transportation infrastructure in India.”
TECHNICAL SKILLS Capital and Maintenance Dredging and Reclamation Dredging harbors and waterways Laying underwater cable Dredging sand for land reclamation Beach and foreshore replenishment Construction of artificial islands Environmental dredging
AVAILABILITY OF DREDGERS IDS has taken on charter three dredgers and owns one dredger : Aru II : A trailing suction hopper dredger. She is currently executing Dredging contract at Kaoh Suing Harbor, Taiwan. Bali II : A trailing suction hopper dredger. Currently in Battam Indonesia. Irian Jaya : A trailing suction hopper dredger. Currently at Karaikal port, India Sea Diamond : Cutter Suction dredger owned by Infra Dredge Services Pvt. Ltd is under dry dock at Hong Kong Shipyard.
TRAILING SUCTION HOPPER DREDGER ARU II
ARU II:TRAILING SUCTION HOPPER DREDGER Capacity:5000 cu.m Length Overall: m Breadth:18.00 m Depth:10.30 m Dredging Depth:30.0 m Gross /Net Tonnage:6603/ 1981 Ship yard:Volswerft GMBH, Stralsund Germany TECHNICAL DETAILS OF DREDGERS
BALI II:TRAILING SUCTION HOPPER DREDGER Capacity:5000 cu.m Length Overall: m Breadth:18.00 m Depth:10.30 m Dredging Depth:30.0 m Gross /Net Tonnage:6603/ 1981 Ship yard:Volswerft GMBH, Stralsund Germany
TRAILING SUCTION HOPPER DREDGER IRIAN JAYA
TECHNICAL DETAILS OF DREDGERS IRIAN JAYA:TRAILING SUCTION HOPPER DREDGER Capacity:4000 cu.m Length Overall: m Breadth:18.02 m Depth:18.13 m Dredging Depth:20.0 m Gross /Net Tonnage:5029/1509 Ship yard:O&K, West Germany
CUTTER SUCTION DREDGER “SEA DIAMOND”
SEA DIAMOND:CUTTER SUCTION DREDGER Length Overall/ Hull:77.0 m (incl. protrusions) Breadth:14.02 m Depth:2.02 m Total Installed power:8000 hp Dredge Pump:5000 hp Cutter Power:800 hp Dredging Capacity:1000 to 1200 cu. m per hr solids Pumping Distance:3000 m (2 pumps in series) Pipeline Diameter:750 mm Suction pipe diameter:800 mm Gross /Net Tonnage:847/ 816 TECHNICAL DETAILS OF DREDGERS
CONTRACTS COMPLETED & AWARDED INFRA DREDGE SERVICES PVT. LTD.
PROJECTS COMPLETED 1. International Container Transshipment Terminal, Vallarpadam, Kochi, India Quantity : 6,00,000 cu. m silt and hard clay dredging under jetty. Value of contract : Rs crores Operated by : Dubai Port World Work period : 8 months Work area : Alongside berth and jetty area
PROJECTS COMPLETED ICTT, Vallarpadam, Kochi, India
COMPLETION CERTIFICATE
PROJECTS COMPLETED 2. Ennore Port, Tamil Nadu, India Quantity : 4,03,000 cu. metre clay and sand dredging Value of contract : Rs crores Operated by : Ennore Port Ltd. Work period : 60 days Work area : (i) Access Channel and (ii) Port basin alongside berth at Ennore Port
PROJECTS COMPLETED Ennore Port, Tamil Nadu, India
COMPLETION CERTIFICATE
3. Karaikal Port, Pondicherry, India Quantity : 15,55, 804 cu. metre clay and sand dredging Value of contract : Rs crores Operated by : Marg Limited Work period : 180 days Work area : (i) Channel, turning circle and (ii) Basin at Karaikal port PROJECTS COMPLETED
Karaikal Port, India PROJECTS COMPLETED
COMPLETION CERTIFICATE
PROJECT COMPLETED 4. Kaohsiung Harbor Bureau, Taiwan Scope of Job : Sand dredging of 1 st Port entrance, 2 nd Port entrance, channel Quantity: 2 millions cubic meters sand dredging work 160,000 square meters reclamation area Value of contract : USD million Employer: I SAN Construction Co. Ltd. Contract period: 300 calendar days
Kaoh Suing Harbor, Taiwan PROJECT COMPLETED
PROJECTS IN PROGRESS 5. Gopalpur Port, Orissa, India Scope of Job : Capital Dredging and Shore Nourishment – Contract Package No. GPL/ C-04. Quantity : 8.00 million cu. metre clay and sand dredging Value of contract : Rs Crores Employer: Gopalpur Port Limited Contract period : Approx. 8 months
Gopalpur Port, Orissa, India PROJECTS AWARDED
COMPLETION CERTIFICATE
Kaohsiung Harbor Bureau and Taipei Port, Taiwan Scope of Job : Capital Dredging works and reclamation work. Quantity: Contract A – 7 million cu. m at Kaohsiung Harbor (KAHB) Contract B – 72 million cu. m at International Container Terminal, KAHB Contract C – 4 million cu. m at Taipei Port Value of contract : Contract A – $84 million (Rs crores) Contract B – $360 million (Rs.1656 crores) Contract C – $18.60 million (Rs crores) Employer : I SAN Construction Co. Ltd. Contract period: 5 years, starting from January, 2014 PROJECT AWARDED
1-35, 3 rd Floor, Shroff Bhavan, Next to Yellow Gate Police Station, Carnac Bunder. PD Mello Road. Masjid Bunder (East), Mumbai , India. Tel: /58/59 Fax: INFRA DREDGE SERVICES PVT. LTD.