LAKE OSBORNE MUCK DREDGING PROJECT. Presentation Overview What are the Chain of Lakes? –How have the lakes become degraded? –Palm Beach County’s Involvement.

Slides:



Advertisements
Similar presentations
PINE HOLLOW WATERSHED ENHANCEMENT PROJECT Sherman County Soil & Water Conservation District.
Advertisements

Wastewater Treatment.
Wastewater Treatment.
Lake County Water Authority Nutrient Reduction Facility (NuRF) Lance Lumbard Water Resources Project Manager.
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Lake Whetstone Sediment Removal by Hydraulic Dredging
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
What Do You Know About Michigan’s Hidden Resource? All photos by Joan Schumaker Chadde, Western Upper Peninsula Center for Science, Mathematics and Environmental.
CITY OF SAN MARCOS/TEXAS STATE UNIVERSITY 2015 WORK PLAN BUDGETED CONSERVATION MEASURES.
Surface Water Treatment Plant
Muskegon Wastewater Treatment Facility
Domestic Waste Water Treatment
Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101.
Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI Aerial Photos Taken April 1, 2009 By.
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
What Do You Know About Michigan’s Hidden Resource?
Through funds made available from a 319 grant focused on water quality issues in the Spring River Watershed, plans for a demonstration Rain Garden were.
Cleaning up the Hudson Andrew Brown. The Hudson River Official Source- Lake Tear in the Clouds in Adirondack Mountains Official Source- Lake Tear in the.
Senior Associate Florida Successes of Polymer Enhanced Best Management Practices (PEBMPs) Steven R. Iwinski Environmental Scientist March 16 th, 2007.
Norse Energy Corp., USA  As natural gas assumes a far more important role in America’s energy mix, Norse Energy is committed to exploring, developing,
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Pollutants in wastewater -- Revisited Ammonia Organic matter Nutrients Pathogens Color Metals and SUSPENDED SOLIDS.
Water treatment Lilly Corradi.
Processing, distribution and use of water.
Lake Apopka Restoration Proposed projects for Legislative Appropriation.
CLARIFICATION REACTOR THICKENING
Water in the Community: From Lake Ontario to us Thursday, March 25 th.
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Lake Okeechobee Status Lake Okeechobee WRAC Committee David Unsell, PE March 28, 2007.
Key Questions for Understanding Surface Water Section 9.1.
Why Should We Protect the Water?.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Nikolaus Sires ET-493 Advisor: Dr. Rana Mitra. Problem 1 The site of this senior project is a pond of approximately three acres. I desire to remove one.
Potential Impacts of a Seawater Intake Structure and a Brine Disposal System for the Proposed Desalination Plant at Mile 6, Swakopmund Marine Ecological.
ROCK KOSHKONONG LAKE DISTRICT Lake Dredging Project.
An Overview of our Community’s Stormwater Management Program
Nashville Zoo at Grassmere Stream and Water Quality Improvements Quality Improvements Littlejohn Engineering Associates, Inc. Civil & Environmental Consultants,
 Watch the Peel Water Treatment Tours › Water Treatment Plant Tours Water Treatment Plant Tours  Complete the reading on Peel’s Water Treatment Process.
High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds Presented by: Neil Nowak, PE Phone:
MAXIMIZING THE ECONOMICS OF CLEAN WATER USING A HYDRAULIC DREDGE AND A MECHANICAL DEWATERING PLANT: CASE STUDY OF LAKE DELAVAN, DELAVAN WISCONSIN PIANC.
Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.
Date: Monday, May 11 th 2015 Topic: Water Purification Objective: To recognize the stages of it.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Assignment You need to draw and label each step of the water treatment process Under each label explain what is happening in that step.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
The Waterworks Section 5.4. How does fresh water reach you? Ancient Romans built aqueducts – canals to carry water from the mountains to the city… some.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
Safe, Clean and Drinkable
Conventional Sewage Treatment Plants:
What Do You Know About Michigan’s Hidden Resource?
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Wastewater Treatment.
Wastewater Treatment.
Wastewater Treatment.
Streaming Current Detectors
Sedimentation Text book, Chapter 3 Reading Materials:
مبانی کار تصفیه‌خانه‌های آب
Wastewater Treatment.
What is a rain garden? This presentation is designed to introduce the importance of rain gardens and explain how rain gardens function. Notes are included.
Wastewater Treatment.
Wastewater Treatment.
Presentation transcript:

LAKE OSBORNE MUCK DREDGING PROJECT

Presentation Overview What are the Chain of Lakes? –How have the lakes become degraded? –Palm Beach County’s Involvement - State of the Lakes Plan What is Muck? - How does muck develop? –How much muck is in the lake and how do we know? - Surveys -What is the County’s plan? - Lake Osborne Muck Dredging Project Lake Osborne Muck Dredging Project –Brennan Marine Professionals –Dredging Equipment –Dewatering Plant –Drying Methods –Disposal of Muck Future of the Project

CHAIN OF LAKES Part of a natural lake system that, at one time, extended from West Palm Beach to Delray Beach The E4 canal connects Pine Lake, Lake Clark, Lake Osborne, Lake Eden, Lake Ida Freshwater lakes: –provide habitat for native flora & fauna –replenish drinking water supplies –store and filter storm water –provide recreational opportunities –aesthetically appealing

Degradation of a System Historical dredge & fill activities, urban encroachment & discharge from canals.....

South Lobe of Lake Osborne (1986)...lead to the lakes’ waters becoming overloaded with nutrient-rich organics

As a result, excessive plant life (algal blooms) develops throughout the Chain of Lakes causing a decrease in water quality & reduction in oxygen levels HYDRILLA

STATE OF THE LAKES PLAN The lakes’ decreasing quality prompts Palm Beach County’s Department of Environmental Resources Management to commission a report in 1997 to address how to enhance and improve the freshwater system and its management The plan focuses on the following goals: Restore and Protect Wetland Habitats Protect & Improve Water Quality Control Exotic Vegetation Maintain & Enhance Fisheries Enhance Public Participation & Environmental Awareness

MUCK What is MUCK? Muck is organic and inorganic sediments, sands, silt, debris and other materials How does MUCK form? Muck is a result of the excess nutrients in the water. Excess nutrients are attributed to: -Lakes’ extensive development -Herbiciding of non-native vegetation -Discharge of several canals How long has MUCK been accumulating throughout the lakes? -50 plus years

Photo Credit: SFWMD (Know the Flow Poster)

Method of Measurement: dual frequency transducer Transducer captures the top of the muck layer and natural sandy lake bottom to determine muck’s thickness In 2002, the County contracts with the survey company, Morgan & Eklund, INC., to measure the amount of muck throughout Lake Osborne

LAKE OSBORNE MUCK DREDGING PROJECT Surveys reveal 700,000 CY of muck cover the sandy lake bottom In response, Palm Beach County develops the Lake Osborne Muck Dredging Project County divides the dredging of the southern lobe into phases: Phase I: removal of approximately 20,000 cubic yards of muck, in situ, from a 199,241 square foot section Phase II: removal of approximately 85,000 cubic yards of muck, in situ from a 1,015,010 square foot section

County decides to pay selected contractor by the square footage vs. cubic yard because of the consistency of the material Muck is difficult to measure volumetrically because there is no defined top layer 1.2 million square feet (approximately 28 acres) throughout the project site $1.12 per square foot Total project cost for Phase I & II: 1.4 million dollars LAKE OSBORNE MUCK DREDGING PROJECT

County awards Brennan Marine Professionals Phase I of the contract in March 2004 Brennan receives Phase II of the project if they are able to meet project deliverables & complete work within allotted time frame for Phase I Project Time Frames: Phase I - 45 days from Notice to Proceed to mobilize all equipment (no payment for mobilization) 70 calendar days after mobilization to complete dredging and dewatering of material from Phase I Phase II – 300 calendar days from issuance of the second Notice To Proceed to complete Phase II

Spring 2004: Brennan receives Notice to Proceed in March and begins to mobilize equipment in April Mobilization at Melear Park: April 22, 2004

Fusing & placement of polyethylene plastic pipe Mobilization: April 22, 2004

Eight (8) inch intake pipeline transports muck (slurry) to the dewatering plant

Buoys & signage along the pipelines warn recreational users of the pipes’ presence

Dredging Equipment 8” Swinging Ladder Rotating Cutter Head Suction Dredge - 3 Spud System - Hydraulically Actuated Spud Frame enables dredge to walk along the lake bed

CUTTER HEAD

Interface between the dredge operator & field conditions Dredge Operator Booth

High Tech Instrumentation on the Dredge Includes: RTK Global Positioning System RTK Positioning System provides sub-centimeter accuracy for position of dredge and cutter head DREDGEPACK Software Uses county surveys that designate dredge depths Screen displays operator position & amount of material being removed Tracks & recalculates the amount of material to be excavated Displays new calculations on the screen until achieving designated dredge depth

Dredge Track Lines : demonstrate where the dredge’s cutter head is working throughout the day Pay Survey Deliverable

Dewatering Plant

Underflow (slurry) entering dewatering plant

SAND WHEEL (used initially)

Wheel removes sand from slurry Contains 200-mesh (.074 mm) screens

SCALPER Removes debris & organics by gravity feeding slurry through a belt screen FRAC TANK Slurry homogenizes in frac tank (Only minus 200-mesh /.074 mm solids remain)

VIBRATORY SCREEN Material travels over a 5’ x 7’ vibrating screen (35-mesh/0.5 mm) Vibration causes the sands & larger material to move toward the discharge end of the screen where it is placed on the radial stacker Material finer than 35-mesh/0.5 mm drops through the screen into a sump

HYDROCYCLONES (now in use) Slurry collecting in sump is pumped and delivered to two cyclonic separators The cyclonic separators perform like a centrifuge, using 320-mesh screens to further separate the slurry -Finer material spins out the top of the separators & moves toward the frac tank -Larger material falls to the bottom of the separators & passes over the dewatering screen for a second time

Dewatering Screen

Radial Stacker Material passing over the dewatering screen falls onto the radial stacker

FRACTANK Slurry now contains only 320- mesh solids First injection of chemical: Aluminum-Chloride-Hydroxide (a coagulant) Slurry homogenizes in the tank Fine material leaves via top of cyclone Slurry flows into frac tank Flow regulator (injects chemical into tank at a controlled rate)

Inflow Twin Clarifier Tanks 2% Solution Concentrated deflocculent THICKENER

Flocculent Mixture Second chemical injected: FLOC NALCO Optimer Plus Chemical mixes with water pumped from an underground well Solution added to the slurry contains 1-3% of chemical Injection of chemical into the slurry is computer controlled and based upon the consistency of the material Opitmer Plus (flocculent) helps the organics organize into a semi-solid mass Well Water Control Panel

Overflow Pipe Underflow Pipe Fuel Makeup Well Water Auxiliary Pump Well Chemical & slurry mix together in the flocculent injection tank Slurry separates into the twin clarifiers Return water flows to the top & exits via the overflow pipe Slurry sinks to the bottom of the clarifiers and exits via the underflow pipe Generator

End Results: Overflow Return water is diverted back to Lake Osborne via the 11.5” overflow pipe Return water can not exceed 29 NTUs ( Nephelometric Turbidity Units ) above lake’s background level Overflow is monitored for high turbidity levels twice a day at the overflow tank using a nephelometer

Overflow Tank

End Results: Underflow Underflow exits the dewatering plant and is pumped into a drying bed The processed muck remains within the bed for a week for further dewatering

MANIFOLD

GEO BAGS First dewatering method Allows for further concentration of slurry for hauling Contractor assembled five bags in total (500 CY per bag)

Drying Beds (now in use)

MUCK REMOVAL Muck remixes with sand from the radial stacker Parks Department uses mixture as a soil amendment throughout various County parks and at the site of a future County golf course Processed Material Output = 600 CY per day

Anticipated Benefits Improved water quality & environment Enhanced boating & fishing Re-establishment of native benthic vegetation Increased property value Enriched top soil for use in public parks

The Project’s Future South Florida Water Management District (SFWMD) dedicates $200,000 in matching grant funding for the continued excavation of muck from Lake Osborne

Proposed Dredge Areas for Phase III