Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.

Slides:



Advertisements
Similar presentations
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Advertisements

Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
1 Status of Cosmic Analysis Malcolm Ellis Imperial College London Wednesday 10 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Data Acquisition and Error Analysis for Pepperpot Emittance Measurements Simon Jolly Imperial College DIPAC ‘09.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
Light Loss Tests Update Aron Fish 22/02/06 Mice Tracker Phone Conference.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Aron Fish Imperial College Mice Video Conference 01/02/06
Scintillating Fiber/Clear Fiber QA and Ribbon Production
How is sound captured for a CD
Presentation transcript:

Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status

T. Matsushita 2 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic field to measure the relative change in emmitance of the muon beam The tracker consists of five planar scintillating-fibre stations Each station is composed of three planes of scintillating fibres laid out with 120 degrees radial spacing Each fibre plane is comprised of a ‘doublet-layer’ in which the fibres in the first layer of the doublet are interleaved with those in the second

T. Matsushita 3 Stations built so far Prototype stations 1 – 4; had problems: Did not know which channel is the centre of the station Lots of problems on channel mapping Light loss due to hole mis-alignment at optical connectors Station 5 – the first production version for trackers Built with new procedure that incorporates quality control to rectify any errors occurred during manufacturing. Improvements: Centre fibre clearly marked during ribbon production Optical connector hole alignment checked Number of bundles in a connector checked Number of fibres in a bundle checked Sequence of fibres checked Should have rectified problems encountered for stations 1 – 4, yet to be confirmed

T. Matsushita 4 Bundling - i Make bundle of seven fibres starting from the centre fibre Seven fibres held together with rubber tube; single read-out channel “comb” is used for bundling and QC procedure; bundles are stacked in grooves of the comb bundles of four columns ( or ) for one connector

T. Matsushita 5 Bundling - ii comb

T. Matsushita 6 Connectorisation - i A 22 way optical connector mates seven scintillating fibres with one clear fibre waveguide; alignment of connector holes at scintillating fibres and clear fibres sides are checked with ‘go/no-go gauge’ The scintillating fibre bundles are threaded through one of 22 holes of optical connector Connectorisation mapping for view X

T. Matsushita 7 Connectorisation - ii “Bridge” a tool for QA Fibre radius guide is used for connectorisation Bridge with connectors in place

T. Matsushita 8 QA– counting - i Bundling/Connectorisation most labour intensive, source of errors Number of bundles for a connector as well as number of fibres in a bundle are checked after bundling and connectorisation CCD images of one connector worth of bundles are taken then analysed by software Fibre bundles in comb Fibre bundles in connector

T. Matsushita 9 QA – counting - ii Then software identifies bundles and fibres in the CCD image taken Notifies operator if there are any failures Twenty two bundles identified for comb/bridge Seven fibres in a bundle identified with different colours

T. Matsushita 10 QA – scanning - i If counting QA was OK, move on to fibre sequence check by LED scanning Scan fibre plane with UV LED at 1250 micron/seconds Capture image at frames/seconds => 50 micron/frame Trace sum of CCD intensity for 9 pixels around fibre centre Bottom fibre signal distorted by the top fibres and glue Top fibres Bottom fibres UV LED

T. Matsushita 11 QA – scanning - ii Find frame # of intensity peak of each fibre; Frame # of leading edge = maximum intensity * 0.5 Frame # of trailing edge = maximum intensity * 0.5 Frame # of peak = (leading edge + trailing edge)*0.5 Plot frame # of intensity peak of each fibre; As frame # increases bundle # (channel number) increases, no overlaps of X Fibre sequence as well as bundle order should be OK before gluing a ribbon Max. peak Each X corresponds to peak Seven X in each bundle

T. Matsushita 12 QA – scanning - iii Time interval of each peak checked as well Negative interval if there is fibre swapped between bundles Mean = 4.24 frames => micron agrees with measured mold pitch of 426/2 micron

T. Matsushita 13 Gluing Fix vacuum chuck, carbon-fibre station frame to gluing jig Then glue them together

T. Matsushita 14 Potting, cutting Pot fibres to connectors, then apply glue to stiffen fibres then cut them before polishing Apply glue Cut fibres After cuttingReady for polishing

T. Matsushita 15 Polishing Polish connector surface with diamond fly cutter We had problems not seen in prototype stations Scratches Broken cladding layer After applying optical grease, will not cause transmission problem Will use new diamond fly cutter Cutter can degrade over time

T. Matsushita 16 Plans Test with cosmic ray Polish with new diamond fly cutter Measure uniformity of height (z) of station

T. Matsushita 17 Summary Station 5 built with new manufacturing procedure, which proven to work Ready to be tested o view X - mold4#X / 22 aug fibres o view W - moldX#X / 17 aug fibres o view V - mold4#1 / 15 aug fibres; one extra! micron fibres successfully bundled and connectorised by hand!