O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, 23.07.2013 Page 2 4 th LHC Splice Review, July 22-24, 2013 O. Pirotte (TE-CRG), A. Perin (TE-CRG)

Slides:



Advertisements
Similar presentations
Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
Improved anchoring of SSS with vacuum barrier to avoid displacement Ofelia Capatina (speaker), Katy Foraz (coordinates all the activities), Antonio Foreste,
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
ALIGNMENT OF Q2 LOW BETA QUADRUPOLES D. Missiaen, On behalf of the EN-MEF-SU/MTI team 1.
Overview of SMACC-QA 1.Recall of SMACC-QA organization 2.Tuning the procedures 3.Main results from the QC teams 4.Auditors findings Ranko Ostojic 23 July.
Status of SMACC-QA 1.Recently resolved issues 2.Update from QC teams 3.Statistics S56 and S67 4.Auditors findings 5.4th Splice Review – 22/24 July Ranko.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
Technology Department 1 Visit to Hall 180: Presentation of the consolidation process Third LHC Splice Review, November 12, 2012.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Fourth LHC Splices Review Quality Assurance Review Review of actions from 3 last reviews NB : 8 non-closed ones from 1 st review 5 non-closed ones from.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Fourth LHC Splices Review Quality Assurance Review Introduction Why this 4 th review ? Committee, mandate Questions to the reviewers Overall Quality Assurance.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
A. Perin TE-CRG, 06 April LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs A. Perin, TE-CRG.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Results of short module and qualification strategy
Mikhail Ovsienko TE-MPE-EE
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
SMACC Eighteenth report [20 min] 07/02/2014
Roadmap for triplet cryostats
SMACC Tenth report [15 min] 13/09/2013
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Update of cryogenic activities
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
LS1 Committee January 24th, 2014
Long Shutdown for the LHC: Vacuum Beam Pipes
JLAB MEETING FDR – April 23-24th 2013
Consequences of warming-up a sector above 80 K
Renovation of the 45-year old PS magnets
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
CRG activities for EYETS 2016
Consolidation of the dipole diode insulation Technical aspects
Overview & baseline of LS2 and roadmap for CRG
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
K. Foraz on behalf of OSS members
LHC Machine Advisory Committee Meeting no. 19, June 2006 DFB status
Shortening the long RQF/RQD busbar segments in points 1 and 5
Presentation transcript:

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 2 4 th LHC Splice Review, July 22-24, 2013 O. Pirotte (TE-CRG), A. Perin (TE-CRG) With contributions from: S. Atieh (EN-MME), P. Chambouvet (TE-CRG), J.M. Debernard (TE-CRG), A. Lees (TE-CRG), J.-P. Tock (TE-MSC), R. Principe (TE-MSC), F. Savary (TE-MSC), C. Scheuerlein (TE-MSC), S. Heck (TE-MSC), D. Lombard (EN-MME), J.-F. Poncet (EN-MME), M. Bernardini (EN-MEF), K. Foraz (EN-MEF), R. Girardot (TE-CRG),W. Maan (TE-VSC), J. Finelle (TE-VSC), V. Baglin (TE-VSC)

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 3 Outline Introduction Status of the project Feedback from the field Conclusions

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 4 DFBA Splices consolidation planned for LS1 Shuffling module High current module SHM-HCM splices CL – busbar splices (6x) Essentially same type as magnet-magnet Variant based on magnet-magnet Lyras (only on right side)

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 5 Consolidation the 13 kA splices of the DFBAs for LS1 135 splices need to be consolidated for improvement of the continuity of the copper stabilizer. They are essentially similar to the magnet-magnet ones. The 13kA splices in the DFBAs shall provide the same functionality as the magnet-magnet ones (avoid leaving "fuses" in the system).

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 6 The 135 splices to consolidate in the DFBAs TypeNumberLocationConfiguration SHM to HCM 64 splices 16 sleeves Pigtail to busbar 64 splices 64 sleeves SHM to HCM DFBAP 1 splice SHM to HCM DFBAK 6 splices "Special": 2 DFBAs "Standard": 14 DFBAs

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 7 Global status of work Website: CERN.CH/LS1-DFBA-CONSOLIDATION (or pass through Work started on 6 DFBAs: DFBAK, DFBAJ, DFBAL, DFBAM, DFBAN, DFBAP Special DFBAs: DFBAK: Special consolidation finished in situ ahead of schedule 1st of July ! No disconnection / transport needed ! Back to standard consolidation DFBAP: access to extra splice is done ahead of schedule ! Installation of shunt pending Lyras: first clamp installed without making holes in SHM. Tuning needed. Main issues on planned operations Problem with broaching: 5 weeks delay (see slides)! Unplanned consolidation: Improvement of insulation in HCM-LCM IC following discovery of short to ground in DFBAK 600A busbar.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 8 Step reached in workflow for SHM-HCM std. splices consolidation Open / cut vacuum envelope & inner sleeves Remove insulation of busbars QC of splice Ok? no Redo splice Machine busbar QC of shunt OK ? Repair shunt Install insulation and supports Weld sleeve Weld vacuum envelope ELQA QC of weld QC of welds yes OK? no yes no Repair Leak tests OK? no yes Repair OK? no yes Repair repair OK ? no yes Repair OK? no yes Leak & pressure tests with sector Remove beam vacuum equipmt. TE-SVC-LBV TE-CRG-ME TE-MSC-LMF TE-VSC-EIV QC of machined busbar Ok ? TE-MSC-SCD no yes Install shunts TE-MPE-EE EN-MME Cut Re-instlall beam vac equipmt. Finalize work Done at least once in tunnel NB. All steps completed for special IC in DFBAK X-ray of splices Control of geometry

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 9 Done at least once in tunnel Workflow for pigtail-BB splices consolidation Break vacuum Open door & cut inner sleeves Remove insulation of busbars QC of splice Ok? no Redo splice Machine busbar QC of shunt OK ? Repair shunt Install insulation and supports Weld sleeves Close HCM door ELQA QC of welds yes OK? no yes no Repair Leak tests OK? no yes Repair OK? no yes Repair repair OK ? no yes Leak & pressure tests with sector TE-CRG-ME TE-MSC-LMF TE-VSC-EIV QC of machined busbar Ok ? TE-MSC-SCD no yes Install shunts TE-MPE-EE EN-MME Cut Prepare work X-ray of splices Done at least once in tunnel Install support and MLI

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 10 SHM to HCM interconnection Sequence so far as planned Some difficulties due to geometry (manageable) Reached shunt installed step.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 11 Pigtail to busbar interconnections Sequence so far as planned Leak test performed.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 12 Special SHM-HCM interconnection of DFBAK No transport of HCM Splices fully consolidated Welding + leak tests done: back to standard consolidation

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 13 Special splice of DFBAP SHM-HCM IC opened Access to extra splice done Shunt installation pending Extra splice

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 14 Schedule / dashboards / forecast: main steps Sequence validated Progress as planned. Some difficulties due to non nominal geometry in the SHM-HCM diam. 500 sleeves Durations as planned Major problem with broaching on 24 May. Restarted broaching in tunnel on 5 th July Team is being reinforced to improve speed (not yet taken into account in forecast). Possible improvement by focusing core team on most critical tasks + additional resource on less critical tasks. Approx. 5 weeks Cutting the sleeves Broaching & shunts

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 15 Global schedule overview with forecast Approx. 5 weeks Impact of broaching problem is approx. 5 weeks schedule shift The baseline margin (approx. 5 weeks) has been used up. Consolidation is "just in time" for LS1 planning (not necessarily for SMACC train). Shunts team is being reinforced with objective of "catching up" by November-December 2013.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 16 Feedback from 3 months of operations (1 / 3) Coordination: Organization and tools performed exceeding expectations. Web site very useful with daily updates. No time lost due to coordination issues. Excellent reactivity, precise and timely communication of information. General working conditions: Training on mockups proved very useful Special attention paid to working conditions (example lighting) Time planned for interventions proven adequate (also thanks to mockup training). No extra pressure on field personnel. QA and documentation: Special effort made for measurement and documentation of DFBA. Production and QC documents centralized in one server. Special emphasis on photographic documentation. Centralized: more than 2'000 photographs taken and sorted. Improved lighting for work by special projectors projectors

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 17 Feedback from 3 months of operations (2 / 3) Cutting operations: All tooling performing as planned. Training of personnel adequate. The geometry of the DN500 sleeve of the SHM-HCM interconnection is not always nominal. More manual operations, but can be absorbed by planned durations. No modification of QC steps. Broaching, brazing and insulation of busbars: Broaching: major problem in the broaching operation appeared on 24 May (see next slides) Brazing of shunts according to planned procedures. Repair of two splices done with planned procedure. No problem. No margin on resources. Team being reinforced with two additional persons. Welding (see also presentation by S. Atieh): Special welds performed on DFBAK. All ok. Only 6 "standard" PB welds performed. As planned. No weld in SHM-HCM IC performed yet. These are the most difficult.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 18 Feedback from 3 months of operations (3 / 3) Beam vacuum equipment demounting : Technology of local support works very well. Some shift of activities caused by 3 weeks delay in deliver of special supports (absorbed now). Welding QC (see presentation by J.-M. Dalin) : 6 welds tested. Leak tests (see presentation by P. Cruikshank) : Special welds leak checked on DFBAK. All ok. Only 6 "standard" PB welds performed. As planned. Procedures & tooling ok. Splices QC (see presentation by C. Scheuerlein) : 28 splices tested before consolidation. All ok electrically, 1 not ok with geometry (decision pending). 18 splices tested after consolidation. All ok.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 19 Problem in broaching operation On 24 May 2 splices where damaged on the DFBAK SHM-HCM IC during the broaching operation. Heavy plastic deformation of the U-piece of the splice occurred. Damaged splices Damaged splices following broaching on DFBAK Imprinted marks of tooling

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 20 R. Principe, TE-MSC Broaching is used to prepare the busbar side surfaces before brazing the shunts

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 21 A. Lees, TE-CRG Calculations performed to help determine cause of problem Buckling of side walls Stress in solder Support tooling Can explain the observed result used for improving the tooling A. Lees, TE-CRG

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 22 Test to collapse Tests to collapse requested by the splice task force: Conditions Cutter 19.8 mm without preparation of the bb Splice poor in SnAg (less than 50%) Result To collapse max pressure = 268 and 319 bars (corresponding to kN) Chip thickness (average value) 268 bars: 0.06 and 0.74 mm 319 bars: 0.2 and 0.48 mm 268 bars 319 bars R. Principe, TE- MSC

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 23 R. Principe, TE- MSC Corrective measures to restart work June 24, TE-MSC-LMF got the authorization to restart broaching, with the following recommendations by the task force: Use a new cutter set for each DFBA Use a new support for the cutter basis Suggest chip thickness nominal = 0.05 mm Add 2 cutting steps : 20 mm and 19.9 mm “Remise a zero” of the bb… Prepare the busbar and adjust the cutting tool position before cutting Add a pressure limitation during cutting. I.e. 150 bar valve, tbc.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 24 R. Principe, TE- MSC Illustration of corrective measures Broach modified Digital manometer during broaching (max pressure recorded). Pressure limitation (150 bars). Set of new knives ready Hydraulic pump also available A datalogger has also been ordered.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 25 Summary on broaching operation problem The problem was caused by: Too high force applied for broaching, due to too thick cut and/or geometry of busbars Non full-area support under the U-part Measures to solve the issue Improve the supporting tooling Reduce the thickness of the cut/chip to reduce force (increase the number of steps) Check the geometry Prepare the busbar to fit in acceptable geometry. Validate geometry. Limit the applied force (applied pressure) Improve traceability and process control Measures validated for re-start of work by the Splice Task Force of Work restarted on 5 th July. Successful broaching of 6 splices (12 broaching ops) Completed on 8 th July.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 26 A short to ground was found in a 600 A busbar in the HCM-LCM interconnection in the DFBAK (unrelated to other splice consolidation activities) The short was caused by the contact of the busbar with unprotected sharp edge of a flange. Inspection showed also other similar problems in the interconnection with a high risk of failure un the future. The problem is present in 12 DFBAs. A consolidation solution has been defined and validated. The decision was taken to consolidate all 12 interconnections. Action plan defined. Project launched. Estimation: weeks work to consolidate all. Unplanned consolidation: HCM-LCM interconnections PEEK protection (2 halves) PEEK protection (optional, 2 halves) G11 foil protection Spacer to avoid overheating (concept)

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 27 Busbar lyras in the shuffling module: coupled non-linear Electromagnetic / Structural Analysis with & without clamps Busbar max current before LS1 (11'170 A) Busbar Max UX (mm)  UX (mm) QD QD QF QF213.1 RB RB A. Lees, TE-CRG Busbar Max UX (mm)  UX (mm) QD QD21.4 QF1 1.6 QF20.6 RB RB2-0.5 Busbar 13'000 A with clamps clamps Forces on clamps ClampForce QD440 N QF380 N RB2300 N

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 28 Development of the clamps Access by cutting holes was discounted during the DFBA Splice Review due to the risk of deforming the beam tubes during welding operations. Therefore it was proposed to insert the clamps through the M1, M2, M3 and temperature sensor entrances to the shuffling box. ‘Fly-by-Wire’ technique was proposed to locate clamps was demonstrated on realistic mockup. Design must adapt to large tolerances in position and dimension of busbars. Geometrical constraint to install through M lines and thermometer line, radiation, fatigue, etc. Semi-rigid design with Kevlar cords and Ultem rigid pieces, closed and tightened by a screw system. Extensive prototyping and fatigue tests performed (up to 200'000 cycles at 4x expected load, 77 K) Spec. and design validated by the LHC splice task force. Clamp for RB busbars Clamp for QD & QF busbars

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 29 Training, first installation & installation plans A realistic mockup of the SHM was built. Development and training in realistic conditions. Observation in the DFBAJ and DFBAL show no damage to the busbars, lateral displacements as calculated. Also seen in DFBAJ unexpected longitudinal position of RB busbars (probably since installation). All tooling and methods developed successfully for installation without drilling holes in the SHM. Special tooling required to move busbars and position clamp in unexpected longitudinal RB busbar position. First installation performed on DFBAJ (Sect 5-6) on 2 July (RB). Procedures for remote installation validated but not 100% satisfactory as lateral busbar position (narrow gap) did not allow perfect positioning. To be redone at end of July. Duration as expected about 1/2 day to install clamp. Next steps: install QF/QF clamps on DFBAL beginning of August. Then next DFBAs. Mockup used for training and development RB busbars in DFBAJ showing non nominal position First clamp installed on RB busbars in DFBAJ 02/07/2013

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 30 Conclusions Work organization and sequence ok: thanks to all !!!! Durations and estimated personnel: ok Special operation on DFBAK finished, starting well on DFBAP. Problem with busbar preparation (broaching): shunt installation operations halted from 24 May to 5 July. Technical solution validated. Operations have restarted. Short to ground in HCM-LCM IC, consolidation launched Installation of clamp for lyras in shuffling module without drilling holes successfully developed. First clamp installed. Some tuning needed. Schedule: 5 weeks shift initial DFBAs. No impact on global SMACC schedule but becoming just in time. Resources added to support busbar team.

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 31 Let's continue!