1 2.3a The BHOPAL Incident India, 2 Dec 84 Presented to ES-317y at UWO in 1999. Dick Hawrelak.

Slides:



Advertisements
Similar presentations
TECHNO-LEGAL IMPACT OF BHOPAL GAS TRAGEDY Dr. Asit K Patra Disaster Management Institute Bhopal
Advertisements

Valley City State University | Facilities Services
Emergency Action Plans
Safety In The Workplace CREATED BY: CHELSEA JEAN.
Ethanol Tank Fire Manildra, Inc. Port Kembla, NSW, Australia 3 Mar 04
STOCKPILE MAINTENANCE PROCEDURES
International Dimensions of Ethics Adopted from The Bhopal Plant Disaster, IDEESE Case Study Series, © 2008 IDEESE Case Study: The Bhopal Plant Disaster.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
CONTROL OF HAZARDOUS ENERGY “LOCKOUT/TAGOUT” (LOTO)
Incident Case Description Bhopal, India  Bhopal located in North Central India  Very old town in picturesque lakeside setting  Tourist centre.
1 2.3b Potchefstroom, SA, Ammonia Tank Failure, 13 July 73 Presented to ES-317y at UWO in 1999 Dick Hawrelak.
Handling Liquid Cryogens Safely Tony Kent School of Physics and Astronomy.
Management of Hazardous Chemicals chlorine. Management of Haz.Chemicals Every day lot of chemicals are being handled Some chemicals are safe,some are.
Incident Date:1/11/2012 Time:07:30 AM Fatality: 25 injuries: 131 Total losses:
Contractor Induction Program Gippsland Southern Health Service is committed to a safe and healthy work environment.
THE BHOPAL DISASTER Around 1 a.m. on Monday, the 3rd of December, 1984, In the city of Bhopal, Central India, a poisonous vapour burst from the tall stacks.
WNFC San Francisco April, 2014 Learning the right lessons from Fukushima - A new paradigm for a brighter future.
23 killed, 130 Injured, $1,300MM damage
Fire Prevention and Safety Health Science Class. Rationale: Fires may occur at any time, as a result of overloading wiring, smoking, improper chemical.
FIRE PREVENTION AND SAFETY PRACTICES Health Science.
Safety, Health, and Environmental Committee
Risk Management Information System A Spatial Planning Tool for Chemical Disaster Management SENES Consultants India International Conference on Environmental.
Lockout - Tagout Control of Hazardous Energy CFR
Pressure Safety Valve Design Presented to ES-317 at UWO in 1999 Dick Hawrelak.
Where We Go Wrong In Vessel Design Dick Hawrelak Presented to ES-317Y in 1999 at UWO.
THE BHOPAL DISASTER - A CASE HISTORY BY RONALD J. WILLEY, P.E. NORTHEASTERN UNIVERSITY PREPARED FOR SACHE A PRODUCT OF THE CCPS-AICHE NEW YORK, NEW YORK.
Electrical Safety. What Are Electrical Risks? Electrical risks are risks of death, electric shock or other injuries caused directly or indirectly by electricity.
Confined Space Safety Training Presentations
Lockout / Tagout Control of Hazardous Energy
Nuclear Power Dylan Waybright Kendall Caminiti Gina Raimondo Susan Ellington Paige Urbanovsky.
EuropeAid/131555/C/SER/RS Safety Procedures in the Chemical Industry Ernst SIMON, Styrian Regional Government, Austria Belgrade, December 2013.
Tutorial 1: Case Study – Business in Bhopal
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
Process Safety Management
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS INTRODUCTION TO RELIEF
Chemical contamination Sunday 2 December 1984 INDIA A-M CHAUVEL - BUREAU VERITAS DNS-DCO Ships in Service Training Material A-M CHAUVEL Case study : Bhopal.
The Tragedy Of San Juanico, PEMEX, Mexico City, 19 Nov 84 A BLEVE Case Study Presented to ES-317y at UWO in 1999 Dick Hawrelak.
MEDICAL EQUIPMENT AND UTILITES MANAGEMENT Louis Stokes Cleveland, Department of Veterans Affairs Medical Center JCAHO Environment of Care Series Fiscal.
Peoplefirst-us.com. Photos shown in this presentation may depict situations that are not in compliance with applicable OSHA/MSHA/FHWA requirements.
The Flixborough, UK, Cyclohexane Disaster, 1 June 74 A Vapor Cloud Explosion (VCE) Case Study Presented to ES-317y at UWO in Dick Hawrelak.
Control Of Hazardous Energy
Explosion An explosion is a rapid expansion of gases resulting in a rapid moving pressure or shock wave. The expansion can be mechanical or it can be.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
Plant Explosions and Safety Eli Gronowski CHE 562.
Bhopal Disaster Sydney Hales.
Rule of Air Management Maple Valley Fire & Life Safety Training Division 2007 T/C DiDonato.
Application – Identifying, Listing Equipment, and Documentation
3 rd Dec years back Unforgettable day in the history of India.
Lockout/Tagout.
Safety and Automated Driving Systems Kyle Vogt, Cruise, October 28, 2015.
Tutorial 1: Union Carbide (India) Ltd. Roshanak Moradi Munira Jessa SY DE 142 – May 10, 2004 Introduction to Human Systems Engineering Waterloo, Ontario,
EliminationSubstitutionEngineeringAdministrationPPE Incident Reporting.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Copyright © 2012 American Safety Management Inc. Lockout Tagout.
bin/search/results.pl?tab=av&q=bhopal&recipe=all&start=1&scope=all.
Facilities Incident Notification. Reporting Requirements All employees are required to report immediately any incidents, accidents, or major equipment.
What is a Cryocar? It is a liquid nitrogen powered vehicle. Propulsion systems are cryogenic heat engines in which a cryogenic substance is used as a.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
 Heat travels from hot to cold  The bigger the temperature difference the faster the rate of transfer.
Procedures.
Hot Work Permit Osan AB Fire Emergency Services.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TRYOUT). LOCKOUT/TRYOUT The OSHA Standard for the Control of Hazardous Energy (Lockout/Tryout) 29 CFR covers.
MNM Fatal Powered Haulage Accident Powered Haulage Accident December 17, 2010 (Maryland) December 17, 2010 (Maryland) Crushed Stone Operation Crushed.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Hasmukh goswami collage of engineering
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
Fire Prevention and Safety
Risk Management and Mitigation
First Exam is on March 21 Examples are posted on the course website !
Presentation transcript:

1 2.3a The BHOPAL Incident India, 2 Dec 84 Presented to ES-317y at UWO in Dick Hawrelak

2 UC Block Diagram

3 The Catastrophe 54,000 lbs of extremely toxic methyl isocyanate (MIC) were released from an elevated stack for a period of nearly two hours. The gas cloud covered an area 2.5 km. wide by 4.5 km. long over a densely populated area exposing 200,000 of the 800,000 people of Bhopal.

4 BHOPAL Map

5 Consequences 2,000 fatalities were reported initially. 15 years later, the death toll has risen to 4,000. Some 250,000 people have permanent disabilities.

6 Emergency Response 11,500 people were hospitalized on Dec ,000 were treated the first few days doctors, 200+ nurses, 700 paramedics responded. 5 hospitals and 22 clinics were used.

7 Storage Area As Designed

8 Storage Area As Operated

9 Sequence of Events Prior to the incident, there had been a reduction in operator staff from 12/shift to 4/shift. There had also been a reduction in shift supervisors from 3/shift to 1/shift. Because of these reductions, moral was low.

10 Dec 2, 10:20 PM Day shift operator reports pressure in V-610 as normal at 2 psig. The normal range of pressure is 2 to 25 psig. Tank contains 90,000 lbs of MIC at 75% full. Tank is blocked with small transfer taking place at 77 deg F.

11 Dec 2, 10:45 PM Shift Changes. Normally operators discuss problems experienced during their shift. No problems were communicated to the midnight shift.

12 Dec 2, 11:00 PM Control room operator notes pressure in V- 610 has risen to 10 psig. There was no concern since this was still in the normal operating range. The rate of pressure rise over the 40 minute period was not a concern.

13 Dec 3, 00:15 AM A field operator reported a MIC in the MIC process area. This was considered to be a normal fugitive release and no alarms were sounded.

14 Dec 3, 00:16 AM CR operator observes V-610 pressure at 30 psig and rising rapidly. The CR operator becomes concerned and confused about the steps that should be taken.

15 Dec 3, 00:18 AM V-610 pressure goes off scale at 55 psig. CR operator runs to V-610 tank in the field. He hears tank rumbling, PSV screeching and concrete cover cracking. He runs back to CR & turns on the vent gas scrubber & the reirculating pump. The recirculating pump registers no flow.

16 Dec 3, 00:20 AM MIC production supervisor notifies Plant Superintendent that there is a problem in the storage area.

17 Dec 3, 00:25 AM Plant superintendent arrives at CR and notes much MIC in the atmosphere. He spends the next 15 minutes with the CR operator to learn what action has been taken.

18 Dec 3, 00:45 AM The Derivatives unit shuts-down because of the high MIC in the atmosphere. The phone lines to the CR are all busy.

19 Dec 3, 1:00 AM Derivative unit sounds toxic gas alarm. Plt Supt & MIC opr verify that MIC is coming from an elevated stack before the flare stack. They trace this back to V-610. They turn on firewater monitors on VGS and V-610. They note steam coming from the cracked concrete as they try to cool V-610.

20 Dec 3, 1:00 AM to 2:30 AM Sometime during this period of time, the PSV reseats itself at 40 psig and the release stops.

21 Reasons For The Release Water entered V-610 at a high enough level to start a polymerization reaction. The tank contents were initially at ambient temperatures and the runaway progressed unchecked because there was no cooling on V-610. The heat of reaction boiled the MIC monomer and 54,000 lbs of MIC was released.

22 Dispersion Results

23 Predicted Consequences

24 Lessons Learned V-610 refrigeration unit should never have been shut down to conserve energy. It was intended to slow a potential polymerization reaction if one should accidently occur. The VGS should never have been put on stand-by. It was a critical piece of equipment and should have been available 100% of the time, as intended.

25 Lessons Learned Cont’d The caustic recirculaing pumps on the VGS should never be turned off. Caustic pumps often freeze-up when the are not in use and never respond on demand. The plant should not have been in operation without the flare stack, which was down for maintenance.

26 Lessons Learned Cont’d The plant never conducted “dry run” or emergency practice drills. The various safety devices were not checked on a regular basis. There was no warning to the nearby community.

27 Lessons Learned Cont’d There was no communication to local authorities regarding the hazards of the plant. There was no local emergency plan in place. The shack community was too close to the plant site. 6,000 to 7,000 meters was estimated to be a safe distance.

28 Lessons Learned Cont’d When you go through cost cutting measures to save energy and reduce operators to save operating expenses, moral is bound to suffer. In this state, the safety integrity of the plant is often compromised. This situation often leads to sabotage or extreme actions by those losing their jobs.

29 The Bhopal Aftermath Industry throughout the world responded to the Bhopal Aftermath by adopting the Responsible Care program. 19 resolutions were adopted based on the lessons learned. Emergency planning and green belt separation are required for all toxic chemicals.

30 Possible Exam Questions What three critical equipment items were out of service at the time of the Bhopal incident? What was the global response to the Bhopal Incident? ***