Jason Thom MADCS – October Handy Reference – THE place to look it up Identify Safe Procedures Operation Records Past records can be invaluable Maintenance.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
2013 Northwest Hydro Operators Forum 1 Risk-Informed Decision Making – FERC Perspective David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
The Failure of Teton Dam
Observations and predictions of the behaviour of large, slow-moving landslides in schist, Clyde Dam reservoir, New Zealand D.F. Macfarlane, Observations.
Assessing Seismic (Cascadia Subduction Zone) Risk at Oregon Dams
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Impacts of Seismic Stress on Pore Water Pressure in Clayey Soil By: Qazi Umar Farooq Lecturer Civil Engineering Dept Univ of Engg & Tech Taxila.
East Branch Dam Safety Modification Project
Sharif University of Technology Civil Engineering Department Tehran-Iran Dam Safety An Approach to Prevent Dam Incidents.
PHYSICAL MODELING OF BREACH FORMATION Large scale field tests Kjetil Arne Vaskinn, Sweco Gröner Norway.
Dam Safety Data Management
B Y : J EFF C OFFIN, P.E. S R. C IVIL E NGINEER /H YDROLOGIST K LEINSCHMIDT A SSOCIATES.
Tailing Dams – A Consultants Perspective
2006 Project Alternatives Pit and Dike Risk Evaluation MEADOWBANK GOLD PROJECT.
Nineteen Years later…. Lessons learnt from Kantale Breach D W R Weerakoon Former Director General of Irrigation.
Risk Management and Dam Safety. Reclamation Played a Pivotal Role in Developing Major River Basins in the Western United States.
MINE WASTE DUMP The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining.
1 Scoggins Dam Overview of Seismic Risk July 18, 2012.
2011 MADCS Conference.  FMA is a tool to help identify:  Priorities for rehabilitation  Improvements for operation, maintenance and data collection.
Application of GIS for Seismic Observation in Papua New Guinea
WINDAM Technology Workshop Sept 1-3, 2009 WINDAMb-e (Windows Dam Analysis Modules)
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Community Planning Training 1-1. Community Plan Implementation Training 1- Community Planning Training 1-3.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Risk modeling.
Tailings Dam Safety And Implementation Of Safety Guidelines By A Tailings Dam Operator This presentation presents an operators view on implementing a Dam.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Dams Mehmet Özger (Barajlar) Department of Civil Engineering, I.T.U.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
Michael deLamare Requirements Management Program Functions R-9.
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Hazards Identification and Risk Assessment
Water Resource Management Company (WRM) Ministry of Energy Iranian Approach to Dam Safety - Practice - Achievements - Future plans.
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
Dam Safety in the 21 st Century PFMA as a Dam Safety Tool – Joe Ehasz FERC Regulator Perspective – Doug Johnson USACE Perspective – Doug Boyer Owner Perspective.
3 Easy Steps STEP 1: SITE SELECTION Select Area with Unsuitable Rock Types.
00/2015 Public Information Centre Addendum to the Environmental Study Report: Millbrook Dam Tuesday, October 20, 2015.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Embankment Dam and Spillway Relative Risk Procedures (for Asset Management/Maintenance) Luc Chouinard – McGill University.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
US Army Corps of Engineers BUILDING STRONG ® Name of Levee Segment Presenter Name Presenter Title Duty Location Date of Presentation.
International Levee Handbook Overview of the handbook Chapter 3 Functions, Forms and Failure of Levees.
OHSAS Occupational health and safety management system.
Overview of the handbook Chapter 5: Levee inspection, assessment and risk attribution.
International Levee Handbook Overview of the handbook Chapter 6 – Emergency Management and Operations.
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
Phil Dempsey ISS Vehicle Office July 15, 2014 Inspection Considerations from the ISS Program NASA In-Space Inspection Workshop 2014.
Tailings Dam Stability
2017 USSD Annual Conference and Exhibition Anaheim, California

Auditing Concepts.
Framework for CSO Control Planning
Flooding Walkdown Guidance
Landscape management and Operations accreditation Program
Tennessee Safe Dams Program
4th Annual Construction Law Summit
Effect of Earthquake on Fire Protection Systems
Lesson Seven: Flood Works Monitoring
Single-Case Designs.
Van Wert, OH Water and Wastewater Element Training
Sacramento Environmental Commission January 2019.
Presentation transcript:

Routine Instrumented and Visual Monitoring of Dams Based on Potential Failure Modes Analysis USSD Committee on Monitoring of Dams and Their Foundations White Paper (Draft) RJA on technical committee for HUG and also sits on the USSD committee with Jay and Manoshree. Jay is the chairman. Rick or Manoshree could not make this conference, so I was railroaded, volunteered to give this presentation. Authors: Jay Statler (US Bureau of Reclamation) and Manoshree Sundaram (FERC-CRO) Presented By: Mike Carpenter, GEI Consultants, Inc.

U.S. Society on Dams Vision To be the nation's leading organization of professionals dedicated to advancing the role of dams for the benefit of society. Mission — USSD is dedicated to: Advancing the knowledge of dam engineering, construction, planning, operation, performance, rehabilitation, decommissioning, maintenance, security and safety; Fostering dam technology for socially, environmentally and financially sustainable water resources systems; Providing public awareness of the role of dams in the management of the nation's water resources; Enhancing practices to meet current and future challenges on dams; and Representing the United States as an active member of the International Commission on Large Dams (ICOLD). How many people are members of USSD? How many don’t know about USSD? I encourage you to become a member

White Papers by the USSD Monitoring of Dams and Their Foundations Committee: “Why Include Instrumentation in Dam Monitoring Programs (Nov 2008, Barry Myers and Jay Stateler – published Nov 2008) “Development of an Instrumentation Program” (Jim Hamby, Lead Author, with Pierre Choquet and Brad Long as Co-Authors, in progress)   “Operation and Maintenance of an Instrumentation System” (Amanda Sutter, Lead Author, with Pierre Choquet and Brad Long as Co-Authors, in progress) “Instrumentation Data Management and Analysis” (Chris Hill, Lead Author, with Manoshree Sundaram as Co-Author, in progress) “Routine Instrumented and Visual Monitoring of Dams Based on Potential Failure Modes Analysis” (Jay Stateler, Lead Author, with Manoshree Sundaram as Co-Author, in progress) This paper is part of a series of White Papers by the USSD Monitoring of Dams and Their Foundations Committee to address important topics with respect to the development and successful implementation of dam safety monitoring programs Paper is a draft, so if there are suggestions I will pass them along

Why Provide Instrumentation? The purpose of instrumentation and monitoring is to maintain and improve dam safety by providing information to: evaluate whether a dam is performing as expected and warn of changes that could endanger the safety of a dam Why do we need to have instrumentation? Two basic principals

Principal Causes of Concrete Dam Failures and Incidents (FERC Ch Principal Causes of Concrete Dam Failures and Incidents (FERC Ch. 9, ICOLD 1992, ASCE 1988) Overtopping Foundation leakage and piping Foundation sliding Overtopping from inadequate spillway capacity or spillway blockage resulting in erosion of the foundation at the toe of the dam or washout of an abutment or adjacent embankment structure Foundation leakage and piping in pervious strata, soluble lenses, and rock discontinuities Sliding along weak discontinuities in foundations

Gate Hoist Failure Condition of lift chains for spillway gates – corrosion and pitting can lead to potential failure during operation leading to overtopping Here’s some examples of concrete dam failures

Piping in pervious foundation strata Hope Mills Dam – built in 2007 and failure in 2010 in NC

Sliding Along Foundation St. Francis Dam – built in 1926, too slender of a dam lead to high uplift pressures & overturning – catastrophic failure lead to better oversight in CA by the DWR

Principal Causes of Embankment Dam Failures and Incidents (FERC Ch Principal Causes of Embankment Dam Failures and Incidents (FERC Ch. 9, ICOLD 1992, ASCE 1988) Overtopping Erosion of embankments Embankment Leakage and piping Foundation leakage and piping Sliding of embankment slopes Sliding along clay seams in foundations Cracking due to differential settlements Liquefaction Overtopping from inadequate spillway capacity, spillway blockage, or excessive settlement resulting in erosion of the embankment Erosion of embankments from failure of spillways, failure or deformation of outlet conduits causing leakage and piping, and failure of riprap Embankment leakage and piping along outlet conduits, abutment interfaces, contacts with concrete structures, or concentrated piping in the embankment itself Foundation leakage and piping in pervious strata, soluble lenses, and rock discontinuities Sliding of embankment slopes due to overly steep slopes, seepage forces, rapid drawdown, or rainfall Sliding along clay seams in foundations Cracking due to differential settlements Seismic liquefaction

Spillway blockage; inadequate spillway capacity; erosion of aux Spillway blockage; inadequate spillway capacity; erosion of aux. spillway Damaged emergency spillway after blockage of primary spillway inlet – note hay bails Taum Sauk failure – instrumentation related failure mode

Flow through Conduits; aging conduits Many of the dams that we’re dealing with in the mid-west are old. What might have been a Category IV failure mode 20 years ago, may now be a II or a I based on the aging infrastructure Note degradation of pipe in this photo – cause for potential concern.

Piping in pervious foundation strata An example of inadequate foundation treatment during construction that did not start showing a problem until many years later when depressions and significant leakage was noted downstream of this abutment. Note the sand bags and topical concrete used to “seal” the fractures - yeah

Piping in Embankment Ground loss and sinkholes in an embankment dam – what kind of void is below these holes? The most recognizable piping failure – which dam is this?

Slope Instability & Liquefaction Marchland Levee slope failure in Louisiana in 1983 TVA Kingston ash pond static liquefaction failure in December 2008 – don’t have to deal with this on hydro dams but important to recognize the environmental consequences of failures as well as life and property How many of you have seen signs of these failure modes? Does your PFMA address these PFMs?

Purpose of Instrumentation Provides data to: Characterize site conditions Verify assumptions; Evaluate initial construction Evaluate performance design features Observe performance of known anomalies Evaluate performance with respect to PFMs. Characterize site conditions before construction; Verify design and analysis assumptions; Evaluate behavior during construction, first filling, and operation of the structure; Evaluate performance of specific design features; Observe performance of known geological and structural anomalies; and Evaluate performance with respect to potential site-specific failure modes.

FERC Guidelines – Ch. 9 Instrumentation and Monitoring “Every instrument in a dam should have a specific purpose. If it does not have a specific purpose, it should not be installed or it should be abandoned.”

FERC Guidelines – Ch. 9 Instrumentation and Monitoring “Installation of instruments or accumulation of instrument data by itself does not improve dam safety or protect the public. Instruments must be carefully selected, located, and installed. Data must be conscientiously collected, meticulously reduced, tabulated, and plotted, and must be judiciously evaluated with respect to the safety of the dam in a timely manner. A poorly planned program will produce unnecessary data that the dam owner will waste time and money collecting and interpreting, often resulting in disillusionment and abandonment of the program.” What this say is Owners and regulators must be careful in identifying the instrumentation to be monitored and the frequency of monitoring. The staff obtaining the readings are the first line of defense against conditions indicating a potential unsafe condition. Staff must have an understanding what the instrumentation monitoring for – what failure modes is it monitoring. Give example of daily flume monitoring for a Category IV failure mode – something is out of wack

PFMA Performance Parameter Process (BuRec) Three basic steps: Identify the most likely failure modes for the dam and associated structures. Identify the key instrument monitoring parameters. Define thresholds and actions. There are 3 basic steps to the PFMA process Identify the most likely failure modes for the dam and associated structures – Category I or II PFMs Identify the key monitoring parameters that will provide the best indication of the possible development of each of the identified failure modes, and define an instrumentation and visual monitoring program to gather the necessary information and data. 3. Define the ranges of expected performance relative to the instrumentation and visual monitoring program, and define the action to be taken in the event of unexpected performance.

Outcomes of the PMFA relative to surveillance and monitoring Identification of enhancements to the surveillance and monitoring programs; Identification of gaps in data (Category III); Identification of risk reduction opportunities. Identification of enhancements to the surveillance and monitoring programs and tailoring of existing programs to focus monitoring efforts on early identification of the initiation/development of PFMs; Identification of gaps in data, information and analyses, that may prevent characterization of the significance of a PFM; and Identification of risk reduction opportunities applicable to the surveillance and monitoring programs, operations, etc.

Assessment of Monitoring Needs Based on the PFMA An instrument must answer a specific question or monitor an identified potential failure mode of the dam or foundation to: Provide an early detection of unusual/ unexpected performance Provide confirmation of satisfactory performance An instrument must answer a specific question or monitor an identified potential failure mode of the dam or foundation to: Provide an early detection of unusual/ unexpected performance Provide confirmation of satisfactory performance

Monitoring Consideration for Common PFMs Seepage-related failure modes for embankment dams (example 1) Earthquake-related failure modes for embankment dams (example 2) Failure modes for concrete dams under all loading conditions (example 3) Flood-related failure modes associated with spillway failure (example 4)

Illustrative Example – PFM No. 1 Seepage-Related failure due to breaching caused by flow through embankment dam that results in piping and transport of embankment material out of the dam or into the toe drain system

Illustrative Example 1 – Monitoring Considerations Perform regular visual inspections of: D/S slope and toe area Dam crest U/S slope Reservoir water surface D/S slope and toe area looking for sinkholes, depressions, unusual settlement, new or increase seeps or wet areas, boils, or evidence of material transport Dam crest & U/S slope looking for sinkholes, depressions, and areas of unusual settlement Reservoir water surface looking for whirlpools

Illustrative Example 1 – Monitoring Considerations Toe drain and seepage flows Piezometers and observation wells Increase monitoring frequency during a flood Video inspect toe drain system Regularly monitor toe drain flow and seepage flows, looking for flow increase or evidence of fines Regularly monitor water pressures from piezometers and observation wells in the embankment and foundation, looking for anomalous data During major flood events when reservoir levels are high, increase monitoring frequency Occasionally perform video inspections of the toe drain system

Key monitoring concepts for seepage-related PFMs for embankment dams Monitoring water pressures Data is obtained at discrete points Regular visual monitoring Monitoring water pressures and subsurface water levels provides valuable info toward understanding seepage patterns within the dam and foundation, however… Data is obtained at discrete points and monitoring locations will probably NOT be located at or close to the flow path of a developing seepage problem, therefore… Regular visual monitoring, in conjunction with monitoring wells and piezometers, provides more valuable data for all areas at the site

Illustrative Example – PFM No. 2 Seepage-related failure of embankment dam in the aftermath of an earthquake due to the formation of a transverse crack in the dam, where seepage flows through the crack and eventually erodes and breaches the dam Is anyone aware of any Category I or II PFMs in the upper mid-west related to seismic?

Illustrative Example 2 – Monitoring Considerations Compare baseline data to post-seismic event data In the aftermath of a significant earthquake, perform an immediate visual inspection of: D/S slope, D/S toe, and areas Dam crest U/S slope Reservoir water surface Periodically obtain all seepage and drain flow readings to maintain baseline information to use for comparison purposes in the aftermath of a significant seismic event D/S slope, D/S toe, and areas D/S looking for new sinkholes, depressions, unusual settlement, new or increased seeps or wet areas, boils, or evidence of material transport Dam crest looking for sinkholes, depressions, longitudinal cracks, horizontal or transverse cracks U/S slope looking for sinkholes, depressions, and areas of unusual settlement or deformation Reservoir water surface looking for whirlpools

Illustrative Example 2 – Monitoring Considerations In the aftermath of significant shaking, promptly obtain readings Seismic monitoring equipment with telemetry In the aftermath of significant shaking, promptly obtain readings at all seepage and drain flow monitoring locations and evaluate data for changed conditions from normal historical performance Consider whether seismic monitoring equipment with telemetry would be appropriate at the site. If already present, compare dam performance (e.g. permanent deformation) with that predicted by analytical models

Key monitoring concepts for earthquake-related PFMs of embankment dams PGA criteria Detection of changed conditions Automated and/or remote detection capabilities Baseline data is a must for post-earthquake comparison Determination of “significant” shaking, PGA criteria, or fragility values developed for the dam based on seismic analysis Prompt post-earthquake response is a must to facilitate detection of changed conditions Where risk of eqk-related failure is possible and seismic hazard is high, automated and/or remote detection capabilities are important Development of good pre-earthquake baseline data is a must for post-earthquake comparison purposes

Key monitoring concepts for earthquake-related PFMs of embankment dams Recognized and addressed earthquake issues prior to the event Installation seismic monitoring equipment Strong motion data used to validate dynamic models Nothing can be done during the earthquake to prevent failure. The issues need to have been recognized and addressed prior to the event via a PFMA process Installation of seismic monitoring equipment is particularly important in highly seismic areas to determine whether a post-eqk inspection is warranted and can help prioritize post-eqk inspection response. Strong motion data also helpful in validating assumptions in dynamic analysis models.

Illustrative Example – PFM No. 3 Sliding failure at the dam/foundation contact due to poor bonding of the dam’s concrete to the foundation rock and/or insufficient keying under normal, flood or earthquake conditions

Illustrative Example 3 – Monitoring Considerations Perform regular visual inspections of: D/S face of the dam and gallery walls, floors, and ceilings Place scribe marks Structural monitoring survey points D/S face of the dam and gallery walls, floors, and ceilings looking for new cracks or significant changes at the cracks Place scribe marks in gallery wall and floor at each contraction joint to indicate relative offsets Periodically perform surveys of structural monitoring points on dam looking for evidence of unusual D/S movements. Maintain baseline survey information to use for comparison purposes in the aftermath of an eqk or flood event

Illustrative Example 3 – Monitoring Considerations Significant seismic event Major flood event In the aftermath of a significant seismic event, perform an immediate visual inspection of the scribe marks, visual inspection of the galleries and D/S face (looking for changed cracked conditions), obtain readings of the foundation drain flows and foundation uplift pressures and perform a survey of the structural monitoring points During a major flood event, perform frequent visual monitoring for scribe mark offsets, D/S face and gallery, and perform a survey of structural monitoring points post-flood

Key monitoring concepts for concrete dam failure modes Failures of concrete dams caused by their foundations Original construction photographs Sliding along dis-bonded lift lines Majority of failures of concrete dams caused by problems in their foundations (weak bedding planes, foliation, shears, weak contacts between rock units, etc.) Original construction photos very helpful in identifying weak areas Potential for sliding or separation along disbonded lift lines within concrete should also be considered, particularly during flood or eqk loading

Key monitoring concepts for concrete dam failure modes Changes with respect to historical performance Visual monitoring and instrumentation baseline data Difficult gate operations The first signs of foundation or monolith movement indicating a threat to dam safety will typically manifest itself via changes with respect to historical performance – e.g. new cracks or displacement of existing cracks, observed movement between joints, changes in uplift readings, change drain flows, downstream trend in movement monitoring points with time, etc. Good visual monitoring and instrumentation baseline data is key to early detection of changing conditions Difficulties in gate operations can also provide an early indication of dam movements

Illustrative Example – PFM No. 4 Spillway flow surfaces have flaws such that when subjected to large flows, cavitation results leading to structural damage, headward erosion, and breaching of the reservoir

Illustrative Example 4 – Monitoring Considerations Perform regular visual inspections of: Flow surfaces Spillway gallery Spillway discharges Post-flood conditions Flow surfaces looking for offsets at joints, areas of deteriorated concrete, and other flaws. Also observe for debris accumulation Spillway gallery looking for evidence of displacement, anomalies, and other evidence of irregular flow surfaces Spillway discharges looking for unusual flow patterns (e.g. Rooster tails) that could indicate obvious flow irregularities Post-flood conditions to assess damage to the spillway

Key monitoring concepts for flood-related PFMs associated with spillway failure Pre- and post-flood comparisons Smaller flood events can identify issues Obtaining and maintaining good baseline of pre-flood conditions is important for post-flood comparisons Careful monitoring during smaller flood events can identify performance issues that may result in a threat to dam safety during large flood events

Key monitoring concepts for flood-related PFMs associated with spillway failure Issues need to have been recognized Recognize when failure may be imminent Typically, little can be done during the flood event to prevent failure. The issues need to have been recognized and addressed prior to the event via a PFMA process During the flood event, monitoring involves documenting performance and being in a position to recognize when failure may be imminent so that timely warnings can be issued and evacuation initiated

Closing Remarks The PFM categories discussed are most common The PFMA team may find that the available instrumentation is: Sufficient to reach conclusions re. the PFM, (Category 1 or 2), or Useful, but important issues remain unresolved and more instrumentation is needed (Category 3), or That instrumentation can be eliminated or monitoring frequency reduced because the PFM was found to be non-plausible (Category 4) The four PFM categories discussed are among some of the most common but there are others The PFMA core team may find that the available instrumentation is: Sufficient to reach conclusions re. the PFM, (Category 1 or 2), or Useful, but important issues remain unresolved and more instrumentation is needed (Category 3), or That instrumentation can be eliminated or monitoring frequency reduced because the PFM was found to be non-plausible (Category 4)

Closing Remarks The added value to integrating the PMFA with the dam safety surveillance and monitoring includes: Uncovering data and information Identifying the most significant PFMs Identifying risk reduction opportunities Focusing surveillance, instrumentation, monitoring and inspection programs The added value to integrating the PMFA with the dam safety surveillance and monitoring includes: Uncovering data and information that corrects, clarifies, or supplements the understanding of potential failure modes and scenarios Identifying the most significant potential failure modes Identifying risk reduction opportunities Focusing surveillance, instrumentation, monitoring and inspection programs to provide information on the potential failure modes that present the greatest risk to the safety of the dam

Closing Remarks Instrumentation monitoring program established at one dam may not be appropriate at another dam Each project be independently evaluated Structured process that identifies plausible unique PFMs Develop appropriate monitoring to plausible PFMs Dam owners with multiple dams should note that an instrumentation monitoring program established at one dam may not be appropriate at another dam regardless of the extent of similarities. Therefore, it is imperative that each project be evaluated independently to assess the objectives of the instrumentation program. The evaluation should be part of a structured process that identifies plausible failure modes unique to a dam and develops appropriate responses, including instrumentation requirements, data collection and evaluation procedures, budgetary resources, experience and qualification of monitoring personnel, and monitoring frequency requirements

Questions/Comments