Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.

Slides:



Advertisements
Similar presentations
The magnetic field uniformity and gradient of the B0 coils inside the lower cryostat for the nEDM experiment. S.Balascuta , dr. Ricardo Alarcon ASU Dr.
Advertisements

Magnetic Field Finite-Element Calculations for the Upper Cryostat S. Balascuta, R. Alarcon Arizona State University B. Plaster, B. Filippone, R. Schmid.
Simona Bettoni and Remo Maccaferri, CERN Wiggler modeling Double-helix like option.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Vibrating Wire R&D for Magnet Alignment Animesh Jain, NSLS-II Project The alignment tolerance for a string of magnets.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
CM-18 June The Measurement and Monitoring of the Field from the MICE Magnets Michael A Green Lawrence Berkeley Laboratory, Berkeley, USA Frank Filthaut.
Cryostat and Magnet Status Report UIUC EDM Collaboration Meeting LANL June 20, 2005.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Three-Phase AC machines
Page 1 Christian Grefe, DESY FLC Status of PCMAG fieldmapping analysis Annual EUDET Meeting Paris, Status of PCMAG fieldmapping analysis Christian.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
DHB, nEDM Collab. Mtg, 15/16 Apr 04 UIUC Test System (Beck, Chandler, Hertzog, Kammel, Newman, Peng, Sharp, Williamson, Yoder; Blackburn, Kenyon, Thorsland)
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Status of CEPC Detector magnet
Status of the COBRA Magnet Wataru OOTANI MEG review meeting Feb. 3, 2003 PSI Switzerland.
1 Plan of the injection test 02/2007 nEDM H. Gao, M. Busch, Q.Ye, T. Mestler, X. Qian, W. Zheng, X. Zhu Duke University And others in nEDM collaboration.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
EDM Magnetic Shielding (WBS 5) and Magnets (WBS 6) B. Filippone and B. Plaster Caltech Internal Cost and Schedule Review February 11, 2004.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 Preparation for the 3 He Injection Test 11/2007 MIT/BATES D. Dutta*, H. Gao, M. Busch, Q. Ye, X. Qian, W. Zheng, X. Zhu ( Duke University) ASU, BU, Caltech,
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
The Four-Layer Conventional Magnetic Shield Brad Plaster, Caltech May 25, 2006  “Current” design  Estimated shielding factors  Production and time-scale.
Duke nEDM Collaboration Meeting The status of 3 He Relaxation Time Measurement at ~400mK Q. Ye, D. Dutta, H. Gao, W. Zheng, X. Zhu Duke University R. Golub,
Magnet development experiments B. Plaster Last collaboration meeting (February 2007) x : field direction y : “vertical” z : axial N = 40 cos θ coil 1/7-prototype.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Last collaboration meeting B. Plaster nEDM February 2008 Collaboration Meeting Attention now focused on construction of a 1/2-scale prototype modified.
Helical Undulator Status Jim Clarke ASTeC, STFC Daresbury Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Conceptual Design of the Neutron Guide Holding Field Christopher Crawford, Yunchang Shin University of Kentucky nEDM Collaboration Meeting
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
NEDM Collaboration Meeting, November 1-3, 2007 Valve Progress Steve Williamson, UIUC.
Recent Magnetic Field Results Results from our automated field-mapper system Mappings of N = 8 and N = 40 coil –Coil field profile –Coil + Magnetic Shield.
Magnetic Field and Magnetic Shielding R&D
Cos θ Coil and Magnetic Shielding Progress B. Filippone and B. Plaster Caltech December 3, 2004.
WBS 6: Magnetic Shielding B. Filippone and B. Plaster Caltech December 3, 2004.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Experimental study on heat transfer through a few layers of multilayer insulation from 300 K to 4.2 K Zhanguo Zong, Norihito Ohuchi, Kiyosumi Tsuchiya,
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Prototyping of Superconducting Magnets for RAON ECR IS S. J. Choi Institute for Basic Science S. J. Choi Institute for Basic Science.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Juliette Plouin, Enrico Cenni, Olivier Napoly (CEA)
LARP Phase II Secondary Collimator RC1
R. Kersevan, TE-VSC-VSM 30/06/2016
MDL0L02 Dipole and Environmental Fields
MDL0L02 Dipole Field Offset
Magnetic Field Sensors and Measurements in Cryomodules
Polarized 3He target installation
nEDM Preliminary Engineering Review Magnets & Magnetic Shielding
Presentation transcript:

Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from 4-Kelvin test of a prototype system cos θ coil + ferromagnetic shield + Pb superconducting shield (∂B x /∂x)/B 0 ~ 3 x 10 −5 cm −1 over scaled fiducial volumes

Last collaboration meeting B. Plaster In process of fabricating (~90% complete) a 17%-scale prototype with optimized N=34, ℓ/r = 6.4 [ r = 10.9 cm, ℓ = 69.7 cm ] N ℓ / r global minimum Factor of ~20 more uniform along x-axis than previous prototypes nEDM November 2007 Collaboration Meeting cell ~ 2  10 −6 cm −1 Completed Summer SURF Model Prediction

N=34, ℓ/r = 6.4 field profile B. PlasternEDM November 2007 Collaboration Meeting First-iteration map

N=34, ℓ/r = 6.4 field profile B. PlasternEDM November 2007 Collaboration Meeting

N=34, ℓ/r = 6.4 field profile B. PlasternEDM November 2007 Collaboration Meeting Mispositioned groove predicted to generate gradient of wrong sign First-iteration map Second-iteration map Correction should exacerbate gradient !!

N=34, ℓ/r = 6.4 field profile B. PlasternEDM November 2007 Collaboration Meeting Instead of trying to achieve “perfection”, instead decided to correct with a gradient coil Unwanted gradient ~linear Gradient coil N=2 cos θ coil winding, but as an “anti-Helmholtz” pair 1.0 A in N=34 12 mA in N=2 Current ratios Will no doubt face similar problems in “real” experiment

N=34, ℓ/r = 6.4 field profile B. PlasternEDM November 2007 Collaboration Meeting uniformity ~ 4  10 −5 (∂B x /∂x)/B 0 ~ 3 x 10 −5 cm −1 (∂B x /∂x)/B 0 ~ 5 x 10 −6 cm −1 scale-up to full-size desired (∂B x /∂x)/B 0 1  10 −6 cm −1

N=34, ℓ/r = 6.4 field profile B. PlasternEDM November 2007 Collaboration Meeting Test at 77 K

N=34, ℓ/r = 6.4 field profile B. PlasternEDM November 2007 Collaboration Meeting With ferromagnetic shield at 300 K Known for some time that N=34 uniformity worsens in presence of ferromagnetic shield Hence, reason for design of “modified” cos θ coils with wire positions offset from nominal ASU, S. Balascuta TOSCA Caltech, M. Mendenhall

Pb superconducting shield tests B. PlasternEDM November 2007 Collaboration Meeting Pb superconducting shield Radius = 9.5 cm Length = cm Accommodates N=40 prototype cos θ coil + ferromagnetic shield 4K dewar from J. Eisenstein group (Caltech condensed-matter) Baffled heat-shield neck (5 layers of Cu-coated PCB) Feedthroughs for probe (z-motion only), leads, sensors, etc. Pb T c = 7.2 K 1/16”-thick, on Al frame

Pb superconducting shield tests B. PlasternEDM November 2007 Collaboration Meeting First set of tests, August 2007 Initial cooldown of Pb shield from ~100K required ~60 ℓ of LHe Only one temperature sensor mounted at top of shield One initial test, (only) Earth’s field locked-in during transition through T c 80 Gauss axial field (Helmholtz coil) applied after T < T c Probe oriented for axial measurements, B z (z) Lower limit on axial shielding factor of ~ 200 (limited by power supply) top of shield consistent with residual background 80 G

Pb superconducting shield tests B. PlasternEDM November 2007 Collaboration Meeting Second set of tests, early-September 2007 Setup to test N=40 cos θ coil + ferromagnetic shield mounted within Pb shield Received 2 new temperature sensors, mounted near bottom/middle of Pb Test failed, unable to cool entire assembly to 4 K with 120 ℓ LHe Later hypothesized that an Al plate that coupled cos θ coil onto its support stand obstructed flow of LHe to bottom of dewar Idea was to map B x (z) for coil+ferro+Pb, compare with TOSCA

Pb superconducting shield tests B. PlasternEDM November 2007 Collaboration Meeting Third set of tests, mid-September 2007 Identical setup of N=40 + ferro + Pb Coupler support plate reamed out Leads for 3 temperature sensors, cos θ coil DC leads, degaussing coil AC leads, magnetometer probe, etc. Successfully cooled entire assembly from ~100 K to 4 K with 120 ℓ LHe T < T c for ~30 hours No LHe level sensor

Pb superconducting shield tests B. PlasternEDM November 2007 Collaboration Meeting Map of B x (z) for N=40 cos θ coil + Metglas + Pb at 4 K Thanks to S. Balascuta (ASU) for TOSCA calculations Precision limited by “hand mapping”

Pb superconducting shield tests B. PlasternEDM November 2007 Collaboration Meeting During warmup, field at center recorded every ~3 seconds Demonstration of effectiveness of superconducting shield at screening time-varying backgrounds Power supply stability better than ~5 × 10 −5 ; fluctuations at T > T c from background fluctuations leaking through ferromagnetic shield

Future R&D work B. PlasternEDM November 2007 Collaboration Meeting Attention now focused on construction of a 1/2-scale prototype modified cos θ coil and ferromagnetic shield acrylic tube 24” O.D. 6’ + 1.5’ (glued) 3-ring set of acrylic “rings” Not “true” cos θ coil; wire positions optimized for uniformity in presence of ferromagnetic shield

Future R&D work B. PlasternEDM November 2007 Collaboration Meeting Status Acrylic materials on hand since August 2007 Machining to be done at the Caltech HEP shop Plagued by delays at machine shop (i.e., were considered low priority) Recently (last week, after 2-month delay) HEP shop arranged for outside shop to start machining on the acrylic rings Also in process of upgrading our automated mapping system to accommodate the 1/2-scale coil and the 1/2-scale dewar Goal is first results (perhaps not best !!) by April/May/June time-scale 25’-tall structure, Caltech HEP high-bay area