Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects June 2009.
Advertisements

Update on FCPS Construction/Renovation Projects July 2009.
Update on FCPS Construction/Renovation Projects September 2009.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
Edward Downer Elementary School Playfield Renovation Status Update 10/14/14.
Coronado Elementary School Project Status Update 05/13/14.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Update on FCPS Construction/Renovation Projects August 2009.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Edward Downer Elementary School Playfield Renovation Status Update 06/10/14.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Arlington Elementary – Renovation Architect: RossTarrant Architects General Contractor: W/S Construction Substantial Completion Date:August, 2010 Contract.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
SCHEMATIC DESIGN PRESENTATION
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Rev: Section 3 Framing Operations. Rev: Learning Objectives: Section 3 Understand when fall protection must be provided Evaluate the use.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
Which Standards might apply to these hazards
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
Jake Garziano Period 3 Jake Garziano Period 3. » #outlookhttp:// #outlook »
Harding Elementary School Exterior Repairs & Select Roofing Replacement 11/18/2014.
POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING October 14, 2014.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
Exercise 9 Attributes and Attribute Reporting. Exercise: Attributing and Reporting the Citron House.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
Borough of Conshohocken Authority 2016 Odor Control Project
Bond Oversight Committee
Boardwalk Improvement Project
Hire Roofing Contractors in New jersey
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
Why We Arrived With Windows Upgrade Support ?
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
Hopewell Valley Regional School District
The Abriana Assembly Instruction By Laser Dollhouse Designs
How & When to Get Permits for Work in Your Home
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
Harding Elementary School, Ellerhorst Elementary School, and
14 Crow Hill Rise, Mansfield
416 UA College of Pharmacy Skaggs Building Addition and Renovation
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
PKL INVESTMENTS LTD Value of contract: Length of contract:
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Huntsville High School Sports Lighting Upgrades
Presentation transcript:

Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014

 General ContractorBest Contracting Services, Inc.  Architect of RecordGrossman Design Group  Construction ManagerWillie Robinson

 Contract Amount $918,600  Notice of Award06/17/14  Notice to Proceed07/21/14  Duration56 days  Completion Date09/15/14

 Contractor has mobilized & installed site surveillance  Set up stairs & scaffolding to access roof and walls for demolition  Demolition of exterior walls  Removal of windows on west side of building A

Removal of Cement Plaster at Exterior Wall

Removal of Existing Window at Exterior Wall

Scaffold Installed at Rear Courtyard to Access Roof

Guardrail Installed at Lower Roof

Play Yard Equipment Protection