Columbia School District 2013 Bond Program. I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES.

Slides:



Advertisements
Similar presentations
Forest Service and A/E Services
Advertisements

Welcome to the Academic year 2012/2013 The school prepares and conducts IGCSE Cambridge examination in Grade 10.(AE180) The AS Edexcel examination is conducted.
LET’S PLAY HVAC JEOPARDY ! CareersJack Facts Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final JeopardyJeopardy EducationFun.
Columbia School District 2013 Bond Program. I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES.
B ROOKSTONE S CHOOL Parents’ Meeting Teresa Young BPA President.
FY 2014 YEAR IN REVIEW SPONSORED PROJECTS EXPENDITURES OFFICE OF GRANTS & CONTRACTS
RISING CONSTRUCTION MANAGER CONFERENCE Washington DC ‘11 November 5-6  Grand Hyatt CMAA Student Chapter Presentation W ENTWORTH I NSTITUTE OF T ECHNOLOGY.
P RESENTED B Y M R. A LI A SGHER K HAN P ARTNER, H AIDERMOTA BNR &C O. & M R. S ABOOR K ARAMAT A SSOCIATE, H AIDERMOTA BNR & C O.
OSHA Federal Standards October 1, 2013 – September 30, 2014.
OSHA Federal Standards October 1, 2013 – September 30, 2014.
S AINT PETER PUBLIC SCHOOLS School Facilities Presentation Community Forum March 18, 2014.
2013 A SSESSMENT R OLL S KEENA – Q UEEN C HARLOTTE R EGIONAL D ISTRICT P RESENTERS : S COTT S ITTER – A SSESSOR, N ORTH R EGION T RACEY L OVE – S ENIOR.
Senior Thesis Hotel and Convention Center Schaumburg Structural Option Eric Yanovich S tructural O ption S chaumburg H otel and C onvention C enter S.
N ORTH G ODWIN E LEMENTARY S CHOOL. D EMOGRAPHIC I NFORMATION Total Number of Students (Kindergarten through 4 th Grade): 438 Ethnicity American Indian--.5%
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Elevating the Quality of Life in the District. INVITATION FOR BID (IFB) Elevating the Quality of Life in the District DEFINITION: An Invitation for Bid.
PRESENTED B Y B ARRISTER A LI K HAN& O WAIS A ZIZ, A TTORNEY.
A T DHRP WE ARE C URRENTLY D ISCUSSING E XCEPTIONAL O PPORTUNITIES FOR : C ORPORATE F INANCE M ANAGER | Management Constultancy| N EGOTIABLE D EBT R ESTRUCTURING.
B ERKELEY C OUNTY S CHOOL D ISTRICT C AINHOY /D ANIEL I SLAND H IGH S CHOOL C ONCEPTUAL P RESENTATION April 24, 2014.
You passed the Bond or secured some funds What do we do now? 2014.
G RAND R APIDS P UBLIC S CHOOLS P HASE I P ROJECTS.
Copyright © 2016 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
A DDING C OINS AND D OLLARS Ms. DeWitte’s First grade class.
A DDING C OINS AND D OLLARS By the first graders.
OSHA Federal Standards October 1, 2014 – September 30, 2015.
OSHA Federal Standards October 1, 2014 – September 30, 2015.
Best 20 jobs jobs sites.
G REENWICH P UBLIC S CHOOL LIBRARIES RENOVATION Presented by Sue Trainor Susie T Designs.
UOP ECET 370 W EEK 2 L AB 2
UOP ECET 370 W EEK 3 L AB 3 L INKED L ISTS
STAYER ECO 450 W EEK 4 A SSIGNMENT 1 S OCIAL S ECURITY I NSOLVENCY C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / ECO -450/
UOP ECON 545 E NTIRE C OURSE AND F INAL E XAM C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / ECON -545/ ECON ENTIRE -
UOP ECON 545 W EEK 5 C OURSE P ROJECT P ART 2 C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / ECON -545/ ECON WEEK -5-
DEVRY HRM 594 W EEK 7 C OURSE P ROJECT C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / HRM -594/ HRM WEEK -7- COURSE -
UOP IT 205 E NTIRE C OURSE C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / IT -205/ IT ENTIRE - COURSE F OR MORE CLASSES.
UOP IT 205 W EEK 2 A SSIGNMENT H OW C OMPUTERS W ORK P RESENTATION C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / IT -205/ IT.
UOP IT 205 W EEK 5 C HECK P OINT TXJ C OMPANIES C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / IT -205/ IT WEEK -5- CHECKPOINT.
UOP IT 205 W EEK 8 A SSIGNMENT H ARDWARE R EPLACEMENT P ROJECT C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / IT -205/ IT -205-
UOP IT 241 W EEK 1 C HECKPOINT A PPLICATIONS OF W IRELESS T ECHNOLOGIES C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / IT -241/
UOP IT 241 W EEK 5 A SSIGNMENT F LOOR P LAN S ITE S URVEY A PPENDIX D C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / IT -241/
KELLER MGMT 520 W EEK 1 TO 7 A LL DQ S C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / MGMT -520/ MGMT WEEK -1- TO -7-
MGMT 410 W EEK 4 DQ 1 E MPLOYEE O RIENTATION C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / MGMT -410/ MGMT WEEK -4- DQ.
MGMT 410 W EEK 6 DQ 1 B ENEFIT P ACKAGES C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / MGMT -410/ MGMT WEEK -6- DQ -1-
STAYER CIS 500 W EEK 10 T ERM P APER I NFORMATION T ECHNOLOGY S TRATEGIC P LAN NEW C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD.
UOP COM 220 W EEK 2 DQ 1 C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / COM -220/ COM WEEK -2- DQ -1- AND - DQ -2 F OR.
UOP COM 220 W EEK 7 W HAT ARE THE B ENEFITS OF B EING A P EER R EVIEWER C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / COM -220/
UOP COM 220 W EEK 9 F INAL P ROJECT P ERSUASIVE R ESEARCH P APER C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / COM -220/ COM.
UOP CJA 303 W EEK 1 D ISCUSSION Q UESTIONS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / CJA -303/ CJA WEEK -1- DISCUSSION.
UOP CRT 205 W EEK 2 E XERCISE R EVIEW Q UIZZES (C H 1, 2, AND 3) C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / CRT -205/ CRT.
UOP CRT 205 W EEK 5 A SSIGNMENT C ATEGORIZING F ALLACIES C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / CRT -205/ CRT -205-
UOP CRT 205 W EEK 8 E XERCISE R EVIEW Q UIZZES C HAPTER 12 C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / CRT -205/ CRT -205-
ASH HIS 204 W EEK 2 DQ 1 T HE P ROGRESSIVE M OVEMENT NEW C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / HIS ASH - NEW.
BUS 620 ASH C OMPLETE C LASS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM /BUS-620-ASH/ BUS ASH - COMPLETE - CLASS F OR.
BUS 620 W EEK 4 A D C OMPAIGN - A RTICLE R EVIEW C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM /BUS-620-ASH/ BUS WEEK -4-
CRJ 306 ASH C OMPLETE C LASS - NO F INAL P APER C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM /CRJ-306-ASH/CRJ-306-ASH-C OMPLETE.
EDU 626 ASH C OMPLETE C LASS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / EDU ASH / EDU ASH - COMPLETE - CLASS.
EDU 626 W EEK 5 C RITICAL T HINKING Q UESTIONS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / EDU ASH / EDU WEEK.
ESE 691 C OMPLETE C LASS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / ESE ASH / ESE ASH - COMPLETE - CLASS F OR.
ESE 691 W EEK 5 S CHOOL W IDE P OSITIVE B EHAVIORAL I NTERVENTION AND S UPPORTS (SWPBIS) C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD.
ESE 691 W EEK 6 J OURNAL G ENERALIZING C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / ESE ASH / ESE WEEK -6- JOURNAL.
HHS 440 C OMPLETE C LASS C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / HHS ASH / HHS ASH - COMPLETE - CLASS F OR.
HHS 440 W EEK 1 F INAL P ROJECT T OPIC S ELECTION C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / HHS ASH / HHS WEEK.
Troy School District 2013 Bond Program – Series 1 Construction Update September 2016 Barton Malow | TMP.
Troy School District Bond Program – Series 1 Construction Update
Troy School District Bond Program – Series 1 Construction Update
Troy School District Bond Program – Series 1 Construction Update
Presentation transcript:

Columbia School District 2013 Bond Program

I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES P ROJECT C ONTACTS

P ROJECT S COPE R EVIEW C OLUMBIA I NTERMEDIATE / E LEMENTARY / A LT. E D -A DMINISTRATION R ENOVATION / S ECURE E NTRANCE INT/EL -U PGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT INT/EL -U PGRADE B UILDING HVAC AND C ONTROLS -U PGRADE B UILDING L IGHTING, F IRE A LARM, E LECTRICAL -U PGRADE T ECHNOLOGY

P ROJECT S COPE R EVIEW I NTERMEDIATE, E LEMENTARY, A LT. E D S CHOOL (BP 03) -A DMINISTRATION R ENOVATION / S ECURE E NTRANCE -U PGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT -R ENOVATE TOILET ROOMS -N EW CASEWORK -U PGRADE B UILDING HVAC AND C ONTROLS -U PGRADE B UILDING L IGHTING, F IRE A LARM, E LECTRICAL -U PGRADE T ECHNOLOGY

T IMELINE B ID P ACK 03 (I NTERMEDIATE, E LEMENTARY, A LT. E D ) – B ID D OCUMENTS A VAILABLE W EEK OF F EBRUARY 16, 2015 – B IDS D UE W EEK OF M ARCH 17, 2015 – B ID R EVIEW / P OST B ID I NTERVIEWS TO SUPPORT 3/23/15 AWARDS C ONSTRUCTION – F IRST PHASES AT INT/EL START 3/30/15. – R EMAINING B UILDING S TART A FTER S CHOOL 6/5/15. – A LL WORK S UBSTANTIALLY C OMPLETE F IRST W EEK S EPTEMBER 2015 FOR S CHOOL

T IMELINE

A NTICIPATED W ORK C ATEGORIES D EMO / A BATEMENT M ASONRY G ENERAL T RADES A LUMINUM / G LASS & G LAZING D RYWALL / A COUSTICAL / P LASTER R ESILIENT F LOORING AND C ARPET H ARD T ILE / T ERRAZZO P AINTING AND C OATINGS L OCKERS P LUMBING /M ECH /HVAC C ONTROLS E LECTRICAL / F IRE A LARM

Q UESTIONS & A NSWERS Question: Will there be a local preference for the bids? Answer: No, however the owner has the right to accept or reject any or all offers. Question: Will plans and specifications be available at ABC Reproduction? Answer: Yes. Bid Docs can also be reviewed on Granger FTP site. Question: Will the mechanical package be one package (Plumbing/HVAC) or separate packages? Answer: Separate packages Will this be a prevailing rate job? Answer: Yes Will certified payroll be required? Answer: Yes Will a bid bond be required in the amount of 5% be required? Answer: Yes Will a performance bond be required? Answer: Yes

C ONTACT I NFORMATION G RANGER C ONSTRUCTION C OMPANY M ATT L ERG GRANGERCONSTRUCTION. COM D ENISE S TYX GRANGERCONSTRUCTION. COM W EBSITE HTTP :// RESTORETHESOARWITHGRANGER. COM /