Utility Outage (Steam & Electrical) Commencing March 21, 2009.

Slides:



Advertisements
Similar presentations
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Advertisements

Substation L1/ MCC L1 Update March 21 st, Current Location.
Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005.
Design Review Planning to date Project scope summary
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
MAINTENANCE DEPARTMENT Presented by: John Argabright, Maint. Supervisor Muskingum River Plant APP Site Visit October 30 – November 4, 2006.
LOCAL ASSISTANCE 5 – YEAR PLAN Facilities Department Mark Thissell.
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
Mark Williams Facilities Engineering Manger Mike Joyner Project Manager - Power Services.
ICW Water Leak at FCC Forces a Partial Computing Outage at Feynman Computing Center J. MacNerland, M. Thomas, G. Bellendir, A. Walters May 31, 2007.
AFFILIATED ENGINEERS, INC. THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Presented to Houston Area Association of Hospital Engineering July.
Types of Heaters Steam Quaker Oats St. Joseph, MO.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
BAYSIDE UNIVERSITY OF MASSACHUSETTS BOSTON MAIN CAMPUS UNIVERSITY OF MASSACHUSETTS BOSTON 1 Administration & Finance Facilities Department FY13 Budget.
Infrastructure Improvements Dependable infrastructure for CSUCI campus… Dave Chakraborty Director, Planning, Design & Construction.
CWS 70ºF CWR 80ºF Cooling Tower Humid air Out with heat Dry air In Central Energy Plant A/C Unit Work EMCS 404 Chilled Water Supply 40ºF Chilled Water.
January 18, 2007 Campus Planning1 Update on Campus Planning and Construction Parnassus and Mission Bay Lori Yamauchi Assistant Vice Chancellor Campus Planning.
2004 SUMMER UNIVERSITY WELCOME !. AGENDA Overview Granger Center Tour Central Heating & Power Plant Tour Grounds Tour Optional - General Services Bldg.
UTC’s Central Energy Plant Humid air Out with heat Central Energy
Energy Management Through Measurement: Advanced Metering Stephen Durfee, LEED AP O+M, CEM Campus Energy Manager Bucknell University Lewisburg, PA
Utility Planning For North Campus Upgrades Area in and around Cook Physical Science Building Sal Chiarelli, Director of Physical Plant November 15, 2007.
Utilities Drawing Project U N I V E R S I T Y OF K E N T U C K Y.
PROJECT STARTED WITH V.P. OF BUSSINESS & FINANCE BOE LOOKED AT ENTIRE FREDERICKSBURG CAMPUS FOR POTENTIAL ENERGY CONVERVATION PROJECTS. 8 ENENRGY CONSERVATION.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Map of UAA Recycle Bins We have developed a detailed map of every communal mixed paper recycle bin in each building at UAA. * There are several plastic.
Electrical & High Temperature Utility Distribution Upgrade.
All-College Meeting August 20, You are here.
1 Mission First – People Always – America Forever Base Wide Natural Gas Outage GAS OUTAGE: DATE: TUESDAY 19 SEPTEMBER 2006 TIME: HOURS LOCATION:
Academic Learning & Teaching Center Utility Connections to existing infrastructure.
Heating Systems.
July 18, 2012 Presented by Marion Bracy Vice President FP&M The Long Road to Recovery.
 Net Student Revenues  2384 undergraduate students  Comprehensive Fee - $57,900  90% receive institutional aid –average aid $25,300.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Physical Plant 2015 All Hands Meeting Sal Chiarelli, Director of Physical Plant, UVM October 8, 2015.
AUBURN UNIVERSITY Capital Projects Program Facilities Management
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Greenhouse Management.  List the different types of heating systems used in a greenhouse.  Describe the advantages and disadvantages of each type of.
DISTRICT HEATING District heating is an infrastructure which allows heat generated in a centralized location to be distributed to residential homes and.
The Energy Policy and associated ECM Low Cost Project Energy Conservation at UNC.
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
FESS/Ops Shut Down Summary Week Ending 9/7/12. – FESS needs a CUB Cooling Outage for installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet.
FESS/Ops Shutdown Summary Nov 9 th, CUB Status – Boiler #1 ON Primary Recirculating Pump repaired Second Belly Pump to be Wired – Boiler #2 OFF.
Tyler Junior College Critical Infrastructure & Renovation Update Spring 2010.
FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.
Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.
Facilities Management
White Pigeon Community Schools
January 12, 2017.
UTILITIES MANAGEMENT.
Capital Projects Requests
UMCP Learning Objectives
REFERENDUM Your vote matters! September 26, 2017
FRESNO COUNTY WEST ANNEX JAIL
Facilities Report to the Buffalo State College Senate May 6, 2016
INTERNATIONAL EDUCATION WEEK
Map of UAA Recycle Bins We have developed a detailed map of every communal mixed paper recycle bin in each building at UAA. * There are several plastic.
2018 ING Chicago.
LED Savings and Simple Payback at the Music Building
Wednesday, March 20, :30 a.m. - 12:30 p.m.
Facilities and Capital Projects
Presentation transcript:

Utility Outage (Steam & Electrical) Commencing March 21, 2009

March 21 st Utility Outage Why are we doing this? What utilities will be shut off? How soon we will have them back on line? What maintenance is being completed? Who will be affected?

Why Are We Doing This? Mechanical Systems deteriorate –This is a systematic plan to:  Repair known problems  Extend the life of our equipment  To allow for major infrastructure improvements: –Siceluff Hall – Renovation –Electrical Spine – Freudenberger Hall Switches Scheduled for March 21 st –Weekend before Spring Break Heads Up: –One more Electrical Outage - May 2009

Utilities Affected: STEAM –Hot water –Kitchens –Humidity Control (Library) ELECTRICITY DOMESTIC WATER –No booster Pumps (above 5 th floor) –No hot water heaters CHILLED WATER FOR A/C

Steam System Shut Off: Saturday March 21 st at 1:00 am –Scope: Supports the Electrical Outage Steam Distribution System Repairs Condensate System Repairs –This is water returned to the boiler Turn On: Saturday March 21st - 2 hours after Electrical Power is restored.

Buildings Affected by Steam Outage: Art Annex Blair - Shannon House Carrington Hall Cheek Hall Craig Hall Ellis Hall Greenwood Lab School Freudenberger House Hill Hall Karls Hall Kemper Hall McDonald Arena Morris Hall (Taylor Health and Wellness Center & Bookstore) Plaster Sports Complex Plaster Student Union Power House Pummill Hall Siceluff Hall Temple Hall Wells House Woods House

Electrical Repairs: To increase reliability of our campus electrical spine To support switch replacement in the tunnels To support switchgear replacement at Siceluff Hall Saturday, March 21 st 9:00 am – 9:00 pm

Buildings Affected by Electrical Repairs: Art Annex Blair – Shannon House Carrington Hall Central Stores & Maint. Cheek Hall Craig Hall Ellis Hall Greenwood Lab School Freudenberger House Hill Hall Karls Hall Kemper Hall Kings Street Annex McDonald Arena Morris Hall (Taylor Health and Wellness Center & Bookstore) Plaster Sports Complex Plaster Student Union Power House Pummill Hall Siceluff Hall Temple Hall Wells House Woods House

Shutdown Summary: STEAM: Saturday, March 21 st – 22 nd 1:00 am – 1:00 am ELECTRICAL: Saturday, March 21 st 9:00 am - 9:00 pm

Questions?