ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

ODOT Structure Project Manager Training
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
CMGC Contracting at UDOT Program, Projects & Lessons Learned
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
By : Prof.Dr.\Nabil Mahmoud
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Utah’s Use of CMGC & Project Delivery
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
 Project Delivery  Design Considerations  Lessons Learned.
Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.
Introduction to ARA’s Proposal Resources Don Cole
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
St. Anthony Falls Bridge By: Timothy Brewer St. Anthony Falls Bridge Backround Location: Minneapolis, Minnesota Design: Steel Truss Arch Bridge I-35.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
TYPICAL member spot checks & alternate systems design study
Woodrow Wilson Bridge Project 1 Fish Protection Strategies on the $2.45B Woodrow Wilson Bridge Project ~Presented By~ Mike Baker, Environmental Manager.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Draft for Discussion & Policy Purposes Only
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
B A Y A R E A T O L L A U T H O R I T Y 1 Toll Increase Recommendation for the State-owned Bay Area Bridges BATA Oversight Committee January 13, 2010.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
There are 2 Types of Bridge Inspectors – Class B and Class A.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
1905 NW Thurman St Bridge. Project Location Thurman St Bridge.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
Offsite manufactured Bridges
High Bridge Re-Deck Project
Pearl Condominiums Philadelphia, PA
5th Street Bridge Replacement Project Contract No
Project Purpose and Objective
District 3 Complete Streets Projects
ALDOT Pavement Preservation Policy
US26: Cornelius Pass Rd -185th Ave
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
ABCD What’s New In Bridges
Board of Commissioners Meeting
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Walker Street Reconstruction Project 25% Design Public Hearing
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008

Agenda Introduction Introduction Existing Conditions Existing Conditions Preferred Alternative Preferred Alternative Questions Questions

Project Location

Marsha Drive Intersection

Hilliards Thorofare

Manahawkin Bay Bridge

East and West Thorofare

Long Beach Island Business District

Typical Bridge Lane Configuration

Existing Bay Bridge 2500’ Long, 17 spans 2500’ Long, 17 spans 4-Girder System with Transverse Floor Beams and Deck 4-Girder System with Transverse Floor Beams and Deck Tall Hammerhead Piers on Timber Pile Foundations Tall Hammerhead Piers on Timber Pile Foundations Generally Good Condition Generally Good Condition

Bay Bridge - Typical Fatigue Cracks

Bay Bridge - Fatigue Repairs

Trestle Bridges Simple Span Precast Concrete I Beams Simple Span Precast Concrete I Beams Hilliards Thorofare 475’, 11 spans Hilliards Thorofare 475’, 11 spans West Thorofare 368’, 9 spans West Thorofare 368’, 9 spans East Thorofare 485’, 11 spans East Thorofare 485’, 11 spans Timber Pile Bent Piers Timber Pile Bent Piers

Trestle Bridges Generally Good Condition Generally Good Condition

Trestle Bridges - Typical Pier Spalls

Trestle Bridges Undermining of Bearings

Trestle Bridges Typical Pier Repairs

Alternatives Original IPA Developed in 2005 Original IPA Developed in 2005 Original IPA Revised by Smart Solutions Original IPA Revised by Smart Solutions

Marsha Drive Improvements - IPA Add Turning Lane at Marsha Drive Add Turning Lane at Marsha Drive Prohibit left turn from 72 westbound Prohibit left turn from 72 westbound

Previous IPA Bay Bridge New parallel Bridge New parallel Bridge Replace Existing Superstructure Replace Existing Superstructure 2 Lanes Full Shoulders each way 2 Lanes Full Shoulders each way In the future can accommodate 3 lanes each way In the future can accommodate 3 lanes each way

Revised IPA Bay Bridge New parallel Bridge New parallel Bridge 2 Lanes and Shoulders (wide enough to carry 4 11’ Lanes for the rehabilitation of the existing structure) 2 Lanes and Shoulders (wide enough to carry 4 11’ Lanes for the rehabilitation of the existing structure) Rehabilitate the existing superstructure Rehabilitate the existing superstructure Bike/ped accommodations Bike/ped accommodations

Previous IPA Trestle Bridges Replace 3 Trestle Bridges Replace 3 Trestle Bridges Temporary Trestle for MPT Temporary Trestle for MPT 2 lanes and Full Shoulders each way 2 lanes and Full Shoulders each way In the future can accommodate 3 lanes each way In the future can accommodate 3 lanes each way

Revised IPA Trestle Bridges Rehabilitate 3 trestle bridges Rehabilitate 3 trestle bridges Deck Deck Piers Piers Superstructure Superstructure Bike/ped accommodations Bike/ped accommodations Preferred lane configuration to be determined Preferred lane configuration to be determined

Contract Sequence

Cost Summary PROPOSED IPA CONTRACT No. Total Construction Cost CONTRACT 1Bay Bridge - Minor Rehab & Marsha Drive Intersection7.34 CONTRACT 2New Bay Bridge CONTRACT 3Trestle Bridges - Major Rehab13.57 CONTRACT 4Bay Bridge - Major Rehab32.00 * $163 mill * Price reflects 2007 dollars PREVIOUS IPA $235 mill

Proposal Scoring STEP 1: Technical Proposal40% STEP 1: Technical Proposal40% STEP 2: Oral Presentation60% STEP 2: Oral Presentation60% Federal Goal of 15.6% ESBE

Technical Proposal Evaluation Criteria Project Manager 20% Project Manager 20% Key Staff 20% Key Staff 20% Project Approach 40% Project Approach 40% Firm’s Capability / Performance 20% Firm’s Capability / Performance 20%

Oral Presentation Evaluation Criteria Team Organization40 pts. Team Organization40 pts. Results Oriented Strategies70 pts. Results Oriented Strategies70 pts. Project Schedule/Network Logic50 pts. Project Schedule/Network Logic50 pts. Risk Analysis Strategies30 pts. Risk Analysis Strategies30 pts. Project Management Strategies20 pts. Project Management Strategies20 pts. (Scope, schedule, budget and Quality) (Scope, schedule, budget and Quality) Total Points for Oral Presentation210 pts.

Questions?