 Pascack Valley Cooperative Road Improvement Program ◦ 2008 - $ 350,000 ◦ 2009 - $ 325,000 ◦ 2010 - $ 130,000 ◦ 2011 - $ 768,000 ◦ 2012 - $ 510,000 

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
No Fault Asphalt has been providing asphalt services throughout Northern California for over 25 strong years. Certified by CALTRANS, and by several institutions,
A Guide to the Use and Performance of Permeable Pavements
West Michigan Strategic Alliance Historical Development of the Idea.
Annual Public Budget Hearing
Monday October 6, 2014 Blue Hill GOLF CLUB Registration, Practice, and Lunch begin at 10:30 a.m. Shotgun Start at noon. Dinner to be served at Season’s.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
Public Works Greg Chock Operations Manager Harlan Hanson Road & Bridge Engineer
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
LUNENBURG DEPARTMENT OF PUBLIC WORKS Pavement Funding and Maintenance.
6TH ANNUAL CONFERENCE.
City of Sunset Valley Drainage Master Plan Assessment Final Recommendation Report March 24, 2009.
1 Mantoloking & Super Storm Sandy. 2 AGENDA: Overview Current Status Short-Term Plan Long-Term Plan Resources.
Presentation to the TRSD School Board April 17, 2014 Michael Hollow, Grade 5.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
City of Lake Elmo · New Village Workshop-Focus on Infrastructure· January 20, 2007 PAVEMENT MANAGEMENT REPORT PREPARED: NOVEMBER 16,
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Pavement Quality Survey Study Session 2012 Pavement Quality Survey Results Rehabilitation Costs Recent Public Input/Activity Comparison of County R&B.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
Triskett Road Rehabilitation Lorain Avenue to West 117 th Street March 18, 2014.
Golden Triangle Blvd. Progress Report March 27, 2007.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
The Road to New Hampshire's Future. Transportation Funding Overview/summary Operational deficit Preservation and Maintenance Capital needs.
Douglas County Road Maintenance Funding June 27, 2011.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
STA Safety Project PID #76439 December 12, 2006.
Road & Street Maintenance Ballot Measure September 9, 2015 Corey Farkas, Streets Division Manager Travis Easton, Director of Public Works.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
MEC’S BLUEPRINT MISSISSIPPI LONG-TERM TRANSPORTATION/ INFRASTRUCTURE PLAN.
Public Works Department Hot In Place Bituminous Pavement Recycling August, 2011.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
STH 21 Adams County Project # Project Specifics Project Specifics Asphaltic Pavement Milling Asphaltic Pavement Milling Pulverizing Shoulders.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
Sjolander Road A Harris County Low Impact Development Roadway Project John Blount, P.E., LEED AP Director, Architecture & Engineering Division Harris County.
Great Lakes Restoration Initiative and State Level Policy Great Lakes Restoration Initiative and State Level Policy Healing Our Waters Conference September.
Driver Education Rural Driving 82% of all miles in the U.S. are Rural Roads. Collisions in rural areas are equal to 2 x as many highway deaths as in.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
RebuildIndy Indianapolis Department of Public Works March 2011.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure  Dealing with Traffic Growth &  Considering the needs of all Road Users.
Public Works Infrastructure Update Public Works Department April 5, 2016.
5 Quick Tips to Prepare Your House for spring
2010 Citizen Survey Results
2016 Mill and Overlay Project
PAVEMENT PRESERVATION
The Gainesville Area Chamber Infrastructure Investment Initiative
View display boards and speak one-on-one with staff
Ed Sullivan, Chief Economist PCA
What led to Temple Hill Road and Nirvana Gardens?
Town of Clayton 2016 Pavement Condition Survey
City Council Work Session July 5, 2017.
Definitions Common Area Maintenance Utilities Local Tax Assessment
City of Bloomfield Hills
Consolidated Plan Amendment Wednesday, May 10, 2017
SE 12th Street Roadway Improvements February 8, 2005.
2017 Calendar Year Budget Presentation
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
Construction Management & Engineering
Our Municipality’s Finances
Repair roof rafters / joists, soffit and fascia boards in this area.
Meadow Lane – Brandon Road Improvements Welcome!
2019 Capital Program Title of Presentation
Dover Farms Warrant Petition
Presentation transcript:

 Pascack Valley Cooperative Road Improvement Program ◦ $ 350,000 ◦ $ 325,000 ◦ $ 130,000 ◦ $ 768,000 ◦ $ 510,000  2012 Improvements to 1.8 miles of roadway ◦ 4.5% of Borough roads

 2012 Roadway Program = 1.8 miles

 The intelligent and proactive management of infrastructure  Borough will undertake a road assessment initiative to determine priority ranking of roads to be addressed on an annual basis  To maintain an elevated quality of life and appreciated home value for the residents of Woodcliff Lake

 Coordinated Road Assessment with DPW ◦ Condition, use, and age  16 roads were identified for rehabilitation ◦ Majority were last paved between years ago ◦ Milling & paving, minimal curb restoration, and inlet improvements  Improvements to 3.3 miles of roadway  2013 Impact = 8.25% of Borough roads

 2013 Roadway Program = 3.3 miles

 The Borough was 1 of 8 participating municipalities in the 2012 Road Improvement Program  $72.85 per ton asphalt price under joint bid by participating municipalities  Non-participating municipalities saw increased asphalt prices; ◦ $74.50, $83.80, and $90.30 per ton

West Hill Road Claire CircleFairview Avenue

Maria Road Fox Hollow Court Shield DriveFairview Avenue

Emery Lane Shield DriveAmy Ct & Michael St Maria Road

Sophie Court Fairview Avenue Claire Circle Shield Drive

West Hill Road Claire Circle Emery Lane Shield Drive

 The intelligent and proactive management of our infrastructure will result in elevated quality of life and appreciated home values for our residents