 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.

Slides:



Advertisements
Similar presentations
The presentation will follow this format:
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Meridian Road Interchange Rebuild ITD Board Meeting June 18, 2009.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Public Works Technical Services Working Together to Make a Difference 2012 Construction Projects.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
The Ministry of Transportation and Infrastructure welcomes you to an Open House for: Trans Canada Highway No.1 Improvements in Salmon Arm Your comments.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Dún Laoghaire Area Committee Meeting 8 th April 2015 Non Statutory Public Consultation Proposed Road Safety Improvement Works at Schools on Cross Avenue.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
 Manage Visibility –  6 second rule –  Judge gaps in traffic –  Signed Intersections –  T-Intersections –  4-Way Intersections -
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
MED SR 18 Corridor Project MED PID October 13, 2015.
Traffic Signs Part Two. What do these 2 signs tell you?
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
MD 30 (Hanover Pike) at Mt. Gilead Road
Improvements to Stockton Street
Geo Targeted Mobile Advertising
SR 2108-A13 – Forbes Avenue Corridor Improvements
Chapin Town Hall Meeting
UTILITY DESIGN SERVICES
District 3 Complete Streets Projects
Bill Good Chief Operations Officer
Work Zone Safety Review – District 1 - Duluth
Highway 169 Bridge Replacement & Pavement Resurfacing
Signs Test.
COACT ODOT Update September 13, 2018.
SE 12th Street Roadway Improvements February 8, 2005.
Design Criteria CTC 440.
Design Standards.
Commissioners Presentation
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Metropolitan District | mndot.gov
Are You Ready for This. .. The future of NC-191.
Project Location: 35th Ave HSIP8
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility along the US 202 corridor › The existing bridge does not meet current design criteria for the amount of traffic.

 Replace and widen existing bridge  Improve Limekiln Pike approach to Butler Avenue  Add right turn lane to Butler Avenue onto W. Main St.  Upgrade signals  Install ADA ramps  Temporary Pedestrian Bridge

 E&S measures staged to coincide with traffic control plan. Include: › Access road, on PennDOT property › Causeways accessing the bridge for construction › Cofferdams: in the stream › Sediment Basin / Stormwater Management Basin