Street & Highway Works Beacon Condition of Borough Principal Roads Gordon Prangnell
Street & Highway Works Beacon BACKGROUND BPRN DVI surveys started 1999 DVI – walked visual scheme surveys CVI – network tool UKPMS Role Tranche 1, 2 and 3 BVPI – Best Value indicators Options for Principal Roads – DVI CVI etc
Street & Highway Works Beacon Inspections? UKPMS DVI CVI Condition Index BV PI £’s
Street & Highway Works Beacon
Structural Condition Index Bands & Recommended Treatments
Street & Highway Works Beacon
SCANNER introduced Road Condition Index (RCI) BV 223 replaces BV 96 BV96 used TTS from 2004/05 DVI not permitted on PRN for PI London reporting DVI for resources
Street & Highway Works Beacon Red - Definitions SCANNER Maintenance to be considered soon DVI Requiring further investigation
Street & Highway Works Beacon 2007 – 2008 R&P
Street & Highway Works Beacon
TRENDS & RESOURCE ALLOCATION Reducing Red
Street & Highway Works Beacon RESOURCES Perception – insufficient resources Reds trends over 5 years are OK SCI – ‘the red’ reducing Amber?? Scotland – monitor ‘red and amber’ Look at Red and Amber
Street & Highway Works Beacon
TREND INDICATORS R = Reducing E = Even/Level I = Increasing
Street & Highway Works Beacon BoroughRedAmberRed & Amber BARKINGRRR BARNETRRR BEXLEYRER BRENTRRR BROMLEYRRR CAMDENRER CITYIRI CROYDONRRR EALINGRRR ENFIELDRER GREENWICHRER HACKNEYRER HAMMERSMITHEII HARINGEYRER HARROWRRR HAVERINGRRR HILLINGDONRRR HOUNSLOWRRR ISLINGTONRER KENSINGTONEEE KINGSTONRRR LAMBETHRRR LEWISHAMERE MERTONRRR NEWHAMRER REDBRIDGERRR RICHMONDRRR SOUTHWARKERR SUTTONERR TOWERHAMLETSEEE WALTHAMFORESTRRR WANDSWORTHRER WESTMINISTERERR
Street & Highway Works Beacon QUARTILE SCORES Red Red & Amber Quartiles Upper U/Middle L/Middle Lower
Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough /09 KINGSTONRRR27 BARKINGRRR39 KENSINGTONEEE36
Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough /09 CROYDONRRR412 HAVERINGRRR415 REDBRIDGERRR415 WANDSWORTHRER59 BEXLEYRER610 HILLINGDONRRR610 SUTTONERR68 BROMLEYRRR710
Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough /09 BARNETRRR511 HACKNEYRER715 HARROWRRR714 LEWISHAMERE713 WALTHAM FORESTRRR715
Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough /09 GREENWICHRER616 NEWHAMRER619 WESTMINISTERERR616 ISLINGTONRER914 EALINGRRR915
Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough /09 BRENTRRR816 HAMMERSMITHEII820 HARINGEYRER819 MERTONRRR817 ENFIELDRER918 HOUNSLOWRRR918 TOWERHAMLET SEEE918 CAMDENRER1018 LAMBETHRRR1019
Street & Highway Works Beacon RedAmber Red & AmberRed Red & Amber Borough /09 CITYIRI1321 RICHMONDRRR1524 SOUTHWARKERR1526
Street & Highway Works Beacon Funding TfL Model is robust More for less Eye on the Amber Further analysis SCANNER data YearAllocation £ ,000, ,000, ,218, ,027, ,730, ,105,000
Street & Highway Works Beacon END