A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,

Slides:



Advertisements
Similar presentations
The Belle II Silicon Vertex Detector Markus Friedl (HEPHY Vienna) for the Belle II SVD Group VCI, 13 February 2013.
Advertisements

17 February 2010 The Silicon Vertex Detector of the Belle II Experiment VCI 2010 M.Friedl, T.Bergauer, I.Gfall, C.Irmler, M.Valentan (HEPHY Vienna)
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
The Silicon Vertex Detector of the Belle II Experiment
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 6” Origami Module and Front End Electronics 6 th Open Meeting of the.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
Jochen Ebert, Uni Karlsruhe1 Powering via cooling pipes very first results.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Kodali Kameswara Rao TIFR, Mumbai
25 Oct 2011 The Silicon Vertex Detector of the Belle II Experiment IEEE NSS 2011 Thomas Bergauer (HEPHY Vienna) Valencia.
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
ATHENA - Module Construction P. Riedler, J. Rochet.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
The Belle II Silicon Vertex Detector assembly and mechanics
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Ladder Assembly All tools and jigs produced Glue dispensing works
Comments to the SVD4 structure
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall, A. Ishikawa, C. Joo, D.H. Kah, R. Kameswara, K.H. Kang, E. Kato, G. Mohanty, K. Negishi, Y. Onuki, N. Shimizu, T. Tsuboyama, S. Schmid, M. Valentan VCI 2013, 13 th Vienna Conference on Instrumentation

Outline Introduction Assembly Cooling Summary 2VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Motivation 3VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 ~1 km in diameter Super KEKB Belle II Linac About 60km northeast of Tokyo Super KEKB –Electron-positron collider –7 GeV e - on 4 GeV e + –Center of mass energy: Y(4S) (10.58 GeV) –Target luminosity: ~8  cm -2 s -1 Belle II detector –Refurbishment of all sub- detectors –40 times higher luminosity –Faster readout

Silicon vertex detector 4VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 Belle II SVD: 4 layers of 6 inch DSSDs Radii 38 to 135 mm Readout: APV25 –40 MHz / Tp= 50 ns –192 cells analog pipeline –ENC = 250 e + 36 e/pF Minimize capacitive load! Chips closest to sensors strips  chip-on-sensor Keep material budget low Belle (SVD2): 4 layers of 4 inch DSSDs Radii: 20 to 88 mm Readout: VA1TA –5 MHz / Tp = 800 ns –no pipeline –ENC = 180 e e/pF Read out from edge of ladders –long pitch adapters –up to 3 ganged sensors

The Origami chip-on-sensor concept 5VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 CF reinforced ribs 6” DSSD 1mm Airex sheet 3-layer flex circuit Thinned APV25 (100µm) Connection to Strips: –PA on top side –wrapped PA for bottom Single cooling pipe Trade-off between material budget & SNR 0.55 X 0 (averaged) n-side p-side

Belle II SVD Origami ladder Exploded drawing of a L6 ladder 3 different Origami flex designs –backward (-z), short tail –center (ce), for central sensor, long tail –forward (+z), routed along slanted sensor, complex shape 6VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Outline Introduction Assembly Cooling Summary 7VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

The evolution of Origami modules 2008: Introduction of concept 2009: Feasibility shown with 4” DSSD module 2010: First full-size module with 6” DSSD 2011: Re-design to fit mechanical requirements of Belle II SVD ladders 8VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

How to assemble ladder with two or more Origami flexes? Not possible sensor by sensor Combined procedure required 2-DSSD Origami module –2 HPK DSSDs –Two types of Origami flexes (-z and ce) –Single-layer PA0/PA1/PA2 Assembly of a 2-DSSD Origami module 9VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Attaching of pitch adapters (PA1 & PA2) 10VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 Align PAs to p-side of sensor Picked up with a vacuum jig Apply mask and glue –Ensures uniform thickness –Future: cutting plotter Place back onto sensor Curing of glue

Attaching Origami flexes Wire bonding p-side Placing sensors onto an assembly bench Optical alignment (not done this time) Attaching Airex sheets (in future: 1 per ladder) Glue Origami PCBs –pre-assembled APV chips –first CE –then –z Wire bonding n-side 11VCI 2013, C. Irmler (HEPHY Vienna)13th February z CE

Bend and glue PA1, PA2 12VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 PA1 & PA2 have to be bent toward top side Micro positioner with vacuum head Apply glue using masks Pre-bend PA and align vacuum head Align PA to APV and lower down Glue curing Followed by ~2500 wire bonds Custom vacuum nozzle

Attaching CF ribs Mount ribs on jig Place rib jig onto assembly bench Dispense glue Place sensors onto ribs Distance given by precise spacers Cure glue Remove spacers and lower down assembly bench 13VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Outline Introduction Assembly Cooling Summary 14VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Cooling of Origami APV chips 15VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 Cooling pipe ~10 W per ladder Efficient CO 2 cooling Single cooling pipe for several ladders –Little space for connections –Outer  1.6 mm Custom fixture to hold the pipe

Cooling contact requirements 1613th February 2013VCI 2013, C. Irmler (HEPHY Vienna) Re-mountable cooling pipe (no glue …) Easy and safe mounting (bond wires …) Avoid stress at sensor (thermal expansion) Efficient heat transfer –large contact area –compensate height differences of APVs –thermally conductive gap pads Electrically isolating Radiation hard material

Thermally conductive gap pad Heatload/APV: 0.35W Coolant temperature: -20°C Tube: –stainless steel AISI 316L –wall thickness 100μm Gap pad: 86/125 Keratherm –λ [W/mK]: 1.5W/mK –Very soft, 1mm thick –Radiation hardness was tested in October th February 2013VCI 2013, C. Irmler (HEPHY Vienna)17

Pipe clamp Hinge clamp: PEEK G450 micro water jet cutting –fabrication tolerance: 0.01 mm –Max. wall thickness:20 mm –Min. inner radius:0.1 mm Disadvantage: 2 parts Prototypes tested on 2-DSSD module 13th February 2013VCI 2013, C. Irmler (HEPHY Vienna)18

Cooling pipe mounting Clamp bases glued onto Origami PCB Keratherm strips placed onto APV chips Pipe put into camp bases Clamps closed 19VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Final Module with cooling pipe 20VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Improved version of clamp 21VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 Material: PEEK Improved shape Single part Clamp force: ~3 N Prototypes tested on dummy Works well Easy to assemble

Performance of CO 2 cooling 22VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 Temperature measured at 4 locations of the 2-DSSD module Stable operation for ~18 hours Nominal temperature: -20°C All temperatures within precision of probes  no warming of coolant Efficient heat transfer between chips and pipe (coolant) Temperatur [°C] Time Module Inlet Module Outlet Origami –z Origami ce

Beam test performance Beam test CERN SPS in October GeV/c (mainly pions) Module operated with CO2 cooling at -20 °C Signal-to-noise ratio: 23VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 Many noisy channels due to wire bonding problems (new wire bonder) Origami –z performed well (compared to single-sensor modules) Origami ce suffered from noisy channels

Outline Introduction Assembly Cooling Summary 24VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Summary Origami chip-on-sensor concept –A low mass on-chip readout for 6” DSSD (0.55 X 0 avg.) –Feasibility proven by several prototypes –Will be utilized for the Belle II SVD –Assembly procedure shown for a 2-DSSD module Two-phase CO 2 Cooling: –Single tube for several ladders –Design and prototypes of tube clamp available Beam CERN in October 2012 Ladder production scheduled for autumn 2013! 25VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Thank You 26VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Backup Slides 27VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Belle II SVD 28VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 APV25 chips Cooling pipe Origami ladder Sensor underneath flex circuit Pitch adapter bent around sensor edge End ring (support)

Team K. Kamesh (TIFR), C. Irmler (HEPHY), Y. Onuki (Tokyo U.), K. Negishi (Tohoku U.) 29VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 E. Kato (Tohoku U.) N. Shimizu (Tokyo U.)

Origami PCBs 3 types of 3-layer Origami PCBs: –backward (-z), short tail –center (ce), for central sensor, long tail –forward (+z), routed along slanted sensor, complex shape 30VCI 2013, C. Irmler (HEPHY Vienna)13th February z ce +z

Pitch Adapters All available in single- and double-layer designs PA0: short, n-side, glued onto Origami PCB PA1: first half of p-side strips PA2: second half of p- side strips 31VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 Bond pads of single-layer PAs

Attaching Airex We used one piece per sensor Later we will use a single sheet per ladder 32VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Attaching Origami hybrids 1.Aligned CE to sensor 2.Lifted it with Origami jig 3.Applied glue 4.Put back onto assembly bench 5.Waited until glue has been cured 6.Removed Origami jig 7.Aligned –z to sensor 8.Repeated from step 2. 33VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Attaching Origami CE 34VCI 2013, C. Irmler (HEPHY Vienna)13th February

Attaching Origami -z 35VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013

Bend and Glue PA1, PA2 – Apply Mask 36VCI 2013, C. Irmler (HEPHY Vienna)13th February : flatten glue 2 3: dispense glue 1: apply mask 5: remove mask

Final Module in Frame 37VCI 2013, C. Irmler (HEPHY Vienna)13th February 2013 Top and bottom views (w/o cooling pipe)