AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.

Slides:



Advertisements
Similar presentations
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
Advertisements

Bunch Merging at 24 GeV Goal: 16 Tp per bunch The scheme Set-up problems Result Future work to increase bunch intensity.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC 14 & 15 April :22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
Machine - Experiments January 12, 2005 Machine status.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Maintenance and Accelerator Support RHIC Start Up 12.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Maintenance and Accelerator Support RHIC Start Up 12.
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
Agenda Safety Schedule Machine and system reports 2/26/2016G. Robert-Demolaize, Time Meeting1.
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
Injector Status Jan. 19, 2016 Time Meeting Haixin Huang.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Thursday morning – optics correction
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Monday February 28th 8h00: Injection
Friday Morning 7:30 injection for fill 2908
Beam dynamics requirements after LS2
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Another Immortal Fill….
Monday 27th August & night
Wednesday 6.10 Morning: Quench test at 450 GeV
Presentation transcript:

AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang

2 Status l The cycloconverter of Siemens stopped working on Wednesday after the maintenance day. After some trouble shooting efforts, it was decided to switch to the backup Westinghouse motor generator. l Switched to Westinghouse on Thursday. Four hours later, next RHIC store was established. Most time was spent on the extraction setup. l There were some extraction issues but the performance was restored to Siemens level next morning. l The good part of using Westinghouse is that there seems no visible beam loss at f to p switch on the ramp.

Haixin Huang 3 Some Issues l There have been many AGS permit pulls lately. Most of them were due to misbehaved BLM E14. The real problem is that it turned RF off in the middle of next AGS cycle, which caused worse loss and was bad for RF cavities, too. The threshold for E14 has been raised to very high today. The short term solution is to skip the next AGS cycle and act on the permit pull by next AGS T0 (Greg). The long term solution is to add a permit module to react in real time with tunable delay(K. Brown). In the meantime, we should look at those BLMs on maintenance day. l There is occasional beam loss in the Booster related to the fuzzy b2b signal. l Booster inj. field wobbling. l AGS inj. field fluctuation and the related AGS extraction fluctuation (beam position, energy….). l The drool loss at extraction was mitigated by flatten the tune and bump size changes. But more can be done to make the two extractions equal.