Challenging the case for HS2 Jerry Marshall. The deeply flawed business case  Key question: is HS2 in the national interest?  2007: White Paper says.

Slides:



Advertisements
Similar presentations
Place (Distribution).
Advertisements

Megaprojects, jobs and regional regeneration: HS2 in the UK Mike Geddes Stop HS2
2009 Priorities & issues John Dickie Crossrail 2 Supporting London’s growth.
Energy Efficiency Strategy. THE ENERGY WHITE PAPER Energy White Paper sets out four key goals for energy policy to: Cut the UK’s carbon dioxide emission.
Securing a safe, sustainable rail network Michael Roberts Chief Executive.
Base Birmingham Connected Transport Tom Magrath Director of Strategy and Policy Centro.
Constructing Mobility Futures: The Case of HS2 Murray Goulden Robert Dingwall 1.
Investment appraisal Chapter 19. Shoplifting (UK) Cost UK businesses £4.4bn / year (£4,400,000,000) More than a third of all goods stolen are by shop.
Nef (the new economics foundation) “Austerity is the best way to reduce the deficit and get the economy back on track” Owen Jones, The Independent James.
The Power of One, or Why is Adherence important? This presentation has been placed on the Mitan web site since a number of contributors to the Professional.
Feb Travel Time and Sustainable Travel Behaviour David Metz Centre for Transport Studies University College London.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT When to invest in High Speed Rail Links and Networks Chris Nash Research Professor
Delivering a sustainable and future-proof railway in CP5 - and beyond 10 th February 2014 Tony Berkeley – Chairman, Rail Freight Group Institution of Railway.
Hugh Chaplain Transport for Greater Manchester / Rail North Thursday 6 th November 2014.
Department of Economics and BusinessBIS Phuket
AS Economics and Business The Current Economic Climate Unit 1 By Mrs Hilton for revisionstation.
What questions would you like to ask?. From which country does the UK import the most services? (1) Germany To which country does the UK export the most.
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT When is high speed rail economically justified? Chris Nash
The Scottish & UK economies, post-election Professor Brian Ashcroft Economics Editor Fraser Economic Commentary in partnership with.
The Role of Business Aviation in the European Economy Philip Thomas Oxford Economics 13 March 2013.
Crossrail – Jobs, Housing and Funding Bridget Rosewell: Consultant Chief Economist GLA Economics.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Transport and Regional Integration: European Experience Stephen Perkins 20 October 2011, Tokyo.
Quiz 1: Rail Transport Case Study, 2013 This quiz requires knowledge of the pre-release case study, the issues that lie behind it, and of the Unit 4b specification.
Recent Developments in UK Travel and Tourism BTEC National Travel and Tourism.
1Rail Group The Big Question Peter Wilkinson, Director, Rail Franchising.
Tough choices ahead Illustrating the choices and trade-offs in the next spending review Kayte Lawton and Amna Silim September 2012.
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
High Speed 2 The decision and next steps Jonathan Mitchell.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
 A high speed rail link from London to Yorkshire  Phase 1 is from London to Birmingham  Phase 2 is to Manchester and Leeds  The Institute of Economic.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
HS2 Steve Rodrick Chief Officer. Preferred Route The Misbourne Valley.
Overview  Overview of Irish Economy  Key Business Sectors  Skills requirements.
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
Equality is Better For Everyone. Manchester Young Greens November Who gets the benefit?
“The major economic problem faced by Canadians is a very slow recovery and weak job market, not government deficits or rising debt. But public spending.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
Aggregate Demand ECON 2. Aggregate Demand Aggregate demand is the total demand for a country’s goods and services at a given price level and in a given.
Road pricing. Why ? What is it ? How might it be introduced ? Where and when ? How might it work? Why ? What is it ? How might it be introduced ? Where.
CHESHIRE & WARRINGTON SUBREGIONAL TRANSPORT STRATEGY Delivering & Sustaining a £35bn Economy.
HOUSING, PLANNING AND THE GROWTH AGENDA ALISON BROOM CHIEF EXECUTIVE – MAIDSTONE BOROUGH COUNCIL.
9th November 2010 ICEA 1 Jim Steer Director, Greengauge 21 Director, Steer Davies Gleave ICEA 9 th November 2010 The case for High Speed Two (and three.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Busting the single narrative the debt crisis as just another story – or why are we prey to a single narrative? 1.
The Impacts of Government Borrowing 1. Government Borrowing Affects Investment and the Trade Balance.
Simon Ramsay President. Rail Freight Grains industry dependent on efficient rail transport Average of 2 million tonnes of grain moves by rail Predicted.
IGCSE®/O Level Economics
Gaurav Ashok Manoj Shiv Sujit.  The Montclair Paper Mill, opened since 1892, is the oldest and smallest of the ten mills owned and operated by General.
UNECE – SC2 Rail Security Analysis and economic assessment of rail transport security 1st October 2009 Andrew Cook.
AS: H OW THE MACROECONOMY WORKS Aggregate demand and the level of economic activity What happens to a snowball as you continue to roll it?
2.6 Aggregate Demand and the Level of Economic Activity What happens to a snowball as you continue to roll it?
The next part of the specification. The key factors of 1.5 There are basics that need to understood before we can start 1.5 – basic terminology.
Nottingham Workplace Parking Levy Sue Flack Director for Planning and Transport.
April 2016 HSR Workshop York 1 Jim Steer Director Greengauge 21 HS2 Objectives “what are the economic, operational (especially capacity and connectivity)
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
Impact on businesses of government policy
Rail North Manchester Airport Transport Forum
High Speed Rail Some Development Principles
CISI – Financial Products, Markets & Services
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
QUESTION ONE
The Policy Landscape and Housing Sector Trends Christine Whitehead London School of Economics Policy priorities for housing.
Qualitative Scenarios
Communications Toolkit.
Aggregate Demand Model
Marco Polo – Towards a policy revision
Presentation transcript:

Challenging the case for HS2 Jerry Marshall

The deeply flawed business case  Key question: is HS2 in the national interest?  2007: White Paper says HSR too expensive and too inflexible  2010: HS2 Ltd gives NBR as 2.7, i.e. £2.70 of benefit for every £1 spent. How did they do that?

How to get the right NBR Rule #1: Up the demand  Independent Transport Commission +35% ( )  Network Rail +70% ( )  HS2 +267% ( )

How to get the right NBR Rule #2: Add unrealistic benefits  Benefits assumed to 2085  Assume time travelling on trains is wasted and inflate this at 2% pa  Assume impossible ‘Uncrowding’

How to get the right NBR Rule #3: Stretch the rules on costs  Use lower optimism bias correction than normal  Ignore finance costs  Ignore operator profits

How to get the right NBR Rule #4: Assume no competition  Assume no competitive response, therefore high demand and price

How to get the right NBR Rule #5: Ignore disbenefits  Slower less frequent Virgin service will add 25 mins for Coventry travellers (p42 of Technical Appendix)  Ignore CO2 costs

How to get the right NBR Rule #6: Don’t learn from mistakes  HS1 running at 1/3 rd forecast demand, sold at 1/3 rd of cost “…at a cost of billions of pounds… passengers in Kent have seen their service transformed into the worst they have ever known” (Andrew Gilligan, Daily Telegraph)

So what is the NBR? Approx £1000 cost per household (Birmingham leg only) - Of which the Government will throw away £900…

But will there be local benefits?  Study for HS2 Ltd by Imperial College says new economic growth created by HS2 would be ‘very small indeed’ – maybe £8m pa.  HSR will redistribute economic activity between places but London is likely to be the main beneficiary.  It is said that 40,000 jobs will be created across the UK. But 30,000 of these will be in shopping centres so only a REDISTRIBUTION of jobs. Most of the rest are in construction at a net cost to the Government of over £1m per job. Guideline for regeneration projects is £27,500 per job.

What’s the visual impact? To avoid conurbations, HS2 passes through tranquil countryside which will be lost forever

What’s the visual impact? Security fencing

Viaducts What’s the visual impact?

Noise barriers What’s the visual impact?

What’s the alternative?  65% extra capacity possible with just extra rolling stock on WCML  DfT’s own alternative to HS2 (Rail Package 2) de- bottlenecks WCML, delivering required capacity by running more and longer trains (for just £2bn) and gives a better (3.63) NBR than HS2. Everything can be done incrementally against need – not relying on long- term forecasts. This option was buried by the DfT.  Further potential by bringing forward ERTMS and moving freight off the WCML  Further potential on Chiltern and Midland Mainline NB. In a time of austerity, can we afford the £34bn cost when we can achieve the same for £2bn?

Technology will cut business demand

Does it work elsewhere?  In 2008 US Amtrak’s Inspector General reported that six European nations’ operations required a subsidy of $42bn p.a.  “…Virtually no HSR lines anywhere in the world have earned enough revenue to cover both their construction and operating costs.” (US Congressional Research Service 2009)  “The high speed train is no longer such a good deal… This cost drift of the TGV also makes its competitors think. Veolia and its partner Trenitalia, which had announced the opening for the end of 2011 of a high speed link Milan - Paris via Lyon, have just changed their mind…” (Le Monde, 12 Jan 2011) NB. The HS2 cost to Birmingham (£160m/mile) is ten times the average cost per mile in France

Does it work elsewhere?

The Lille Myth Greater Lille unemployment rates (above) have risen in absolutely terms and relative to the national average since the arrival of the TGV in Greater Lille12,4 %14,3 %13,2 % France10,1 %11,7 %10,6 % Sources of data : INSEE Lille… has benefited enormously from the high speed hub… (Philip Hammond, Midlands Today, 24 Feb 2011)

Finally…  Can we afford it? Higher government spending as a proportion of GDP and public sector borrowing cuts growth  Security? Soft but high impact target for terrorists

In conclusion If it’s ever built, which I doubt, the high-speed rail link between London and Birmingham will be the biggest white elephant since Nellie packed her trunk and trundled off to the circus. (Paul Routledge, Daily Mirror) “The burning need in public transport is not for sexy, pointy nosed high speed supertrains, whose economics (and green credentials) simply don’t stack up. It’s for boring, unglamorous improvements to the quotidian services we actually use” (Andrew Gilligan, Daily Telegraph)