Documentation Control and Quality Control Presented by Shane Tyler and Gary Russell.

Slides:



Advertisements
Similar presentations
APPROVAL OF CHECK AIRMEN AND FLIGHT INSTRUCTOR
Advertisements

Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Lesson Objectives. 1. Learn how to finish Unit 4 Assessment 2.
Calibration Stand Update
Pre-stressed Concrete Initiative By Ken Logan. Pre-stressed Concrete Initiative Background Examination of standards within the industry Production of.
Final/Shipout Inspection Approved for Public Release.
EQUIPMENT VALIDATION.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
Integration and Test 14 October 2008 Martin Nordby.
Chapter 11 Quality Control.
Supplementary Training Modules on Good Manufacturing Practice
WILLBROS A Good Job On Time Hydrostatic Testing Practices Establishing Verifiable, Traceable, and Accurate Documentation August 20, 2013 Hal Ozanne Willbros.
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Ensuring of Traceability
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
Maricopa County Air Quality Department Performance Test Specifics Rob Arpino Environmental Engineering Specialist.
Calibration Savvy. Calibration and Conformance  Calibration: Check a measurement against a known universally recognized standard to determine any deviation.
1 Importance of Instrument Validation for Accredited Food Export Testing Labs.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
A CONSTRUCTION QUALITY ASSURANCE MECHANISM FOR GRENADA By Consulting Engineers Partnership Ltd.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Advanced Method for Renewable Ethanol by Direct Synthesis from Syngas for Renewable Fuel Applications Julia Fisher, Chemical Engineering, Arizona State.
MICE hydrogen review Approval process. Process Working group Document pack PPD Director & ISIS Director Prerequisite testing Completed action list Approval.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
A QUALITY IMPROVEMENT TOOL
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
May 2001, Istanbul Workshop Production Certification Process Status Jack Fowler.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Automation of the 27.1 kN Dead Weight Machine at NIST Kevin Chesnutwood, Samuel Ho NIST Mass and Force Group Stop 8222, 100 Bureau Drive Gaithersburg,
Marketing to Main Contractors Winning Work from a Main Contractor Paul Clarkson Iain Flatters Construction Director Group Procurment Manager.
ProCal Calibration Lifecycle Setting Up and Performing a Calibration.
BUS 401 Week 1 DQ 2 Financial Statements Financial Statements. View the Important Financial Documents video which looks at the fundamental financial documents.
CiDRA - Power Generation Applications
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
Test Equipment Diagram
Additive Manufacturing Measurement Uncertainty Emerzon Cruz Guandique
Setting Up and Performing a Calibration
BALANCE SHEET INFORMATION ON A WORK SHEET
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
ISUAL Product Assurance
Autotest – Calibrated Leak
Quality Assurance and Quality Control in Generics
Introduction to New Product Development (Documentation)
ChE 473K Plant Design R. Bruce Eldridge.
HMSWeb – Handover Management System
Designers’ Manual Appendix Contents
BALANCE SHEET INFORMATION ON A WORK SHEET
BALANCE SHEET INFORMATION ON A WORK SHEET
Quality as Organization Culture at rh
Pre-Operational Equipment Check
Installation Binder / IRR – an example
Chapter 11 Quality Control.
Company X Process Mapping Training
Manufacturing Process
SNS PPU Helium Vessel Design and Assembly
Permit To Work Contractor Management Module.
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
Position Available – Lab Technician
Position Available – Lab Technician
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Documentation Control and Quality Control Presented by Shane Tyler and Gary Russell

Maintaining ATEX Certification on the Sage Rio Mass Flow Meter Procedures and Documentation Procedures and Documentation ATEX NIST Traceability ATEX NIST Traceability Weekly Quality Meetings Weekly Quality Meetings QC and Final Testing (including Helium leak check on ALL volatile gases) QC and Final Testing (including Helium leak check on ALL volatile gases) Commitment to Quality Commitment to Quality

Procedures and Documentation for Maintaining ATEX Certification Various documents including assembly procedures to engineering meeting notes are being used to maintain this standard Various documents including assembly procedures to engineering meeting notes are being used to maintain this standard Document database and drawing database are beginning to intertwine for stronger traceability of parts used in construction of Rio Document database and drawing database are beginning to intertwine for stronger traceability of parts used in construction of Rio

ATEX NIST Traceability All of our calibration equipment and test instruments are calibrated through Transcat Metrology Services All of our calibration equipment and test instruments are calibrated through Transcat Metrology Services All calibration sheets are filed and re-calibration dates are noted by Document Control All calibration sheets are filed and re-calibration dates are noted by Document Control Any mechanical changes to Sage Rio must be pre-approved by TUV before being fully released in house Any mechanical changes to Sage Rio must be pre-approved by TUV before being fully released in house

Weekly Quality Meetings Quality meetings are held every Monday morning at 9:00am Quality meetings are held every Monday morning at 9:00am Quality Group has helped to streamline processes as well as help keep the company on task for delivering a quality product Quality Group has helped to streamline processes as well as help keep the company on task for delivering a quality product

QC and Final Testing Final QC checks the meter for any defects not found during assembly (this includes paperwork as well as accessories) Final QC checks the meter for any defects not found during assembly (this includes paperwork as well as accessories) Leak Testing using Helium leak detector Final QC checks Insertion type meters for leaks between enclosure and sensor head Leak Testing using Helium leak detector Final QC checks Insertion type meters for leaks between enclosure and sensor head

Commitment to Quality ATEX Certification only the beginning in demonstrating Sage quality ATEX Certification only the beginning in demonstrating Sage quality Developing Incoming QC Checks on ATEX parts Developing Incoming QC Checks on ATEX parts