1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

1 21st Review Meeting of Finance Controllers at Gauhati (Assam) Team (3) - Field Visit Report – Dated 28 th April’2009 Team – 3 Date of Field Visit : 28.
1 Team 2 Visit Team consist of Finance Controllers of the following States TTTTamil Nadu (Team Leader) HHHHaryana KKKKarnataka MMMMaharashtra.
TEAM -2 Place of visit – CLRC & VEC Profile of CLRC : Profile of CLRC : Habra – II CLRC, North 24 Pargana dist No of schools : 78 No of Teachers : 255.
MONITORING FUND MANAGEMENT SCHEME Today’s Software for tomorrow YOJNA.
State Project Office, SSA, Uttarakhand, Dehradun.
INTERNAL AUDIT Mechanism in SSA-MADHYA PRADESH. Staff sanctioned for Financial Management S.No.Name of Post Post sanctioned Post FilledPost Vacant State.
OVERVIEW OF CIVIL WORKS IN ODISHA STATE BY C. GANAPATHY, SENIOR CONSULTANT, TSG.
Benefits of having Optimal Technical Staffing & Supervision Structure for SSA Civil Works Sarva Shiksha Abhiyan Mission Gujarat.
SARVA SHIKSHA ABHIYAN, BIHAR In Bihar, we are adhering to the codal provisions of Earth Quake Resistant Building. Prof. P.K. Das, National Consultant,
The Social Audit Status
19 th Review Meeting of SSA - Kolkata Field Visit Report – Team – 1 Dated 24 th October 2008.
In the succeeding slides we will discuss financial issues as emerged in the 29 th Quality Review Meeting of Finance Controllers in May All these.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
By Satish Girotra Implementation of school infrastructure.
ZHRC/HTI Financial Management Training
Bihar Education Project Council PATNA ( BIHAR) Presentation on Accounts – Staffing, Training & Capacity Building Exercises (19 th Review Meeting of FCs.
Government of Jammu & Kashmir School Education Department National Programme of Mid Day Meal scheme in Schools.
Capacity Building Capacity building for financial Management Integral part for effective and efficient functioning of Financial Management Unit. Needs.
PROCUREMENT PLAN Procurement Schedule for Goods for SSA, NPEGEL & KGBV for Procurement Action Sl. No Description of Goods Name of the.
  Demographic Profile  Status of Primary & Upper Primary Education  Organizational Structure  Monitoring & Evaluation  Implementation  Action Plan.
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
EdCIL, Technical Support Group (SSA), New Delhi Presentation on Financial Management Assessment Tool 30th Quarterly Review Meeting of Finance Controllers.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Civil Works, SSA, Assam Every School Beautiful Every Child In School Every Child Learning A xom Sarba Siksha Abhijan Mission.
PRESENTATION BY FINANCE CONTROLLER - KARNATAKA ON COMPLIANCE TO ACTION TAKEN ON OBSERVATION OF INTERNAL AUDITORS.
Field Visit to DPO-Khurda Team-I M.P.,Gujarath,Jharkand,U.P., Chattisgarh,Nagaland, Chandigarh,Daman&Diu Shri Gopalan, Consultant,Edcil.
National Seminar on “Addressing Equity Issues in Educat ion” Community Involvement Towards Greater Equity - Andhra Pradesh Experience Rajiv Vidya Mission.
Implementation of FM Action Plan and Monthly Expenditure Plan Group-I M.P,Jharkand,U.P.,Gujarat, Chattisgarh,Nagaland,Chandigarh, Daman&Diu Shri Ved Praksh.
Roles & Functions of the three levels of Rural Local Government in WATSAN Programme Arvind kumar REGIONAL WATSAN COORDINATOR B-TAST ( DFID- SWASTH)
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
SARVA SHIKSHA ABHIYAN Uttar Pradesh
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
A. AGRICULTURE INSURANCE SCHEME
PRESENTATION ON CIVIL WORKS
PARAMETERS, STRENGTH & ISSUES FOR LOW PERFORMING STATE BIHAR AS ON
29 th Quarterly Review Meeting of Finance Controllers-SSA 12 th – 14 th May Shimla ( Himachal Pradesh) PRESENTATION ON FIELD VISIT TEAM - I.
STATUS OF FM ACTION PLAN OF THE STATES UNDER GROUP III (except Bihar) Sl. NoFM Action IssuesStates lagging behind in respect of the FM Action plan Future.
Recommendations of the 19 th JRM on Financial Management & Procurement 40 th Review Meeting of State FCs- New Delhi (30 th January 2014)
Annual Work Plan & Budget SARVA SHIKSHA ABHIYAN UT OF DAMAN & DIU 1.
Substantive Changes made in the Revised Manual on Financial Management & Procurement Approved by the PAB on 23 rd December, 2009 Annexure-U.
27 TH QUARTERLY REVIEW MEETING CUM WORKSHOP OF FINANCE CONTROLLERS FIELD VISIT OF TEAM III ON 29 TH OCTOBER 2010.
 Hygiene Programme School level – Hygiene awareness programmes Sub Project Area SchoolIdentified Programmes Progress Killiveddy T/M/U/ Killiveddy Maha.
Presentation by Rural Dev. & Panchayats Department Govt. of Punjab.
1.  Demographic Profile  Status of Primary & Upper Primary Education  Organizational Structure  Monitoring & Evaluation  Implementation  Action.
HYBRID RICE IN CROP RODUCTION (YEAR ) DEPARTMENT OF AGRICULTURE GOVERNMENT OF BIHAR.
2 Weak Accounting System Non-availability of copies of FMP Manual at District/Block Level. Non-availability of copies of FMP Manual at District/Block.
Dialysis Centers under PPP State Health Society, Bihar 1.
Public Grievance Redressal System “Samadhan”
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
LAKSHADWEEP SARVA SHIKSHA ABHIYAN STATE MISSION AUTHORITY WELCOME.
Presentation on MDM Monitoring of the State of Bihar Districts: Banka, Bhagalpur, Kaimur, Kishanganj, Purnia Conducted by A. N. Sinha Institute of Social.
IPPE II Number of Total Trainer AND Trainees State Resource Team S.No.Designation No. 1Programme Officers 4 2From JEEViKA 4 3 Civil Society Organisation.
Mid Day Meal Scheme MDM-PAB Meeting : Chandigarh on Ministry of HRD Government of India.
State Health Society, Bihar 1. Aims To undertake treatment and disposal of Biomedical Waste generated by various Govt. Hospitals in proper scientific.
Sarva Shiksha Abhiyan SSA, UT Mission Authority Andaman & Nicobar Islands loZ f’k{kk vfHk;ku CIVIL WORKS.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Asish Sen Director Meteorological Centre, Patna
National Rural Drinking Water Programme
PAB-MDM Meeting – Bihar
Enhancing Teacher Effectiveness in Bihar Operation
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
Overview of the Internal Audit unit of the Department
Supplementary Services Project Management Services.
Presentation by Disaster Management Department, Government of Bihar
Public Grievance Redressal System “Samadhan”
National Conference on Agriculture for Zaid/Summer Campaign 2019
Presentation transcript:

1 Existing Staffing and Supervisory Arrangements for Implementation of S.S.A. Civil Works Presentation by S.S.A. Bihar

2 CIVIL WORKS UNDER SSA BIHAR §Civil Works is a tool to provide access, retention and quality education to all the children of age group 6-14 years upto elementary level (class I to VIII) as per national norms. §Access Additional Class Rooms (ACR). New School Buildings (NSB). Model Cluster Schools under national programme for education of girls at elementary level (NPEGEL). Kasturba Gandhi Balika Vidyalaya (KGBV).

3 §Retention Toilets (particularly girls toilets), Hand pump, Kitchen shed, Electrification and child friendly elements (Slide, See-Saw, Swing and Acrobatic bar etc). §Quality Education A Block Resource Centre (BRC) in every Block for training of teachers. Cluster Resource Centre (CRC) for 1 day recurring meeting in every month for every teacher. CIVIL WORKS UNDER SSA BIHAR

4 IMPLEMENTATION OF SSA IN BIHAR §All the civil construction works except BRC and KGBV is carried out by VIDYALAYA SHIKSHA SAMITI (V.S.S.). §The VSS is provided technical training and manuals before start of construction work. §BRC construction is carried out by BRC construction committee.

5 §State Level Civil Works Management Structure is headed by Civil Works Manager (CWM). §CWM is assisted by one experienced Architect, one Assistant Engineer with additional support of State Resource Group Architect/Engineer Members. §Executive Engineer at district level with two Assistant Engineers and one Junior Engineer at every 50 Panchayat with additional support of District Resource Group Architect/Engineer members. Existing Staffing and Supervisory Arrangements

6 §At sub-district level there is a team of Junior Engineers and Technical Supervisors. §The District Magistrate (D.M.) is Chairman of SSA in the district. §The additional support of Engineers (other than SSA) have also been provided by D.M. for SSA civil works. §One Technical Supervisor is engaged for each 20 construction sites. Existing Staffing and Supervisory Arrangements

§At present 11 Executive engineers, 28 Assistant Engineers and 79 Junior Engineers are employed in all the districts. §The vacant post of A.Es. and J.Es. are in final stage of recruitment process. §In the second phase the vacant post of E.Es would be filled up. §At present 882 Technical Supervisors are engaged on per site Honorarium basis. 7 Existing Staffing and Supervisory Arrangements

8 §The work distribution for district engineering team have been prepared as per Administrative & Geographical condition of the district. §Recurrent trainings have been imparted to district engineers at state level. §Recurrent training have also been imparted to all the Technical supervisors at district level. Existing Staffing and Supervisory Arrangements

§225 nos. of applications were received for the vacant posts of A.Es. and 680 nos of applications received for the vacant post of J.Es. §The received applications for the post of A.Es and J.Es have been shortlisted. §The state Executive committee held on decided to conduct written test for selection of A.Es and J.Es in September October, §The vacant posts of A.Es and J.Es. would be filled up very shortly. 9 Existing Staffing and Supervisory Arrangements

§To impart training to V.S.S./Ad hoc Committee members regarding all aspects construction work such as drawings and estimates etc. §To acquaint VSS/Ad hoc Committee members regarding purchase of quality building materials. §To ensure the maintenance of Cash Book, Muster roll, Stock Book, Receipt and Expenditure Register, Site Order Book etc, by V.S.S. 10 Role of Technical Supervisory for implementation of S.S.A. Civil Works

§Entry of technical observations during construction work in site order book and its compliance by V.S.S. /Ad hoc committee. §To impart training to V.S.S./Ad hoc Committee regarding preparation of Statement of Expenditure (SOE) for expenditure incurred on building construction works §To enter measurement of the work done in Measurement Books. 11 Role of Technical Supervisory for implementation of S.S.A. Civil Works

12 Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works §The national level tender published for Third Party Evaluation works. §Out of 9 agencies who applied for 27 district, 6 agencies have technically and financially qualified for 21 districts. §6 agencies have been engaged for Third Party supervision, monitoring and quality evaluation in the 21 districts of Bihar for construction works under AWP&B and §The Third Party Evaluators have started submitting site visit reports.

13 S. N. GroupName of Consultancy Firm/Organization/Company 1Tirhut- II (East Champaran) Group No- 05 M/s. Geo-Chem Laboratories Pvt. Ltd (17/19) 2Patna-I (Patna-U, Patna- R, & Nalanda) Group No- 01 M/s. Nirmal Dev Construction (05/19) 3Purnea-II (Araria & Kishanganj) Group-09 M/s. Agricultral Finance Corporation Ltd. (06/19) 4Munger-II (Khagaria & Begusarai) Group No.-20 M/s. Agricultral Finance Corporation Ltd. (07/19) 5Purnea-I (Purnea & Katihar) Group No- 08 M/s. Geo-Chem Laboratories Pvt. Ltd (15/19) Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works

14 S. N. GroupName of Consultancy Firm/Organization/Company 6Koshi-I (Saharasa & Supaul) Group-13 M/s. N.C.C. National Construction & Consultant (09/19) 7Magadh –I (Gaya & Nawadha) Group-17 M/s. Geo-Chem Laboratories Pvt. Ltd (12/19) 8Darbhanga-I (Darbhnaga) Group No- 10 M/s. Nirmal Dev Construction (19/19) 9Darbhanga- III (Samastipur) Group No- 12 M/s. Geo-Chem Laboratories Pvt. Ltd (14/19) 10Patna-II (Bojpur & Buxar) Group No- 02 M/s. Geo-Chem Laboratories Pvt. Ltd (16/19)

15 S. N. GroupName of Consultancy Firm/Organization/Company 11Patna-III (Rohtas & Kaimur) Group No- 03 M/s. AAkar Abinav Consultants Pvt. Ltd. (18/19) 12Saran-II (Siwan) Group No.-16 M/s. Shree Shree Engineering and Financial Consultancy Pvt. Ltd. (04/19) Supervisory Arrangements for Third Party Evaluation for Implementation of S.S.A. Civil Works

16 The technical training of all E.E. /A.E., BEPC (SSA) at SLO, Patna Inauguration by Sri Rajesh Bhushan, I.A.S., SPD, BEPC, Patna Sl.No.Programme Officer / Technical ExpertSubject 1.Sri S. N. Pandey, CWM, Civil WorksQuality Control Works and good Construction practices. 2.Sri Pankaj Kumar, Architect, Civil WorksDiscussion on drawing under SSA. 3.Prof. Yogendra Prasad, Rtd. HOD, NIT, Patna (i) Structural Design Aspect (ii) Holistic Approach towards School Building Construction (iii) Quality Control Works and good Construction 4.Prof. Nirmal Kumar, Professor, MIT, Muzaffarpur 5.Sri K. N. Gupta, Rtd. Chief Engineer, PHEDSchool Toilet-Water Supply 6.Sri Ashok Kumar Tiwary, SRP, AIEVidyalaya Shiksha Samiti 7.Smt. Shweta Sandilya & Smt. Priyanka Singh, SSHE, UNICEF, Patna BaLA & School Toilet 8.Sri U. K. Verma, CAO, Acctts. SectionAccounts related to Civil Works 9.Sri Mahendra Paswan, KGBV & NPEGELK.G.B.V. & N.P.E.G.E.L. (MCS) 10.Sri Rameshwar Pandey, IED & EFE.Basic Knowledge of I.E.D. & E.F.E. 11Sri Rajesh Thadani, MGT.Management 12Sri Ravi Shankar Singh, MISM.I.S. related to Civil Works 13Sri A.K. Pandeya, AIE & MediaBasic Knowledge of A.I.E.

17 The technical training of all Technical Supervisors /J.E., BEPC at District Level Office Inauguration by D.M. of district Sl. No. Component In-charge/ Technical ExpertSubject 1DSE-cum-DPCRole of VSS in building construction. 2Sri S.N. Pandey, CWM/ Sri Pankaj Kumar, Architect/Sri Rajesh Kumar Singh, A.E., SLO Quality Control Works and good construction practices & Discussion on drawing under SSA. 3.Prof. Yogendra Prasad, Rtd. HOD, NIT, Patna / Prof. Nirmal Kumar, Professor, MIT, Muzaffarpur (i) Structural Design Aspect (ii) Holistic Approach towards School Building Construction (iii) Quality Control Works and good construction 4Sri K. N. Gupta, Rtd. Chief Engineer, PHED School Toilet-Water Supply 5Executive Engineer (civil) / Assistant Engineer (civil) BaLA, School Sanitation & all Civil Works of SSA, Civil Works under 12 th Finance Commission, KGBC, NPEGEL (MCS). 6Accounts OfficerAccounts related to civil works

The Technical Training of all Bhawan Nirman Samitee (Part of V.S.S. Members) BEPC (SSA) at Block Level Office Inauguration by DSE-cum-DPC. of District Sl.N o. Component In-charge/ Technical Expert Subject 1Block Education Extension Officer (BEEO) Role of BNS and VSS in building construction. 2Assistant Engineers (Block Level)(i) Structural Design Aspect (ii) Quality Control Works and good construction practices & Discussion on drawing under SSA. 3Junior Engineers (Block Level)(i) Holistic Approach towards School Building Construction (ii) Quality Control Works and good construction 4District coordinator (TSC)School Toilet-Water Supply 5Technical SupervisorBaLA, School Sanitation & all Civil Works of SSA, Civil Works under 12 th Finance Commission, KGBC, NPEGEL (MCS). 6Accounts OfficerAccounts related to civil works

19 Photograph of School Building under Construction M.S. Sansariya, Nautan Block,W. Champaran (4Room ACR)

20 M.S. Madhubani District(4Room ACR) Photograph of School Building under Construction

21 Photograph of BRC Constructed Block Resource Centre at Muzafarpur

22 Cluster Resource Centre at Bhagalpur District Photograph of CRC Constructed

23 M.S. Parvati Girls, Ram nagar Block, W. Champaran (3 Room ACR) Photograph of Constructed School Building under SSA

24 Photographs of Constructed Kitchen Shed Kit. Shed at M.S. Parvati Girls, Ram nagar Block Kit. Shed at M.S.Segari Bahuari, Ram nagar Block

25