WWW.PMPLAN.COM Using LMPlan - Version 1.6 by AlNik Solutions, LLC Copyright 2011 ©

Slides:



Advertisements
Similar presentations
The essentials managers need to know about Excel
Advertisements

Little Used, but Powerful Features with GP Cathy Fregelette, CPA, PMP Practice Manager BroadPoint Technologies September 20, 2012.
CC SQL Utilities.
MS-Word XP Lesson 7.
Module 2 Navigation.     Homepage Homepage  Navigation pane that holds the Applications and Modules  Click the double down arrow on the right of.
An Introduction to Using
All rights reserved. Copyright G. Peifer 1 Using Computer Spreadsheets to Solve Equations 1.Log into the Network and open Microsoft Excel. 2.Finding.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Excel Project 4 Financial Functions, Data Tables, Amortization Schedules, and Hyperlinks.
© Paradigm Publishing, Inc Excel 2013 Level 2 Unit 1Advanced Formatting, Formulas, and Data Management Chapter 1Advanced Formatting Techniques.
GP2013 (R2) New features in GP2013 (R2). New Ribbon for windows Edit List is the Print button on the right without the paper background Action pane can.
Google Apps Access Google Apps from the Parkland Intranet Page:
Building Your Project Work Plan in March 2, 2007 HP Project & Portfolio Management by Dan Gallagher See NOTES page for Presentation Discussion, Tips &
Project Information: Customizing and Printing Lesson 7.
Exit Microsoft Outlook Skills Using Categories for Sorting, Filtering and Creating Group Oklahoma Department of Corrections Training Administration.
Microsoft Excel 2010 Chapter 8
Copyright 2003, Paradigm Publishing Inc. CHAPTER 4 BACKNEXTEND 4-1 LINKS TO OBJECTIVES Headers and Footers Margins Center a Worksheet Page Breaks Gridlines.
Inventory Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic or Figure.
Microsoft Office © Copyright William Rowan Objective By the end of this you will have being given a brief introduction to: Microsoft Word Microsoft.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Exporting Data and Creating Financial Reports with Excel and Crystal Slide 1 Exporting Data and Creating Financial Reports with Excel and Crystal By Peter.
Developing Effective Reports
Copyright 2007, Paradigm Publishing Inc. EXCEL 2007 Chapter 4 BACKNEXTEND 4-1 LINKS TO OBJECTIVES Margins Center a Worksheet Page Breaks Gridlines and.
Microsoft Word 2013 Bob Gill
1 Data List Spreadsheets or simple databases - a different use of Spreadsheets Bent Thomsen.
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
Virtual Interaction Manager
Microsoft Project – Tutorial 4 Assigning Resources to Tasks Switch to the Gantt Chart View Then click the Assign Resources button on the Standard toolbar.
Ahmad Al-Ghoul. Learning Objectives Explain what a Microsoft Project environment and Project Server. Describe how to use the Ribbon, Quick Access Toolbar.
Learning With Computers II (Level Orange) ©2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly.
Reporting in Version 5 Application Reports AKA: In Context or Right Click AKA: In Context or Right Click Export to Excel from Listing pages Management.
Analyzing Financial Data Lesson 9. 2 Lesson objectives  To discuss some of the tools QuickBooks gives you for analyzing financial data: QuickReports,
10/28/2015 San Antonio Independent School District Data Warehouse Maps/Streets Membership Demographics Assessments My Child.
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Access Project 7 Advanced Report and Form Techniques.
Microsoft Access 2010 Chapter 8 Advanced Form Techniques.
Unpublished Work © 2003 Treb Gatte Program Management Using MS Project Server Treb Gatte Wachovia Corporation Permission granted to MPUG-Charlotte for.
Course ILT Charts and printing Unit objectives Create charts; identify chart elements; change chart types; format charts; and move, resize, copy, or delete.
CERTIPORT EXCEL PRACTICE. EDITING SORT/FILTER/FIND & REPLACE In the Summary worksheet, sort the data in descending order by Order Number, and then in.
AESuniversity Ad hoc Reporting Version 5. for the special purpose or end presently under consideration concerned or dealing with a specific subject, purpose,
McGraw-Hill/Irwin The Interactive Computing Series © 2002 The McGraw-Hill Companies, Inc. All rights reserved. Microsoft Excel 2002 Working with Data Lists.
Gold – Crystal Reports Introductory Course Cortex User Group Meeting New Orleans – 2011.
Microsoft Excel 2010 Chapter 2 Formulas, Functions, and Formatting.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Chapter 3 Automating Your Work. It is frustrating when you have to type the same passage of text repeatedly. For example your name and address. Word includes.
With Microsoft Excel 2007Comprehensive 1e© 2008 Pearson Prentice Hall1 Chapter 4: PowerPoint Presentation GO! with Microsoft Excel ® 2007 Comprehensive.
Using Project Portfolio Tool ‘PMFolio’ by AlNik Solutions, LLC Copyright 2011 ©
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Copyright 2007, Paradigm Publishing Inc. ACCESS 2007 Chapter 6 BACKNEXTEND 6-1 LINKS TO OBJECTIVES Using the Report Button Using the Report Button Print.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
Microsoft Office 2013 Try It! Chapter 4 Storing Data in Access.
XP New Perspectives on Microsoft Office Access 2003, Second Edition- Tutorial 6 1 Microsoft Office Access 2003 Tutorial 6 – Creating Custom Forms.
Education And Training CTC IT DIVISION PivotLink User Training April 2010.
Lesson 17 Mail Merge. Overview Create a main document. Create a data source. Insert merge fields into a main document. Perform a mail merge. Use data.
Please wait, Our presentation will be starting soon. Use Alt+Tab key to go to other applications while the presentation is running. Use Esc key to stop.
TDA Direct Certification
Analyzing Data with Excel
Kanban Task Manager for Outlook ‒ Introduction
c.net5 Online Management
Boeing Supply Chain Platform (BSCP) Detailed Training
Chapter 7 Advanced Form Techniques
Microsoft Office Access 2003
Microsoft Office Access 2003
SSI Toolbox Status Workbook Overview
Managing Rosters Screener Training Module Module 5
Sirena Hardy HRMS Trainer
Introduction to Database Programs
Introduction to Database Programs
Approving Time in Kronos Manager/Supervisor Reference Guide
Upload/Download Inventory
Upload/Download Inventory
Presentation transcript:

Using LMPlan - Version 1.6 by AlNik Solutions, LLC Copyright 2011 ©

Contents Introduction to LMPlan –What is LMPlan –Data Flow in PMPlan Enterprise –Reports Using LMPlan –Assigning –Importing

Contents What is LMPlan Data Flow in PMPlan Enterprise Staff Breakdown Structures Relationships Expected Users and Permissions Reports Loading Importing

What is LMPlan? Part of PMPlan Enterprise Suite The Line Manager tool for assigning staff to projects. It provides reports to review these assignments in different ways. It provides the ability to import planned project loading from Project Management tools –MPM Project –MS Project –AlNik Solutions PMPlan

Custom Reports Standard Reports anDbManager (Database Administration) PMPlan Enterprise Tool Suite PMPlan (Project Management) Basis-Of-Estimate Labor Loading Other Direct Costs Budgets Company Accounting Data Company Rate Data Company Roster Data Work Breakdown Structure Objectives Deliverables Scheduling Importing Actual Estimate-To-Complete Earned Value Methodology Jobs CategoriesJobs RatesBurden RatesRosterActual Standard Reports Custom Reports LMPlan (Line Management) Planned Monthly Loading Data Assigned Monthly Loading Data Standard Reports Custom Reports PMFolio (Portfolio Reports) Balance Remaining Workforce Requirements Deliverables Milestones Revenues Cash Flow

LM ProjectsPM Projects Control of Enterprise Data LMPlan Line Manager’s Tool PMPlan Project Manager’s Tool BOE’s WBS Task Level, Schedule, and Daily Category Loading EVM Actual labor And Materials Monthly Project Plan By Category, Level, Requested Skill, and Requested Staff Monthly Project Staff Assignments anDBManager Database Administration Staff Pool Categories Skills Organizational Structures Rates Monthly Staff Projects Assignments

LMPlanDB LMPlan Work Flow Create Project Plan Create Project Plan PMPlanDB MS Project Import Project Plan Import Project Plan Assign Staff to Project Group Reallocate Staff Reports

Category Capacity Assessment Report After Setting the desired filters and conditions, click ‘Refresh Report’ button. Color code shows over/under load (in FTEs) Red or Orange = not enough project work for staff in that category Cyan or Green = Overcommitted

Capacity by Project Kinds Report This report shows another breakdown of capacity needs by project group with the ability to display bar charts by each selected job category. The dash line represents the desired billable goal for each job category. The solid line indicates the full-time capacity.

Summary Requests Report This report provides a condensed picture of job request for all selected projects and proposal. The red bar represents the employee head count for each job category. The blue bar includes long term temporary help. The yellow bar shows the billable goal for all employees, and the green includes temp labor. The symbols provide the minimum, average, and maximum monthly requirements.

Project Request Report This report provides monthly hours requests by Job Category and Project. The user has the option to group by Jobs (Left) or projects (Right) by dragging column header to group area.

Project Assignments Report This report expands on the ‘Project Requests’ report to include the work force assignments. This report can be grouped by Projects, Jobs, or Staff.

Group Assignments Report This report provides each line manager with the ability to get a summary of all of their staff.

Staff Roster by Job Categories Report This report provides management with the list of staff under each Job Category including Available (1.00 is full-time employee), Goal (The desired fraction of their work that should be billable), Billable (equals to Available * Goal).

Staff Assignment s or Printouts To reduce the list of staff to select from sets these filters as desired. After selecting staff, send work assignments to printer or . Can use to communicate work assignments to staff

Category Roster/Usage Combo Report This report combines information from the Capacity by Project Kinds, Staff Roster by Job Categories, and Project Request reports. Each sheet is for one job category. This multi-sheet report can be exported as a Microsoft Excel file.

Brief Hands-on of LMPlan

New Connection (or New Installation) Network location and SQL Server Name, which should be provided by the DB Administrator. Standard database for PMPlan Enterprise Suite. Practice version of Company’s PMPlan Database. Click to make sure the settings are okay.

A Process for Assigning Staff to a Project Assign staff to project Reallocate staff across all projects Inform Staff and Management of Assignments

LMPlanDB Main Form – Project Tab Provides form for assigning project plan to staff

LMPlan - Project – Staff Unassigned Project Assignments showing the unassigned resource loading for the highlighted project.

LMPlan - Project – Staff Assigned Project Assignments showing the assigned resource loading for the highlighted project. Right-Click Staff to view details of assignments to other projects. Hover over number to see where it came from. Hover over number to see assignment.

LMPlan –Staff to be Assigned to a Project Upper table shows the project plan. As work is assigned to the lower table, the hours in these cells will decrease. The goal is have all zeros. Lower table shows the to be assigned to for the selected project. To assign hours, you must have selections in both tables. Pick how hours are to be assigned. If hours is selected, up to the hours shown will be transferred. Once the assignment has been selected, click the Assign button to complete the assignment.

LMPlan - Staff Assigned to a Project Lower table now shows the assignments for the selected project. Upper table shows the project plan after assignment of all staff. As work was assigned to the lower table, the hours in these cells where decreased. The goal was to have all zeros. Change your mind; click the ‘Unassign’ button to return to the original unassigned state. To commit and save the assignment, click ‘OK’.

LMPlan Main Form – Staff Tab To see assignments of specific staff, select staff row and click here. To view all staff and be able to assign from any project, or to re-allocate resources to any staff, click here.

Assignments of Individual Staff The funnel are filtering symbols. Click on to set filter, which has a triangle if active. Select ‘All’ for turn off filter. Upper table shows all unassigns, if greater than zero.

Assigning to All Staff Assignments work the same here as ‘Assigning to Project’ View.

Staff Re-Allocation Selection Allocating by Staff is the same as Loading by Staff Assigned to a Project, but its by all Project Staff to a Staff Category. To Re-Allocate hours, you must have highlighted selections in both tables. Once the desired allocation has been selected, click the Assign button to complete the re-allocation. Select a category in which to re-allocate staff. Pick the hours to be re-allocated. If hours is selected, up to the hours shown will be transferred.

Staff Re-Allocation Allocating by Staff is the same as Loading by Staff Assigned to a Project, but its by all Project Staff to a Staff Category.

Staff Re-Allocation Commitment Change your mind; click the ‘Unassign’ button to return to the original unassigned state. To commit and save the assignment, click ‘OK’.

Tools for Administrators Controls which projects from PMPlan are imported into LMPlan and PMFolio Allows editing of custom fields used for filtering project list Allows editing of Project Kinds Listing

Custom Fields for Filtering and Sorting This indicates that this field will not be used. Click this to clear field A lookup list should be used to control what is entered in field cell. Can have up to ten fields If a value is removed, it will be necessary to edit values in the ‘Import Projects Table’

Project Kinds Listing The ID determines the order, but you must not change an ID value. If you want to insert a title, replace the titles of all items greater than the ‘insertion’ point. To delete an item, click in the row header left of the 5, then press Delete. After that re-titled as desired. To insert an item, click in the ID cell next to the *, enter 6. After that re-titled as desired.

Projects to Import This indicates that this PMPlan project should be imported The green cells for sorting and filtering Grey background is not selected.

Projects to Import (Continued) When you select a white cell a drop down list usually will be displayed. If a project is checked, make sure each of the white cells are set as desired. This should be 100 for active project, and less for Proposal based on expected chance of getting the work.

Manually Importing Projects This will import all of the select projects

Previewing/Printing/Exporting Can export to all these formats Add Water Mark to foreground or background Can control Page Setup Can edit Header and Footer Can attach report to

Using LMPlan Thank you, any questions?