iRAVE: integrated Reservoir Analysis & Viz Environment

Slides:



Advertisements
Similar presentations
Going Beyond Exploration
Advertisements

Indispensable tools for research at its best COS Pivot: Accessing Pivot and Managing Your Profile.
© Chevron 2005 Improving Team Collaboration with Rapid Visualization and Analysis of Key Data Project Team: - Steve Rees, Chevron - Bruce Grant, Chevron.
People EcosystemProcess Microsoft Dynamics GP 2010 R2 Enhance Insight Extend Connections Make It Easier People EcosystemProcess.
RAJAR Website Training Manual Berlin: March 2013.
Santa Fe Public Schools What is Inform?  Inform is a data warehouse provided by Pearson used to generate reports based upon students’ test scores.
Test Case Management and Results Tracking System October 2008 D E L I V E R I N G Q U A L I T Y (Short Version)
UT-Space Manager. Define Rooms The Define Rooms task is used to manage your room data. 1.On the Process Navigator, click on the Space Inventory & Performance.
Customizing the MOSS 2007 Search Results November 2007 Rafael Perez.
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Accounts Receivable Presented by: Robert Myers Presented by: Robert Myers.
MyFloridaMarketPlace Analysis 2.0 Functional Overview December 18 - December 19, 2007.
PETREL INTRODUCTION G&G
1 Asset Management Solutions Exploration  Drilling  Production  Seismic V 3.11.
Non-Class Events in Classroom Project 1 Classroom Scheduling & Utilization Project: Capturing Non-Class Events in Held in Classrooms March 25, 2009.
Accessing Waterflood Data on the ILoil IMS Mapping Website ILLINOIS STATE GEOLOGICAL SURVEY OIL AND GAS SECTION.
Vicon Industries Ltd Leading the Security Industry since 1967 Introduction to Vicon industries Ltd By Technical Support Department.
SiS Technical Training Development Track Technical Training(s) Day 1 – Day 2.
1 About Xcelsius Prasad BKR. 2 Agenda About Xcelsius and Editions Features and Components Comparison: MS Excel vs SAP Xcelsius Xcelsius.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 11 Managing and Monitoring a Windows Server 2008 Network.
CrackingSiebel.com Utility Siebel Repository Extract (SRE) Tool.
Oracle Finance Overview for IT Advisory Group September 2004.
ARCHIBUS Log On Instructions. Log Into ARCHIBUS Web Central Log In Screen 1.Open your Internet browser. 2.Enter the URL to view the ARCHIBUS Login Page.
Petroleum Engineering Presented by : Mostafa Khojamli November
Confidential Crisis Management Innovations, LLC. CMI CrisisPad TM Product Overview Copyright © 2011, Crisis Management Innovations, LLC. All Rights Reserved.
Geol 755: Basin Analysis Geophysics Week 1
Copyright © 2015, Drillinginfo, Inc. All right reserved. All brand names and trademarks are the properties of their respective companies. 1 DI Transform:
SMART Agency Tipsheet Staff List This document focuses on setting up and maintaining program staff. Total Pages: 14 Staff Profile Staff Address Staff Assignment.
OFC304 Excel 2003 Overview: XML Support Joseph Chirilov Program Manager.
Copyright © 2006 Knovel Corporation Streamline Your Science and Engineering Research
SALESFORCE.COM SALESFORCE.COM
Enhancements in Estimation and Bid Analysis Randy Lawton Info Tech, Inc.
CARLSON SOFTWARE CONFERENCE DANIEL V. SYPERSMA VICTOR GRAPHICS.
For Users : Username & Password for logging in to system : CME proposal to be added in system For System Configuration : Initial budget or latest updated.
New Features in Release 9.2 (July 27, 2009). 2 Release 9.2 New Features Updated Shopping Experience Home/Shop page Shop at the top search New Hosted Supplier.
Workflow for Finding Bypassed Reserves in Mature Assets  Real Time Integration of Simulation, Seismic Interpretation, and Geophysics  Best Answers Possible.
Lead Management Tool Partner User Guide March 15, 2013
FAMILY AND CHILDREN’S TRUST FUND (FACT) RESEARCH AND DATA MATERIALS.
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
Greta Robertson Kathy Hoffman /11/2011 SCEIS Finance Automated Interfaces.
Spotfire User’s Conference Oct PC-Reserves/Spotfire Interface New Spotfire Link to PC-Reserves Accelerates QC and Reserves Reporting John Pederson.
Visualization and analysis of microarray and gene ontology data with treemaps Eric H Baehrecke, Niem Dang, Ketan Babaria and Ben Shneiderman Presenter:
Developing software and hardware in parallel Vladimir Rubanov ISP RAS.
© 2008 Eventure Events. All rights reserved. Engaging Employees & Customers with SAP Interactive Forms by Adobe JT Wheeler Adobe Systems Incorporated.
Collaborative Digital Surveillance: Improving Decisions Through Visualization Technology Stephen Smart Subsurface Modeling Concepts, Inc.
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
© 2011 Autodesk Storm and Sewer Planning with AutoCAD ® Map 3D and Autodesk ® Storm and Sanitary Analysis Tanya West, PE, LEED AP Autodesk Technical Specialist.
Tom Beebe Project Manager
3 Copyright © 2004, Oracle. All rights reserved. Working in the Forms Developer Environment.
EMARS 3.9 Familiarization November Logging In Larger Font No overlap of text and picture.
HP PPM Center release 8 Helping IT answer the tough questions
Windchill PCS Overview for Engineers Product Cost System Overview for Engineers 03Sep2008.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
A Review of CPD Maps | ArcGIS | HUD Open Data Online Mapping Tools.
This document has been submitted on a confidential basis and contains proprietary information belonging to BigMachines, Inc. No part of this document may.
1 © 2004 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Cisco Technical Support Seminar Using the Cisco Technical Support Website.
Financial Reporting In Peoplesoft California Maritime Academy Data Warehouse Training Fiscal Year 2011/2012.
© 2015 Ex Libris | Confidential & Proprietary Yoel Kortick | Senior Librarian Primo Analytics.
Data Visualization with Tableau
Novel Data Integration for Production Optimization: Two Case Studies
Smart Versioning: Get Relevant, Save Money
NCJA ZoomGrants Overview Presented by: Lindsey Johnson
GIS - NetmapWEB Training Slides
Module 13: Creating Data Visualizations with Power View
EBSCOhost Digital Archives Viewer
PC Reserves/DecisionSite Integration Improved RAC Process
Presentation transcript:

iRAVE: integrated Reservoir Analysis & Viz Environment 2010 TIBCO Spotfire Energy Forum March 25, 2010 iRAVE: integrated Reservoir Analysis & Viz Environment Project Collaborators: Jeff Mathews, Chevron Perry Dobson, Chevron John Pederson, Chevron Troy Ruths, Chevron Contractor

Agenda What is iRAVE? Demo Project Overview How  iRAVE is used by Chevron NOJV Team for : Pre Drill well package review/approval Post Drill analysis Current Year Drill Well Results Reservoir Surveillance and Management Summary Conclusions Lessons Learned Best Practices Future Work

What is iRAVE? iRAVE Is an acronym for integrated Reservoir Analysis & Visualization Environment Created in the Spotfire environment

iRAVE Data Sources Files from Operator Monthly via DVD Current focus is static/dynamic reservoir and production data (no financials) Files from Operator Monthly via DVD Oil Field Manager (MS Access) – production & downtime WellView (MS Access) – well schematics and activities Sporadic Completion Schematics (Adobe PDF) Production Logging (MS Word) MDT Runs (MS Excel) Proposed Drill Production Forecasts (MS Excel) Weekly Well Test Report (MS Excel) Files We Generate (as needed) Well table including proposed drills and other well-specific data not supplied by Operator Log images (Petrel workflow)

iRAVE Data Upload MS Access-based data uploading tool Can specify which data to be updated (reduces wait time) Full upload takes ~30 minutes Data is copied to SQL Server, and new tables are created for use in Spotfire All done by our Geo Tech

Mars Oilfield Development 50 Km Aram Project Lake Basin Fields 3D Seismic 2099 1st oil 2111 NOJV project Operator: DXP (Delta Exploration Prospectors) 3D Seismic Survey There may not be Life on Mars but there is Oil. Who Knew? http://themis.asu.edu/features/aramchaos

Lake Basin Primary Fields Mars Oilfield Development Bebob Nigel Kohnen Montalva Aram Project Lake Basin Primary Fields Bebob Nigel Kohnen Montalva

Lake Basin Fields Geology Mars Oilfield Development Aram Project Lake Basin Fields Geology Similar to Earth Sand Shale Sequence Large Lake Basin Lacustrine Oil Y series – Yogi M series – Mars A series - Ares

MDP-422 SW Bebob, Aram Mars Confidential SW Bebob Surface Map Requesting approval for 6 wells in SW Bebob Field: Be303, Be304, Be305, Be441, Be445 and Be447. SW Bebob Development Currently 23 producers , 4 injectors Oil Recovery thru YE 2117 = 10.2 MMBO Estimated current SW Bebob EUR (decline curve) = 21.14 MMBO Forecasted incremental capture reserves from MDP-422 wells = 6.1 MMBO Planned Development (18 acre pattern infill) Multiple YO sands in area All wells to have M1-10 perfs All wells to have M1-20 perfs Tie in to Manifold Be152 SW Bebob Surface Map Producers Injectors New Wells

How Does the Chevron Team use iRAVE? The Chevron Team uses iRAVE for : Pre Drill well package review/approval Post Drill analysis & Current Year Results

Before we go live… We use the library function as opposed to WebEx or InfoLinks It can be easily saved on a laptop for portability at offsite meetings We will now go through the basic screens to show how we use iRAVE

Go Live

Well Package Proposal Example (MDP-422) Issues: Are well locations acceptable? Completion intervals okay?

Conclusions iRAVE is an emerging technology which enables us to keep up with Operator. Six rigs total 100+ new completions per year ~1,000 stims per year $500 MM - $1,000 MM annual Capex and Opex budget Only one geo and one engineer on Chevron team! Team activities in 2009 generated over $50 MM in NPV utilizing iRAVE and independent mapping to identify project opportunities iRAVE can be applied to other assets with minimal effort

Lessons Learned Integrated platform allows improved decision-making, in some cases, better than the Operator Splitting the process to compile data to a central server separate from the application allows easier adoption to other assets and easily integrate new data This process has helped us influence the Operator by challenging their analysis methods (i.e., IP rates were always optimistic) Plan for due diligence, that is, data clean-up, and influence Operator to improve data sources

Best Practices 2009 Drilling Results plot – recognized by Chevron’s Internal Reserves Advisory Committee as best practice (type curves and comparison to actual new drills) MDP post-drill analysis – has helped to influence Operator to review their proposals in more detail Mid 2117 Package Early 2118 Package

Future Work Integrating other data elements Stimulation Results Pump Replacements Production Attribute Background Maps Well Pay Summaries Simulation History-Match Data Application windows Stimulation Uplift Tracker & Predictor Areal Bubble Maps Waterflood Analysis After-Before Compare (ABC) Plots Downtime Analysis Artificial Lift Analysis Front-end to Business Plan and Reserves Documentation

Questions? Thank You!

Backup

iRAVE (integrated Reservoir and Visualization Environment) Mars Rock Names* Rock Name Mission Bebob Mars Pathfinder Tigger Mars Pathfinder Nigel Mars Pathfinder Kohnen Mars Rover Spirit Macquarie Mars Rover Spirit Montalva Mars Rover Spirit Mackinac Mars Rover Opportunity * from Wikepedia

iRAVE Mars Rock Names* Rock Name Mission Yogi Mars Pathfinder

Aram Overview Links to left to key pages Mention Top Lists Map-click on well location to pick Lower right has historical completion counts Lower left displays downtime volumes by month Filter Panel- can filter down to whatever groups you want

Well Portal Can pick a single well by clicking or CNTL-F Note well test data is current thru the past Monday Well schematic is simplified to see completion type and perf zones Log section was created from Petrel workflow Jobs gives us history of well related events Production curve shows historical Click on MCP or PLT links in upper left to get completion or PLT files

Production Analysis Move to this page to see some details Note the Jobs section, how you can hover over it to see details For this particular well, note the stim jobs

MDTs Highlight a group of wells on map or use CNTL-F Show how hovering over a point will give details Note historical pressures over time on bottom plot

Select Fault Block Click on Chad Overview and Limit FaultBlock to K02 & K03 Must manually zoom to fault block for now Note well lists on top, completion history on bottom Hover over a well name to see other places it exists on screen.

Well by Well Analysis Click to Well Portal page Zoom in on fault block in map Now hover over wells on map to see details Click on one to see everything else Can click on Production Analysis page to see detail of profiles and Jobs

Post Drill analysis – Be820 Dashed red lines represent original pressure. Left or below red line is under-pressured.

Well Production Forecast Results We use historical data to generate Type Curves for economics. This plot helps us fine tune our forecasts and see if we are on target.

MDP Lookback Cums Click to MDP Lookback Cums page Click on an MDP Package in plot on bottom left It will give MDP total on top, by well on right

MDP Lookback Rates Click to MDP Lookback Rates page It will give MDP total on top, by well on right