Presented by: Ronald O. Nichols LADWP General Manager

Slides:



Advertisements
Similar presentations
Mojave Water Agency: How we are trying to avoid our own liquidity crisis Kirby Brill General Manager, Mojave Water Agency Business Development Association.
Advertisements

LADWP WATER SYSTEM CAPITAL PROGRAM UPDATE July 25 th 2013.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Onondaga County CSO Abatement Gray Project Update.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
City of Modesto FY Proposed Budget Utility Funds Utility Planning & Projects Public Works Finance.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
Main San Gabriel Basin Management BASIN REPLENISHMENT by Anthony C. Zampiello San Gabriel Valley Water Forum Presented August 28, 2012 SAN GABRIEL VALLEY.
Groundwater Management in the San Gabriel Valley Tony Zampiello Main San Gabriel Basin & Raymond Basin Watermaster Watermaster.
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
San Gabriel Valley Water Forum August 28, 2012 San Gabriel Valley’s Water Supply A Plan for the Future San Gabriel Valley’s Water Supply A Plan for the.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Tigard_WSP_0410. Existing System Miles of Pipe 2.Twenty One Pressure Reducing Valves (PRV) 3.Seven Pump Stations 4.Two Aquifer Storage and Recovery.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
1 Investing in your water … investing in your future California American Water General Rate & Conservation Case Applications.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
1 Recycled Water Program for the City of Los Angeles.
Money Talks: Stretching Precious Dollars Drinking Water State Revolving Fund December 11, 2013.
Presentation prepared by: Toni Crosby Antoinette Aguirre Mike Belanger Beata O’Brien.
Where is fresh water found? What are some California water sources?
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Los Angeles River Watershed
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
1 Public Hearing User Rate Adjustments April 8, 2008.
September 18, 2002 Master Recreation Plan Team Kick-Off Meeting Comprehensive Everglades Restoration Plan.
Groundwater Assessment Study for the Metropolitan Water District of Southern California Southern California Water Dialogue May 2008.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
California Water Jeffrey Kightlinger, General Manager
Chris Stone Assistant Deputy Director Water Resources Division.
San Gabriel Valley From Stormwater to Supply
Building New and Sustainable Water Resources for Los Angeles Urban Water Institute Spring Conference February 2016 February 2016 Martin L. Adams, P.E.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Protecting the Lives of our Community Every single day, much of what we do goes by without much notice. Without fail, we work hard to protect the lives.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
Colorado Springs Utilities CH2M HILL Alumni Retreat
Top Five Reasons Three Valleys Needs WaterFix
January 18, 2017 City of San Diego
Irvine Ranch Water District Distributed Energy Storage Case Study
What’s Next for Potable Reuse in California
Homeowner Responsibility
STATEWIDE DROUGHT RESPONSE: IMPACT TO SOUTH ORANGE COUNTY
Zone 7 And WaterFix March 7, 2018
Top Five Reasons San Gabriel Valley Needs WaterFix
Top Five Reasons Three Valleys Needs WaterFix
Top Five Reasons Los Angeles County Needs WaterFix
Southern California Water Dialogue
Homeowner Responsibility
Breaking Bad: The Challenge of Aging Infrastructure
Top Five Reasons Los Angeles County Needs WaterFix
CBEWP Chino Basin Conjunctive Use Environmental
California Water Commission
Presentation transcript:

Presented by: Ronald O. Nichols LADWP General Manager CMAA Southern California Chapter Water & Wastewater Agency Night Capital Program Updates Presented by: Ronald O. Nichols LADWP General Manager

Major Capital Programs Regulatory Compliance Reservoir Covers & Bypasses Trunk Line Replacement Safe Drinking Water Program Recycled Water Stormwater Capture Customer Conservation Programs Groundwater Cleanup & Management Local Water Supply Program Replace aging pipeline and related infrastructure, including regulator stations, pumping stations, and maintaining the LA Aqueduct Water System Reliability Program

Planned 3-Year Capital Investments Program FY 2011/12 FY 2012/13 FY 2013/14 Safe Drinking Water $188 M $214 M $316 M Local Water Supply $71 M $137 M $165 M Water System Reliability $275 M $300 M $345 M Total $534 M $651 M $826 M 3

Project Delivery In-house Capabilities Design Construction Construction Management Design-Bid-Build is LADWP’s primary method of contract project delivery, but planning to use CM at Risk for Headworks Reservoir Select projects may be a mixture of in- house and contract resources

Professional Services Contracts As-Needed Engineering Services Contracts with several engineering firms Design, Estimating, Value Engineering $10 Million As-Needed Construction Management Contracts with several CM firms CM services, inspection, staff supplementation $12 Million

Safe Drinking Water Program Reservoir Improvements Projects are part of a 20-year compliance agreement Invested over $400 M to date Remaining Five Reservoirs CA Dept. of Public Health Deadlines Estimated Budget Silver Lake Dec 2013 $230 M Ivanhoe Nov 2014 Elysian Aug 2015 $35 M Upper Stone Canyon Jan 2017 $25 M Los Angeles Mar 2022 $130 M Purpose of Presentation and reason for Closed Session 6 6

Safe Drinking Water Program Headworks Reservoir Critical Water Quality Improvement Project Replaces Silver Lake & Ivanhoe Reservoirs Two buried concrete reservoirs with a 110- million-gallon combined storage capacity Innovative Approach: Construction Manager At Risk Webcor, Obayashi, Lyles, a Joint Venture (WEBCOR) Construction Cost: $230 Million WEBCOR is actively seeking qualified subcontractors.

Estimated Contract Amount Safe Drinking Water Program Headworks Reservoir Subcontracting Project Component Subcontracting Opportunity Timeline Estimated Contract Amount Headworks East Reservoir Construction Management & Civil Construction 2/12 to 6/15 $80 M Headworks West Reservoir 2/15 to 2/18 $90 M Headworks Ecosystem Restoration Develop wetlands, landscaping and site improvements at reservoir 2/18 to12/19 $7 M RSC Lower Reach Unit 1A 6,400 feet of 84” - 96” Welded Steel Pipeline in the Griffith Park area Pipeline Construction 2/12 to 10/14 $50 M

Over the next quarter century, we plan to transform our water supply sources INCLUDE PIE CHARTS WITH WATER NOW VS. _____ * Excludes 100,000 AFY of water conservation 9

Local Supply Components Investments Over the Next 5 years Program 5-Year Investment San Fernando Valley Aquifer Groundwater Cleanup $100 M Stormwater Capture $274 M Recycled Water $29 M Expanded Water Conservation $250 M

San Fernando Basin Groundwater Treatment Complex Treatment capacity of up to 125,000 AFY Est. in-service date: 2021 Capital Cost: $600M – $900M Annual O&M Cost: $50M - $70M Draft Draft

Cost Effectiveness of the San Fernando Basin Groundwater Treatment Complex 12

Stormwater Capture Tujunga Spreading Grounds Project Estimated Capital Cost: $24 million Design 90% complete Increased recharge up to 8,000 acre-feet per year expected Estimated project completion by 2015 Competitive Bid Process 13 13

Recycled Water – Key Elements Recycled Water Utilization 59,000 AFY by 2035 Recycled Water Master Plan Existing: 8,000 AFY Planned and potential projects: 21,000 AFY Competitive Bid Process Groundwater replenishment with advanced treated wastewater (30,000 AFY): $415 million Garber Recycled Tank: $2 million LA/Glendale Recycled Tank: $2 million Griffith Park South Recycled Tank and Pump Station: $6 million Internal Construction Expand purple pipe network (29,000 AFY): $495 million

Water Reliability Potential Contracting Opportunities Project Component Contracting Opportunity Timeline Contract Amount* RSC Upper Reach Units 5 & 6 15,700 feet of 78” Welded Steel Pipeline in the San Fernando Valley Area Pipeline Construction 9/11 to 10/15 $106 M RSC Upper Reach Unit 7 13,700 feet of 78” Welded Steel Pipeline in the San Fernando Valley area Tunneling 11/12 to 10/15 $120 M City Trunk Line South Unit 6 1,600 feet of 60” Welded Steel Pipeline in the San Fernando Valley 1/13 to 9/15 $14 M Sunset Blvd Trunk Line Rehabilitation Phase II Slipline 36” Pipeline with HDPE. Fairfax Ave to Cahuenga Blvd. Construction - Sliplining 9/13 to 4/14 $9 M Silver Lake Bypass Pipeline 5,000 feet of 66” Welded Steel Pipeline adjacent to Silver Lake Reservoir 10/11 to 1/14 $40 M *Estimate 15